Introduction

This special instruction provides the procedure for installing and removing the V-PAT bulldozer for the D5N and the D6N Track-Type Tractor.

Do not perform any procedure in this Special Instruction until you fully understand the information.

------ WARNING! ------

Do not attempt to disassemble or assemble this machine until you read and understand the disassembly and assembly instructions. Improper disassembly and assembly procedures could result in injury or death.

----------------------


NOTICE

Do not allow any dirt or foreign material to get into the hydraulic system during assembly, connection of lines, when components are filled with fluid, or during any maintenance operation.


Note: Clean all pins and bores in order to remove any dirt or corrosion before assembly.

Note: Before, you begin this procedure attach a Do Not Operate Tag to the start switch of the machine.

Weights

Table 1
Approximate Weights    
Item     weight    
Blade arrangement D5N XL     931 kg (2050 lb)    
Blade arrangement D5N LGP    
950 kg (2090 lb)    
Blade arrangement D6N XL    
1095 kg (2410 lb)    
Blade arrangement D6N LGP    
1250 kg (2760 lb)    
Tilt cylinder Gp D5N    
63 kg (139 lb)    
Tilt cylinder Gp D6N    
82 kg (181 lb)    

Installation Of Bulldozer

Necessary Parts

Table 2
Parts List for C-Frame    
Item     Qty     Part Number     Description    
1     6     124-5235     Shim    
2     24 (1)     8T-4123     Plated Washer    
3     3     7X-2562     Bolt    
4     1     104-7391     Cap    
5     1     161-2114     Pin  (2)    
1 160-5691     Pin  (3)    
6     1     160-5692     Spacer  (2)    
1 161-2113     Spacer  (3)    
7     1     147-4359     Pin    
1 145-0803     Pin    
( 1 ) The item only requires three at final assembly. An Additional amount of the quantity is used during the assembly process.
( 2 ) Only use this item if you are installing the V-PAT bulldozer on the D5.
( 3 ) Only use this item if you are installing the V-PAT bulldozer on the D6.

Table 3
Tilt Cylinder Group    
Item     Qty     Part Number     Description    
8     1     160-0045     Tilt Cylinder Gp  (1)    
1 160-0054     Tilt Cylinder Gp  (2)    
( 1 ) Only use this item if you are installing the V-PAT bulldozer on the D5.
( 2 ) Only use this item if you are installing the V-PAT bulldozer on the D6.

Table 4
Parts List for Lines Group    
Item     Qty     Part Number     Description    
9     10     3B-8489     Grease Fitting    
10     6     6V-8398     O-Ring Seal    
11     2     197-2477     Pin    
12     7     8T-4192     Bolt    
13     10     8T-4139     Bolt    
14     27     8T-4223     Hard Washer    
15     2     197-2479     Hose As    
16     4     8T-4136     Bolt (1)    
17     8     8T-4121     Hard Washer (1)    
18     2     096-7033     Cotter Pin    
19     4     148-8340     Connector As    
20     3     148-8364     Elbow As    
21     2     3B-6552     Elbow    
22     2     5P-7464     Clip    
23     2     5P-7465     Clip    
24     6     5P-7466     Clip    
25     6     5P-7467     Clip    
26     6     5P-8112     Grommet    
27     2     6V-1249     Grommet    
28     6     6V-7687     Locknut    
29     2     7G-3832     Grommet    
30     2     7G-3833     Clip    
31     2     7G-3834     Clip    
32     2     7Y-1858     Washer    
33     2     8T-4183     Bolt    
34     6     8T-4184     Bolt    
35     3     8T-4244     Nut    
36     2     204-5093     Plate    
2 203-2899     Plate    
37     1     295-2151     Channel As (Right Hand) (1)    
1 211-0571     Channel As (Right Hand) (2)    
38     1     295-2152     Channel As (Left Hand) (1)    
1 211-0573     Channel As (Left Hand) (2)    
39     1     292-9380     Guard As  (1)    
1 200-2645     Guard As  (2)    
40     1     8T-4194     Bolt  (1)    
1 3E-4319     Taperlock Stud  (2)    
41     2     294-7277     Guard As  (1)    
2 197-2478     Guard  (2)    
42     2     112-7454     Hose As  (1)    
2 187-9028     Hose As  (2)    
43     2     112-7455     Hose As  (1)    
2 187-9030     Hose As  (2)    
44     2     262-0649     Hose As  (1)    
1 187-9031     Hose As  (2)    
1 187-9032     Hose As  (2)    
45     2     3B-8488     Grease Fitting (2)    
46     1     2P-6470     Clip (2)    
47     1     2P-6471     Clip (2)    
48     4     167-7270     Film  (1)    
49     2     294-5386     Baffle  (1)    
50     4     8T-4133     Nut  (1)    
51     2     294-5374     Plate  (1)    
52     2     294-7278     Plate  (1)    
( 1 ) Only use this item if you are installing the V-PAT bulldozer on the D6.
( 2 ) Only use this item if you are installing the V-PAT bulldozer on the D5.

