C175-16 Locomotive Engine Caterpillar


High Pressure Fuel Rails - Remove and Install

Usage:

C175-16 R1X

Removal Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
339-9354  Fuel LineCap Kit 
265-2256 Wipers 

Start By:

  1. Remove the air inlet manifold.


NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat products.

Dispose of all fluids according to local regulations and mandates.


------ WARNING! ------

Do not open the high pressure fuel system without allowing the fuel system to purge. After the engine has shut down, allow the fuel system to purge for ten minutes. This operating fuel system contains high pressure. Exposure to high pressure fuel can result in personal injury.


Note: Use Tooling (A) to cap tube assemblies, fittings, ports, and any opening in the fuel system in order to prevent contamination.

Note: Do not remove all the quills in order to maintain the alignment of the rail. Maintain at least two quills attached to the rail at all times. If necessary, replace with new quill.



    Illustration 1g01285837

  1. Remove bolt (1) and the clamp from tube assembly (2).


    Illustration 2g01822393


    Illustration 3g01443406

    Note: Cap tube assemblies, fittings, ports, and any opening in the fuel system in order to prevent contamination.

  2. Disconnect tube assembly (3) and remove the bolts on tube assembly (2). Remove bolts (5). Disconnect tube assembly (4). Remove tube assembly (2) and the O-ring seals. Remove bolts (6).

    Note: If necessary, secondary fuel filter lines may need removed in order to remove tube assembly (2).

    Note: Replace with new bolts (5)



    Illustration 4g01285008


    Illustration 5g01822394

  3. Remove bolts (9). Remove bolts (10) and bolts (11). Repeat for the opposite side.

    Note: Replace with new bolts (9)

  4. Remove tube assembly (7). Remove tube assembly (8) and the O-ring seal.


    Illustration 6g01822395

  5. Attach a suitable lifting device onto fuel rail (13). The weight of fuel rail (13) is approximately 60 kg (131 lb). Remove bolts (12). Remove fuel rail (13).

  6. Place the high-pressure fuel rail on a clean surface. Support the rail so the weight is not resting on the quills. All openings should be capped or plugged in order to prevent contamination.

  7. Repeat Step 5 for the opposite side.

Installation Procedure

Table 2
Required Tools 
Tool  Part Number  Part Description  Qty 
339-9354  Fuel LineCap Kit 
265-2256 Wipers 

Note: When Tooling (A) is removed be careful to prevent contamination.



    Illustration 7g01822395

  1. Attach a suitable lifting device onto fuel rail (13). The weight of fuel rail (13) is approximately 60 kg (131 lb). Install fuel rail (13). Install bolts (12).


    Illustration 8g01443632

  2. Tighten bolts (12) in the sequence that is shown in Illustration 8. Tighten bolts (12) to a torque of 100 ± 20 N·m (74 ± 15 lb ft).


    Illustration 9g01822394


    Illustration 10g01285008

  3. Install the new O-ring seals. Lubricate the ends of tube assembly (8) and the O-ring seals with clean engine oil. Install new bolts (9) and the washers. Evenly hand tighten new bolts (9) in order to assemble tube assembly (8) and the O-ring seals. To prevent cutting or damage of the O-ring seal. Install tube assembly (7). Install bolts (10) and (11) hand tight. Evenly tighten new bolts (9) to a torque of 20 N·m (15 lb ft).

    Note: New bolts (9) do not rotate more than 90 degrees at a time.

  4. Evenly tighten new bolts (9) to a torque of 40 N·m (30 lb ft).

    Note: New bolts (9) do not rotate more than 45 degrees at a time.

  5. Tighten bolts (10) and (11) to a torque of 40 ± 10 N·m (30 ± 7 lb ft).


    Illustration 11g01443406


    Illustration 12g01822393

    Note: If necessary, secondary fuel filter lines may need installed after tube assembly (2) has been installed. Do not attempt to push the flanges past O-ring seals by hand in order to prevent cutting or damage.

  6. Install the new O-ring seals into the pump outlet, the inlet, and the junction block. Lubricate O-ring seals and the end of tube assemblies (2) and (4) with clean engine oil. Install new bolts (5) and washers. Evenly hand tighten new bolts (5) in order to engage tube assemblies (2) and (4) with the O-ring seals. To prevent or damage of the O-ring seal. Position bolts (6) and tighten by hand. Evenly hand tighten bolts (5). Evenly tighten bolts (6) to a torque of 20 N·m (15 lb ft). Evenly tighten new bolts (5) to a torque of 20 N·m (15 lb ft). Evenly tighten bolts (6) to a final torque of 55 ± 10 N·m (41 ± 7 lb ft). Evenly tighten bolts (5) to a final torque of 40± 10 N·m (30± 7 lb ft).

    Note: The bolts in tube assembly (2) do not rotate more than 90 degrees at a time.

  7. Evenly tighten the bolts in tube assembly (2) to a torque of 40 N·m (30 lb ft).

    Note: The bolts in tube assembly (2) do not rotate more than 45 degrees at a time.



    Illustration 13g01285837

  8. Install the bracket, the clamp, and bolt (1) onto tube assembly (2). Use the bracket to adjust the position of the clamp and bolt (1) for alignment to tube assembly (2).

  9. Repeat this process on the opposite side.

End By:

  1. Install the flow limiters.

  2. Install the air inlet manifold.

Caterpillar Information System:

Back to top