Usage:
Start By:
a. remove front tire and rim assemblies
1. Remove three bolts (2) from traction control wheel sensor guard (1).
2. Disconnect electrical connector (3) and remove traction control wheel sensor guard (1).
3. Disconnect two tube assemblies (8).
4. Remove four bolts (5) and two straps (6). Disconnect front drive shaft (4) from differential pinion yoke (7).
5. Fasten a lifting sling to each side of the front axle housing group as shown. Fasten a hoist to both lifting slings.
6. Remove eight bolts (9) that hold the front axle housing group to the front loader frame. Lower the front axle housing group from the machine. The weight of the front axle housing group is approximately 1134 kg (2500 lb).
NOTE: Install the front axle housing group (Fixed) in the reverse order of removal.
7. Tighten bolts (9) to a torque of 900 ± 90 N·m (660 ± 65 lb ft).
8. Tighten four bolts (5) to a torque of 60 ± 7 N·m (44 ± 5 lb ft).
9. After installing the front tires and rim assemblies, remove (bleed) the air from the brake system. See the topic, "Remove Air From (Bleed) The Brake System" in Systems Operation Testing & Adjusting for this procedure.
End By:
a. install front tire and rim assemblies