3512E Engines Caterpillar


Turbocharger - Remove and Install

Usage:

3512E BZ3

Removal Procedure

Table 1
Required Tooling 
Tool  Part Number  Part Description  Qty 
Bostik - Never-Seez Marine Grade 
Loctite C5-A Copper Anti-Seize Lubricant 


    Illustration 1g06073298

  1. Attach suitable lifting device to muffler (2) the approximate weight of muffler (2) is 160 kg (353 lb). Remove bolts (1) and bolts (3). Remove muffler (3). Repeat for other side.

  2. Remove tubes (4) and (5). Repeat for other side.


    Illustration 2g06073363

  3. Remove heat shield (9) and the band clamp (not shown). Remove bolts (6) and disconnect band clamps (8). Remove exhaust tube (7). Repeat for other side.


    Illustration 3g06073390

  4. Attach suitable lifting device to converter (10). The weight of converter (10) is approximately 115 kg (254 lb). Remove bolts (11) and converter (10). Repeat for other side.


    Illustration 4g06073429

  5. Remove bolts (12).


    Illustration 5g06073508

  6. Attach suitable lifting device to support assembly (13). The weight of support assembly (13) is approximately 470 kg (1036 lb). Remove bolts (14), bolts (15), and bolts (16). Repeat on other side. Remove support assembly (13).


    Illustration 6g06073556

  7. Remove clamps (17) and hose (18).


    Illustration 7g06073594

  8. Disconnect band clamps (19).

    Note: Band clamps (19) in one time use only, discard and replace with new band clamps.



    Illustration 8g06073623

  9. Remove band clamps (20), band clamps (22), and diffuser (21).

    Note: Band clamps (20) and band clamps (22) in one time use only, discard and replace with new band clamp.



    Illustration 9g06073891

  10. Disconnect tube assembly (23), tube assembly (24), tube assembly (27), and tube assembly (28). Disconnect hose assembly (25) and speed sensor (26).


    Illustration 10g06073914

  11. Disconnect tube assembly (31).

    Use a suitable lifting device to remove turbocharger (29). The weight of turbocharger (29) is approximately 46 kg (101 lb). Remove bolts (30) and remove turbocharger (29).

Installation Procedure

  1. Install turbocharger (29) in the reverse order of removal.

    1. Lubricate the threads of band clamps (22) with clean engine oil. Tighten band clamps (22) to a torque of 12 ± 1 N·m (106 ± 9 lb in).

    2. Apply Tooling (A) to the threads of band clamps (20). Tighten band clamps (20) to a torque of 20 ± 1 N·m (177 ± 9 lb in).

    3. Apply Tooling (B) to the threads of band clamps (19). Tighten band clamps (19) to a torque of 12 ± 1 N·m (106 ± 9 lb in).

    4. Apply Tooling (B) to the threads of bolts (6).
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.