D6N Track-Type Tractor Power Train Caterpillar


Steering Differential and Brake - Assemble

Usage:

D6N AKM

Assembly Procedure

Table 1
Required Tools 
Tool  Part Number  Description  Qty 
138-7573  Link Bracket 
3K-4897  Spring Pin 
6V-4072  Spanner Wrench 
138-7575  Link Bracket 
8S-5132  Plate 
3B-1915 Bolt 
6V-8801 Nut 
5M-2894 Washer 
1B-9575 Bolt 
1D-4716 Full Nut 
9M-1974 Washer 
6V-4980  Torque Screwdriver 
6V-4980  Torque Screwdriver 
FT-2214 Adapter 
8T-5096  Dial Indicator Group 
8C-8422  Sealant   

Reference: Refer to Specifications, "Differential Drive and Brake Group"
in the Service Manual for your machine.



    Illustration 1g00824415

  1. Install O-ring seal (63) in brake housing (42).

    Note: If bearing cone (65) was removed, a new bearing cone must be installed.

  2. Raise the temperature of bearing cone (65) to a maximum temperature of 135 °C (275 °F).

  3. Install bearing cone (65) on housing (41).

  4. Lower the temperature of bearing cups (62) and (64).

  5. Install bearing cups (62) and (64) in brake housing (42).

    Note: If bearing cone (61) was removed, a new bearing cone must be installed.

  6. Raise the temperature of bearing cone (61) to a maximum temperature of 135 °C (275 °F).

  7. Install bearing cone (61) in housing (41).


    Illustration 2g00993935

  8. Attach Tooling (F) and a suitable lifting device to brake housing (42).

  9. Install brake housing (42) in housing (41). The weight of brake housing (42) is approximately 77 kg (170 lb). The weight of housing (41) is approximately 25 kg (55 lb).


    Illustration 3g00992013

  10. Install plate (57) and three bolts (56).

  11. Install Tooling (K) on plate (57). Do not install the shims at this time.

  12. Position brake housing (42) on wood blocks to raise housing (41) off the floor.

  13. Use Tooling (K) to rotate housing (41).

  14. Use Tooling (K) to measure the rotational torque. Tighten three bolts (56) equally until the proper rotational torque is reached. The rotational torque should be 2.25 N·m (19.914 lb in) to 4.0 N·m (35.40 lb in).

  15. Remove Tooling (K).


    Illustration 4g00992026

  16. When the rotational torque is correct, use a feeler gauge to measure the Gap (X) between the housing and plate (57) in three places. Average the three measurements to determine the correct shim pack thickness.

  17. Remove three bolts (56) and plate (57).

  18. Position correct shim pack (58) and plate (57) on the housing.

  19. Install three bolts (56). Tighten three bolts (56) equally.


    Illustration 5g00991881

  20. Use Tooling (K) to recheck the rotational torque.

  21. Remove Tooling (K).

  22. Install three remaining bolts (56) and tighten three remaining bolts (56).


    Illustration 6g00831715

  23. Install spring (60) and piston (59) in brake housing (42).


    Illustration 7g00824351

  24. Install ring seal (55), ring (54), and retainer (53) in brake housing (42).

  25. Install bolts (52).


    Illustration 8g00824819


    Illustration 9g00824349

  26. Install thrust washer (51).

  27. Install ring (50) in hub (48).

  28. Install friction discs and brake plates (49). Install hub (48).

  29. Install thrust washer (47) and retainer (46).

  30. Install bolts and washers (45).


    Illustration 10g00993964

  31. Attach Tooling (F) and a suitable lifting device to brake housing (42).

  32. Install brake housing (42) in final drive housing (44). The weight of brake housing (42) is approximately 150 kg (335 lb).

  33. Install bolts (43).


    Illustration 11g00824265

  34. Install bevel gear (40) in housing (41).

  35. Install bolts (39).

  36. Install shims (38) and support bracket (37) in the housing.

  37. Install bolts (36).


    Illustration 12g00824263

  38. Lower the temperature of bearing cups (35). Install bearing cups (35) in carrier (31).


    Illustration 13g00831777

  39. Heat bearing cone (34) to a maximum temperature of 135 °C (275 °F).

  40. Install bearing cone (34) on pinion (27).

  41. Raise the temperature of bearing cone (33) to a maximum temperature of 135 °C (275 °F).

  42. Install pinion gear (27) in carrier (31) and bearing cone (33).


    Illustration 14g00991945

  43. Install washer (30) and lockwasher (29) in the pinion.

  44. Install nut (28) in the pinion.

  45. Position pinion (27) in a soft jawed vise.

  46. Use Tooling (C) to tighten nut (28) and preload the bearings.


    Illustration 15g00994001

  47. Position carrier (31) on two wood blocks.

  48. Use Tooling (J) to measure the rotational torque. The correct rotational torque is 0.3 N·m (2.7 lb in) to 1.35 N·m (11.949 lb in).

