3145, 3150 & 3160 INDUSTRIAL ENGINES Caterpillar


Fuel Injection Pump Housing And Governor (Engines With Taper Drive For Fuel Injection Pump)

Usage:

Remove Fuel Injection Pump Housing and Governor

1. Remove plug (1) from timing pin hole in the fuel injection pump housing and install timing pin.


TIMING PIN HOLE PLUG (Typical Example)
1. Plug.

2. Rotate the crankshaft CLOCKWISE (as viewed from front of engine) until the timing pin drops into the timing slot in the fuel injection pump camshaft.

3. Disconnect wire (3) from fuel shutoff solenoid. Disconnect the fuel lines from the fuel pump.

4. Disconnect the governor control linkage (4). Remove the bracket (2) if so equipped.


FUEL INJECTION PUMP HOUSING
2. Bracket. 3. Wire. 4. Governor control linkage.

5. Remove the tachometer drive adapter housing (5).


TACHOMETER DRIVE
5. Tachometer drive adapter housing.

6. Use ratchet (6) and socket (7) to remove the tachometer drive adapter shaft.


REMOVING SHAFT
6. 8H8572 Ratchet. 7. 9S5031 Deep Well Socket.

7. Using the 9S8520 Puller Group (8), thread the 9S8528 Bolt Assembly into the camshaft. Do not force the bolt assembly. It should thread easily. Install the 9S8527 Bolt by threading it into the gear carrier or adapter. Then tighten the 9S8527 Bolt with a wrench until the gear carrier or adapter "pops" loose. Remove the 9S8520 Puller Group.


LOOSENING CAMSHAFT DRIVE GEAR
8. 9S8520 Puller Group.

8. Remove the plug from the timing hole (10) in the front cover and insert bolt (9). The cover retaining bolt from hole (11) may be used.


INSTALLING BOLT
9. 1D4539 Bolt [5/16 in. - 18 NC, 2.5 in. (63.5 mm) long]. 10. Timing hole. 11. Hole.

9. Rotate crankshaft CLOCKWISE (as viewed from front of engine) until bolt (9) threads into the timing gear and is centered in timing hole (10). With timing pin in slot in fuel pump camshaft and the bolt (9) through the front cover and threaded into the timing gear, the fuel injection pump camshaft is timed to the engine.

10. Remove the fuel injection pump housing retaining bolts (12).


RETAINING BOLTS (Typical Example)
12. Retaining bolts (three).

11. Attach a hoist and remove the fuel injection pump housing and governor as a unit, the weight is approx. 55 lbs. (23 kg).


REMOVING HOUSING (Typical Example)

Install Fuel Injection Pump Housing and Governor

1. Attach a hoist and install the fuel injection pump housing and governor as a unit. Install the fuel injection pump housing retaining bolts.

2. Install the tachometer drive adapter shaft and tighten shaft retaining nut to 32 ± 2 lb. ft. (4.4 ± 0.3 mkg).

3. To check timing remove the timing pin and the bolt. Rotate the crankshaft two revolutions CLOCKWISE (as viewed from front of engine) and install the timing pin or bolt back in place. If the timing pin or bolt can not be installed, the fuel injection pump camshaft must be retimed before proceeding to Step 4.

4. Remove the bolt (9) from the timing gear and install in hole (11). Install the plug into timing hole (10).

5. Remove the timing pin from the timing slot in the fuel injection pump camshaft and install the plug in the timing hole.

6. Install the tachometer drive adapter housing. Connect the wire to the fuel shut off solenoid.

7. Connect the fuel lines to the fuel transfer pump. Install the governor control bracket and linkage.

Caterpillar Information System:

3145, 3150 & 3160 INDUSTRIAL ENGINES Automatic Timing Advance Unit (Engines With Fuel Pump Camshaft Mounted Timing Advance Unit)
3145, 3150 & 3160 INDUSTRIAL ENGINES Automatic Timing Advance Unit (Engines With Engine Camshaft Mounted Timing Advance Unit)
3145, 3150 & 3160 INDUSTRIAL ENGINES Remove Gear From Fuel Injection Pump Camshaft
3145, 3150 & 3160 INDUSTRIAL ENGINES Fuel Return Manifold
3145, 3150 & 3160 INDUSTRIAL ENGINES Fuel Injection Nozzles
3145, 3150 & 3160 INDUSTRIAL ENGINES Fuel Transfer Pump
3145, 3150 & 3160 INDUSTRIAL ENGINES Fuel Filter Base
3145, 3150 & 3160 INDUSTRIAL ENGINES Fuel Injection Lines
3145, 3150 & 3160 INDUSTRIAL ENGINES General Instructions
3145, 3150 & 3160 INDUSTRIAL ENGINES Circuit Breaker
3145, 3150 & 3160 INDUSTRIAL ENGINES Air Compressor Mounting (2N1370 and 2N1371)
3145, 3150 & 3160 INDUSTRIAL ENGINES Fan And Water Pump Drives
3145, 3150 & 3160 INDUSTRIAL ENGINES Fuel Injection Pump Housing And Governor (Engines With Bolt On Drive for Fuel Injection Pump)
3145, 3150 & 3160 INDUSTRIAL ENGINES Governor
3145, 3150 & 3160 INDUSTRIAL ENGINES Fuel Injection Pump Housing
3145, 3150 & 3160 INDUSTRIAL ENGINES Air Inlet Manifold
3145, 3150 & 3160 INDUSTRIAL ENGINES Exhaust Manifolds
3145, 3150 & 3160 INDUSTRIAL ENGINES Crankcase Ventilation Valve
3145, 3150 & 3160 INDUSTRIAL ENGINES Valve Covers
3145, 3150 & 3160 INDUSTRIAL ENGINES Rocker Arm Shaft Assembly
3145, 3150 & 3160 INDUSTRIAL ENGINES Cylinder Heads
3145, 3150 & 3160 INDUSTRIAL ENGINES Pistons
3145, 3150 & 3160 INDUSTRIAL ENGINES Crankshaft Pulley
3145, 3150 & 3160 INDUSTRIAL ENGINES Crankshaft Front Oil Seal
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.