Table 5
Blade Arrangement    
Item     QTY     Part Number     Description    
53     1     104-7412     Blade arrangement D5N XL    
1 108-8585     Blade arrangement D5N LGP    
1 110-5230     Blade arrangement D6N XL    
1 112-7446     Blade arrangement D6N LGP    

Table 6
Parts Needed for Assembly Only.    
Item     Qty     Part Number     Description    
A     3     7X-2568     Bolt    
B     3     2S-7612     Spacer    
C     1     9U-5986     Eyebolt    

Bulldozer V-PAT Installation




Illustration 1g01298385

  1. Loosen four bolts (F) on block assembly (H). The block assembly is located on the inside of the front C-frame (J). Remove two spacers (G) .



    Illustration 2g01298386

  1. Reposition spacers (G) in front of the pitch link assembly (H) .

  1. Tighten four bolts (F) hand tight.



    Illustration 3g01298394

  1. Remove pin retainer (K) and pin (L) from pitch link assembly (H) .



    Illustration 4g01299587

  1. Remove the pitch link assembly (M) from the block assembly (H) and C-frame (J) .

    Note: There is one spacer above the bearing and one spacer below the bearing in the pitch link assembly. The spacers are not shown. Save the spacers for assembly.




    Illustration 5g01299596

  1. Remove the pin retainer (N) and pin (P) from the center bracket on the back of the blade arrangement.

  1. Install the link assembly (M) to the back of the blade. Install one spacer above the bearing and one spacer below the bearing in the link assembly. Use pin (P), retainer (N), and two bolts that were removed in Step 6.



    Illustration 6g01299597

    Note: Install link assembly (M) with grease fitting (Q) on the right-hand side.




    Illustration 7g01020169

  1. Raise C-frame (J). Place 203.2 mm (8 inch) blocking (R) under the center of the C-frame. Lower C-frame (J) onto the blocking.



    Illustration 8g01019494

  1. Attach a lifting device to the blade assembly.



    Illustration 9g01020119

  1. Position the blade in front of C-frame (J) with link assembly (M) through the opening in C-frame (J).

  1. Center the bearing in the pitch link assembly (M) over the hole in the block assembly.

  1. Install spacers on the top of the bearing and the bottom of the bearing in the link assembly. Use the spacers that were removed in Step 5.

  1. Install pin (L), retainer (K), and bolts that were removed in Step 4 in order to secure the link in the block assembly (H) .



    Illustration 10g01299599

  1. Adjust the position of the blade so that the spherical bearing in the upper center bracket on the back of the blade is centered over sleeve (S) in the lower bore of C-frame (J).

  1. Lower the hoist so that the spherical bearing rests on top of sleeve (S).

    Note: Do not remove the hoisting equipment from the blade assembly.




    Illustration 11g01298646

    This illustration shows spherical bearing (Z) on the back of plate for the D6N frame Gp .




    Illustration 12g01299600

  1. Lower pin (7) through the top three bores of C-frame (J) and through the spherical bearing in the blade assembly.

  1. Place pin (5) through the top two bores of C-frame (J) into the top of pin (7) .



    Illustration 13g01299601

  1. Place all shims (1) on top of pin (5) and place cap (4) on top of shims (1). Refer to Illustration 13.



    Illustration 14g01020141

  1. Use bolts (A), washers (2), and spacers (B) to press pin (7) into the lower sleeve. Turn bolts in equal amounts in order to press the pin into position.

    Note: During the process of pressing pin (7) into place, spacers (B) or additional washers (2) must be added to the bolts when thread depth is utilized.




