3412C Engine Caterpillar


Fuel Injection Pump Housing - Assemble

Usage:

SPS342 2LZ

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     8T-5287     Wrench     1    
B     8S-2244     Pump Extractor     1    
C     8S-2241     Camshaft Bearing Tool Group     1    
D     4C-9581     Rack Zero Pin     2    
E     9V-5692     Spring Compressor     1    
E     4C-4734     Wrench     1    



    Illustration 1g00798430

  1. Use Tool (C) in order to Install camshaft bearings (78), if necessary.

  1. Install fourteen bolts (79), the cover and the gasket from each side of fuel injection pump (10). Tighten the bolts to a torque of 14 ± 4 N·m (10 ± 3 lb ft).



    Illustration 2g00798421

    Note: Do not damage the camshaft bearings when the camshaft is installed.

  1. Install camshaft (77) in fuel injection pump housing (10) .



    Illustration 3g00798418

  1. Install the lock (76) for the camshaft.

  1. Install two bolts (75) and the locking tabs.



    Illustration 4g00798416

  1. Put clean engine oil on the valve lifters. Install valve lifters (74) and the spacers in the original location.



    Illustration 5g00798414

  1. Put clean engine oil on O-ring (70). Install O-ring (70) on bypass valve assembly (69) .

  1. Install spring (71) and bypass valve (72) in valve body (73) .

  1. Install bypass valve assembly (69) in valve body (73) .



    Illustration 6g00798407

  1. Put clean engine oil on the O-ring. Install bypass valve (67) and the O-ring seal. Press in adapter (68), if necessary.



    Illustration 7g00798404

  1. Install the plate assembly and the gasket on fuel injection pump housing (10). Install six bolts (65) and two bolts (66).



    Illustration 8g00798400

  1. Put clean engine oil on rack regulators (64). Install rack regulators (64) in the original position.



    Illustration 9g00798393

  1. Install Tool (D) in the pump housing with the square end of the tool downward. Hold the racks against Tool (D) and install each of the fuel injection pumps (63) in the original location.



    Illustration 10g00798389

  1. Use Tool (A) in order to install bushing (62) and the seal. The fuel injection pump must be in the proper position. Bushing (62) should go into the pump housing until the bushing is even with the pump housing. Tighten the bushing to a torque of 245 ± 15 N·m (181 ± 11 lb ft). Install the washers.

  1. Check the movement of rack with Tool (E) after each pump is installed.

  1. Repeat step 13 through step 15 for the remainder of the pumps and bushings.



    Illustration 11g00798387

  1. Install the rack link (60), the bolt, and plug (61) .

  1. Install both Tools (D) and hold the racks against the pins.

  1. Rotate plug (61) in order to equalize the rack setting. Tighten the bolt.

  1. Install the pin, support assembly (58), and two bolts (59) .



    Illustration 12g00798378

  1. Install pump drive gear (57) and two bolts (56) .



    Illustration 13g00798371

  1. Install the O-ring seal on sleeve (55). Install valve (53) on servo piston assembly. Install sleeve (55) and piston (54) on servo piston assembly.



    Illustration 14g00798369

  1. Install retaining ring (48) and spring seat (49). Install rack control sleeve (51) and ring (52) on servo piston assembly (47) .



    Illustration 15g00798368

  1. Install two bolts (46) and servo piston (47) .



    Illustration 16g00798364

  1. Install tube (43). Install bar (45) for the rack control. Install the bolt and washer (44) .



    Illustration 17g00798362

  1. Install bolts (40) and drive housing (41) .

  1. Install sensor (42) .

  1. Adjust the gap between sensor (42) and gear (54) to 0.76 ± 0.15 mm (0.030 ± 0.006 inch). Tighten the nut on the sensor to a torque of 14 ± 1 N·m (10 ± 1 lb ft).