  49. Bend the tang on lock washer (29) in one of the four slots in nut (28). Refer to illustration 14.


    Illustration 16g00831845

  50. Position the pinion and carrier (31) on the support bracket.

  51. Install bolts (32).


    Illustration 17g00991985

  52. Use Tooling (L) to check the backlash of pinion gear (27). Measure the backlash at three equally spaced teeth on pinion (27). Average the three measurements. The correct backlash is 0.210 ± 0.075 mm (0.0083 ± 0.0030 inch). If necessary, remove support bracket (37) to add or remove shims from shim pack (38).


    Illustration 18g00823872


    Illustration 19g00832063

  53. Install bearing (25) in planetary gear (22).

  54. Position planetary gear (22) and discs (26) in planetary carrier (18).

  55. Install shaft (24) in planetary carrier (18).

  56. If the rubber in pin (23) is damaged, replace the pin.

  57. Align the hole in shaft (24) with the hole in planetary carrier (18).

  58. Install pin (23). Install pin (23) so that the end of the pin (23) is even with the surface of planetary carrier (18).

  59. Repeat Steps 53 through 58 for the remaining planetary gears.

  60. Install the retaining ring in planetary carrier (18).

  61. Connect planetary carrier (18) and ring gear (6).

  62. Use Tooling (B) to compress the retaining ring that holds planetary carrier (18) in ring gear (6).

  63. Install gear (21), plate (20), and bolts (19) in planetary carrier (18).

  64. Tighten bolts (19) to a torque of 50 ± 10 N·m (37 ± 7 lb ft).


    Illustration 20g00823759

  65. Install spacer (17).

  66. Install retaining ring (16), sun gear (15), and lock ring (14) into planetary carrier (18).


    Illustration 21g00823775

  67. Install bearing (13), discs (8), planetary gear (9), and shaft (11) in planetary carrier (7).

  68. Use a hammer and a punch to push pin (12) in shaft (11).

  69. Install O-ring seal (10) on planetary carrier (7).


    Illustration 22g06187075

  70. Install planetary carrier (7), thrust ring (5A), and retaining ring (5) in ring gear (6).

  71. Install slinger (4) and remaining bolts (2) in planetary carrier (7).

  72. Apply a coat of Tooling (M) to the face of slinger (4) that comes in contact with planetary carrier (7).


    Illustration 23g00823691

  73. Install Tooling (A) and a suitable lifting device.

  74. Install sliding carrier (3). The weight of sliding carrier (3) is approximately 48 kg (105 lb).

  75. Remove Tooling (A).

End By:

  1. Install the left-hand final drive, the steering differential, and the brake. Refer to Disassembly and Assembly, "Final Drive, Steering Differential, and Brake (Left Side) - Install"
    .

Caterpillar Information System:

966G Series II Wheel Loader and 972G Series II Wheel Loader Hydraulic System Hydraulic System Troubleshooting
3054E Industrial Engine Flywheel - Install
938G Wheel Loader and IT38G Integrated Toolcarrier Reference Material
938G Wheel Loader and IT38G Integrated Toolcarrier Seat
963C Track-Type Loader Power Train Transmission Stall - Test
AD45B Underground Articulated Truck Rollover Protective Structure (ROPS) - Inspect
AD30 Underground Articulated Truck Hydraulic System Oil Filter (Pilot) - Replace
AD30 Underground Articulated Truck Pressure Sensor (Transmission Oil) - Test - If Equipped
AD30 Underground Articulated Truck Radiator Core - Clean
AD30 Underground Articulated Truck Fuses - Replace
AD30 Underground Articulated Truck Fuel Tank Cap and Strainer - Clean
973C Track-Type Loader Steel Mill Arrangement Maintenance Interval Schedule
D6N Track-Type Tractor Power Train Axle - Remove and Install
953C Track-Type Loader Engine Starting with Jump Start Cables
CAES Installation For Wheel Loader{7604} CAES Installation For Wheel Loader{7604}
CAES Installation For Wheel Tractor Scraper{7604} CAES Installation For Wheel Tractor Scraper{7604}
Rotating Group Adjustment Instructions for Bosch Rexroth Hydraulic Pumps and Motors {3203, 4351, 5058, 5070} Rotating Group Adjustment Instructions for Bosch Rexroth Hydraulic Pumps and Motors {3203, 4351, 5058, 5070}
953C Track-Type Loader Cooling System Extended Life Coolant - Change
966G Series II Wheel Loader and 972G Series II Wheel Loader Machine Systems Power Guard Actuator
953C Track-Type Loader Cooling System Water Temperature Regulator - Clean/Replace
966G Series II Wheel Loader and 972G Series II Wheel Loader Machine Systems Toggle Switch (Power Guard Actuator)
953C Track-Type Loader Engine Oil Sample - Obtain
AD30 Underground Articulated Truck Hydraulic System Oil Level - Check
AD30 Underground Articulated Truck Service Inspection