    Illustration 15g01299602

  1. Remove bolts (3), cap (4), and shims (1) .



    Illustration 16g01020146

  1. Install lifting eye (C) in top of pin (5). Remove pin (5) from C-frame (J).

    Note: The lifting equipment may be removed from the blade assembly at this point. The blade assembly will rest with only one dozer end bit on the floor. The blade assembly can pivot about pin (7) .




    Illustration 17g01020148

  1. Assemble spacer (6) into C-frame (J).

    Note: Route tilt cylinder hoses between C-frame (J) and spacer (6). Refer to Illustration 17 for the position.

  1. Remove the tilt cylinder pin and two spacers from the upper right corner of the blade assembly.



    Illustration 18g01020149

  1. Position the head end of tilt cylinder (8) into C-frame (J). Make sure that the spherical bearing is positioned on top of spacer (6).

  1. Install pin (5), shims (1), and cap (4) on top of C-frame (J). Use bolts (A), washers (2), spacers (B), and bolts (3) to seat pin (5) into C-frame (J).

    Note: Pin (5), bolts (A), and spacers (B) are not shown in the illustration.




    Illustration 19g01020151

  1. Check the gap between the top of C-frame (J) and cap (4). Adjust the number of shims (1) until only one shim is totally protruding above the top face of C-frame (J).

    Note: Make sure that there is a gap between cap (4) and the top of C-frame (J) after installing pin (5). Cap (4) may contact the top of C-frame (J) in the area under each bolt head.

  1. Remove plugs from tilt cylinder (8). Use an appropriate container to catch any oil that may drain from the cylinder.



    Illustration 20g01297831

    187-9026 Angle and Tilt Lines Gp for D5N




    Illustration 21g01297834



    Illustration 22g01297837

    295-1830 Angle and Tilt Lines Gp for D6N

  1. Use connectors (42, 43, and 44) and seals (10) to install hydraulic hoses on tilt cylinder (8) .



    Illustration 23g01298627

    Note: Before tightening the hydraulic hose connections, put a twist in the hydraulic hoses so that the hoses do not contact the cylinder rods. Refer to Illustration 23.




    Illustration 24g01298600

  1. Install the rod end of cylinder (8) to the blade assembly. Install the following items: pin, retainer, bolts and spacers Refer to Step 23 for removed components.

    Note: Install one spacer above the cylinder and one spacer below the cylinder (8) .

  1. Install guard assembly (39) to tilt cylinder (8). Use bolts (12) and washers (14) .



    Illustration 25g01298615

  1. Install one angle cylinder to the blade assembly. Use the pin, the retainer, the bolt, the washer, and the spacers that are provided with the blade assembly.

    Note: Install one spacer above the bulldozer angle cylinder and one spacer below the bulldozer angle cylinder.

  1. Repeat Step 31 in order to install the angle cylinder on the other side of the blade assembly.



    Illustration 26g01298614

  1. Install clips (24 and 25) to the tilt cylinder (8) and the tilt cylinder hoses. Use bolts (12 and 40), washers (14), and grommet (26) .



    Illustration 27g01298432

  1. Loosen four bolts (F) on the back of block assembly (H).

    ReferenceRefer to Operation and Maintenance Manual, "Dozer Blade Tip" for information on adjusting the blade and the procedure.

  1. Move spacers (G) to the back side of the block assembly (H). Tighten four bolts (F) to 900 ± 100 N·m (664 ± 75 lb ft).

Removal Of Bulldozer

Table 7
Required Tooling    
Item     Qty     Part Number     Description    
T     1     9U-5346     Nut    
U     1     9X-8399     Washer    
V     1     6V-3175     Double Acting Cylinder    
W     1     9U-5344     Puller Stud    
X     2     FT-1714     Wedge (1)    
Y     1     3S-6224     Electric Hydraulic Pump Gp    
( 1 ) This tool may be fabricated. Refer to Illustration 28 and Table 8.



Illustration 28g01019393

Make wedges from SAE 1020 steel.

