C3.3 Industrial Engine Caterpillar


Alternator - Install

Usage:

C3.3 E3K

Installation Procedure



    Illustration 1g01263045
    Typical example

  1. If necessary, install the pulley to the alternator. Follow Steps 1.a and 1.b for the method in order to install the pulley to the alternator.

    Note: This method may not be suitable for some configurations of pulley.

    1. Install pulley (8) and nut (7) to the shaft of alternator (4).

    2. Hold the shaft of the alternator with an allen wrench. Use a cranked ring spanner (box wrench) in order to tighten nut (7). Tighten the nut to a torque of 80 N·m (59 lb ft).

  2. Install alternator (4) to bracket (3) and install bolt (5) to alternator (4).

  3. Install washer (2) and nut (1) to bolt (5) finger tight.

  4. Install bolt (6) through adjusting link (9) to alternator (4) finger tight.

  5. Install the V-belts. Refer to the Disassembly and assembly, "V-belts - Remove and Install" for the correct procedure.

  6. Tighten nut (1) and bolt (6) to a torque of 22 N·m (16 lb ft).

  7. Connect the harness assembly to alternator (4).

  8. Turn the battery disconnect switch to the ON position.
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.