Table 8
Specifications    
Item     Dimension    
A    
25.4 mm (1 inch)    
B    
50.8 mm (2 inch)    
C    
152 ± 2 mm (6 ± 0.08 inch)    
D    
12.7 ± 2 mm (0.5 ± 0.08 inch)    
E    
25.4 mm (1 inch) (1)    



Illustration 29g01298385

  1. Loosen four bolts (F) on the back of block assembly (H). Block assembly (H) is located on the back side of C-frame (J). Remove two spacers (G) .



    Illustration 30g01298386

  1. Reposition spacers (G) in front of block assembly (H).

  1. Hand tighten four bolts (F) .

    Note: Spacers (G) may already be located in front of block assembly (H) as a result of previous adjustment.




    Illustration 31g01020169

  1. Raise C-frame (J). Place 203.2 mm (8 inch) blocking (R) under the center of the C-frame. Lower C-frame (J) onto the blocking (H) .



    Illustration 32g01298614

  1. Remove bolts (15), washers (16), locknuts (17), and clamps (14) from tilt cylinder (8) .



    Illustration 33g01298637

  1. Remove bolts (12), washers (13), and guard assembly (8) from tilt cylinder (8).

  1. Disconnect the hydraulic hose from cylinder (8). Use a suitable container to catch any oil that may drain from the holes of the cylinder. Cap hose and plug cylinder ports in order to prevent foreign material from entering the hydraulic system.

  1. Remove the bolts, the washers, the retainer, and the pin in order to free the rod end of cylinder (8).

    Note: There is one spacer above the rod end and one spacer below the rod end. Save the spacers for reassembling of the blade assembly.




    Illustration 34g01020149

  1. Remove bolts (3), cap (4) and shims (1) .



    Illustration 35g01020186

  1. Assemble eyebolt (C) to pin (5). Use a hoist and eyebolt (C) to remove pin (5) .



    Illustration 36g01020189

  1. Use the hoist to remove cylinder (8).



    Illustration 37g01019494

  1. Attach a lifting device to the blade assembly. Remove any slack from the lifting equipment.



    Illustration 38g01020148

  1. Remove spacer (6) from C-frame (J) .



    Illustration 39g01020200

  1. Assemble stud puller (W) into the threads of pin (7).

  1. Assemble cylinder (V), washer (U), and fast runner nut assembly (T) to stud puller (W).

  1. Hand tighten fast runner nut assembly (T).

  1. Connect hose from hydraulic pump group (Y) (not shown) to cylinder (V) .



    Illustration 40g01020202

  1. Insert wedges (X) between the upper center bracket and the C-frame.

  1. Use the hydraulic pump and the hydraulic cylinder to raise pin (7).

    Note: Raise the cylinder to the end of the stroke and lower the cylinder rod. Hand tighten the nut and raise the cylinder again. Continue this procedure until the pin can be removed by hand.




    Illustration 41g01020203

  1. Remove one blade angle cylinder from the blade assembly.

    Note: There is one spacer above the rod end and one spacer below the rod end. Save the spacers for reassembling of the blade assembly.

  1. Repeat Step 20 on the other side of the blade assembly.



    Illustration 42g01298394

  1. Remove pin retainer (K) and pin (L) from block assembly (H).

    Note: There is one spacer above the link assembly and one spacer below the link assembly. Save the spacers for reassembling of the blade assembly.

  1. Separate the blade assembly from the C-frame.

Foldable Blade Instructions

Introduction

The following outlines the basic steps and procedure ti use in order to fold the left side of a 257-8113 Angling Blade .

Note: All safety information, warnings, and instructions must be read and understood before performing any operation or any maintenance procedures.

Shipping Information

Table 9
257-8113 Angling Blade    
Blade Weight    
1690 kg (3725 lb)    
Blade Width    
4082 mm (160.7 inch)    
Blade Height    
1277 mm (50.3 inch)    
Shipping overall width    
3000 mm (118.1 inch) with blade folded    

Description of the Foldable Blade

Table 10
Blade Arrangement    
Item     QTY     Part Number     Description    
53     1     257-8113     Angling Blade    
1 257-8156     Angling Blade (Fine Grading)    



Illustration 43g02280815

Working position




Illustration 44g02281519

Transportation position

Note: In transportation position, the blade must be parallel to the ground.

Procedure to Fold the Blade




    Illustration 45g02283793

  1. Unlock the removable side of the blade.

    1. Slightly raise the blade in order to clear the blade from the ground.

    1. Remove the cotter pin and pins (1) .

    1. Pull out bar (2) after having removed both of the retention cotter pins.



    Illustration 46g02283814

  1. Fold the removable side of the blade. Place the end of bar (2) in the hole at the top left corner of the blade and push in order to fold the blade.



    Illustration 47g02283840

  1. Place bar (2) and pins (1) as shown in Illustration 47 in order to lock the removable side of the blade.

    Note: Proceed to Steps 4 through 8 for LGP machines only.




    Illustration 48g02295654

  1. Remove right-hand pins (3) from each link. Refer to Illustration 48 for the correct pins to remove.



    Illustration 49g02295673

    Left-hand side pin placement




    Illustration 50g02295693

    Right-hand side pin placement

    Note: The angling cylinders must be actuated slowly and without jerks to avoid hitting the blade.

  1. From the cab, block the blade in flat position on the ground and actuate the angling cylinders to the right in order to place the links in the transportation position. Refer to illustrations 49 and 50 for the transportation position for the links.

  1. Insert the left-hand pin as shown in Illustration 49.

  1. Insert the right-hand pin as shown in Illustration 50.

  1. From the cab, slightly raise the blade and make the blade completely swivel to the left.

Procedure to Unfold the Blade

Note: Perform Steps




    Illustration 51g02296596

    Left-hand side pin placement




    Illustration 52g02296614

  1. Remove the right-hand pins from each link.

  1. From the cab, slightly raise the blade and make the blade swivel to the right until the blade is perpendicular to the machine centerline.



    Illustration 53g02283840

  1. Remove pins (1) and bar (2) in order to unlock the removable side of the blade.



    Illustration 54g02283814

  1. Unfold the removable side of the blade. Place the end of bar (2) in the hole at the top left corner of the blade and push in order to unfold the blade.



    Illustration 55g02283793

  1. Lock the removable side of the blade.

    1. Place bar (2) at the rear of the blade and attach with two cotter pins.

    1. Install pins (1) in order to secure the blade in the working position.



    Illustration 56g02296673

  1. From the cab, block the blade in flat position on the ground and actuate the angling cylinders to the left in order to place the links in working position.

  1. Insert the pins in order to lock the links and the blade in working position. Refer to Illustration 56 for the correct location of the links.

Caterpillar Information System:

583T Pipelayer Engine Oil Sample - Obtain
583T Pipelayer Engine Oil Level - Check
2004/09/27 A New Solid Retaining Ring Replaces The Spiral Lock Ring in the Transmission Clutches {3030, 3155}
2004/09/27 New Check Valve For The Ride Control System {5067}
583T Pipelayer Engine Crankcase Breather - Clean
583T Pipelayer Engine Air Precleaner - Clean
D8T Track-Type Tractor Final Drive Oil Sample - Obtain
D8T Track-Type Tractor Cutting Edges and End Bits - Inspect/Replace
2003/08/25 Idler Guards are Available to Extend Life of the Track link and Roller {7169}
2003/08/25 Idler Guards are Available to Extend life of the Track link and Roller. {4159}
963C Track-Type Loader Machine Systems Bucket - Remove and Install
2003/08/25 New Bolts Are Available For The Flywheel Housing on 988F Wheel Loaders {1157}
2003/08/25 A New Latch Assembly Is Used on the Wheel Skidders {7251}
2003/08/25 A New Solenoid Provides Better Starting Conditions {1259}
994D Wheel Loader Welding on Machines and Engines with Electronic Controls
D8T Track-Type Tractor Fuses and Circuit Breakers - Replace/Reset
C11 and C15 Engines for Caterpillar Built Machines CID 0102 FMI 04 Boost Pressure Sensor short to ground
994D Wheel Loader Cooling System Coolant Level - Check
D8T Track-Type Tractor Ether Starting Aid Cylinder - Replace
2003/09/01 Correction to Testing and Adjusting , "Margin Pressure Adjustment Procedure" {4306, 5070, 5086}
D8T Track-Type Tractor Final Drive Oil - Change
D8T Track-Type Tractor Final Drive Oil Level - Check
D8T Track-Type Tractor Fuel System - Prime
C27 and C32 Engines for Caterpillar Built Machines CID 0342 FMI 08 Secondary Engine Speed signal abnormal
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.