    Illustration 18g00798360

  1. Install shaft (39) in star gears (36) and (37) .

  1. Install key (38), if necessary.



    Illustration 19g00798354

  1. Install three O-rings (34) and shaft assembly (35) .



    Illustration 20g00798353

  1. Install spring (30) and valve (31) .

  1. Install bolt (32) and body assembly (33) .



    Illustration 21g00798327

  1. Install two bolts (28), cover (29), and the gasket.



    Illustration 22g00798325

  1. Install four bolts (26), rotary servo (27), and the gasket from fuel injection pump housing (10) .



    Illustration 23g00798320

  1. Install spring (25), if necessary.



    Illustration 24g00798298

  1. Lubricate the lip seal with clean engine oil. Install retaining ring (23) and the lip seal, if necessary.



    Illustration 25g00798279

  1. Install retaining ring (21) and shaft (22) .



    Illustration 26g00798270

  1. Install spring (20) on control group (19) .



    Illustration 27g00798265

  1. Install the seal, if necessary. Install control group (19) on housing assembly (9) .

  1. Tighten jam nut (18) to a torque of 55 ± 7 N·m (41 ± 5 lb ft).

    Note: Adjust the output of the sensor with the rack at zero position. The static timing during the compression stroke is 19.5 degrees before top center with the timing pin in position in the pump housing. The number one cylinder is at top dead center.




    Illustration 28g00798261

  1. Install spring (17) on lever (16), if necessary.



    Illustration 29g00798260

  1. Install lever (16) in housing (9) .



    Illustration 30g00798256

  1. Install receptacle (3) on clip (14) .

  1. Install two bolts, two washers (15), and clip (14) .



    Illustration 31g00798253

  1. Use Tool (G) in order to install the seal and shutoff solenoid (13). Lubricate the seal lightly with glycerin. Tighten the solenoid to a torque of 70 ± 10 N·m (52 ± 7 lb ft).



    Illustration 32g00798251

  1. Install solenoid (11) and the seal in housing assembly (9). Lubricate the seal lightly with glycerin.

    Note: Make sure that the lever on the solenoid engages correctly on the rack servo. The engine may run too fast or the engine may not start if the lever is not engaged in the sleeve.

  1. Install two bolts, one clip and two clamps (12) .



    Illustration 33g00797611

  1. Install five bolts and washers (8). Install housing (9) and a new gasket on fuel injection pump housing (10) .



    Illustration 34g00797576

  1. Install three bolts and washers (6). Install bracket (5), electronic control (7), and the gasket.



    Illustration 35g00797609

  1. Connect receptacle (3).

  1. Connect wires (4) .



    Illustration 36g00797567

  1. Install cover (2) and a new gasket.

    Install five bolts and washers (1) .

End By:

  1. Install the fuel injection pump housing and the governor. Refer to Disassembly and Assembly, "Fuel Injection Pump Housing and Governor - Install"
  2. Install the fuel transfer pump. Refer to Disassembly and Assembly, "Fuel Transfer Pump - Install"

Caterpillar Information System:

SPS342 Skid Mounted Pumper Fire Prevention and Explosion Prevention
SPS342 Skid Mounted Pumper General Hazard Information
3500B and 3500 Marine Propulsion Engines with EUI Option Plate Locations and Film Locations
Electronic Modular Control Panel II+ (EMCP II+) Engine Does Not Shutdown (for PEEC Engines)
G3406 and G3412 Generator Sets Engine Speed/Timing Sensor - Clean/Inspect
3500 Spark Ignited Engines Carburetor Control Linkage - EG3P Governor
2001/12/01 New Crankshaft Assemblies Include Counterweights That Are Permanently Bolted To The Crankshafts {1202, 1231}
Electronic Modular Control Panel II+ (EMCP II+) GSC CID 0168 - FMI 04
Electronic Modular Control Panel II+ (EMCP II+) Component Location - 3412 PEEC and 3456 Engines
Electronic Modular Control Panel II+ (EMCP II+) Display of Voltage or Current or Power Is Inaccurate
3500B and 3500B High Displacement Generator Set Engines Ether Injection System
Electronic Modular Control Panel II+ (EMCP II+) Display of Voltage or Current Is Zero
Electronic Modular Control Panel II (EMCP II) GSC CID 0447 - FMI 12 (for EUI Engines)
Electronic Modular Control Panel II (EMCP II) GSC CID 0447 - FMI 12 (for MUI Engines)
3500B Marine Propulsion Engines Product Description
320B, 320B L and 320B N Excavators Engine Starting with Jump Start Cables - If Equipped
G3500 Engines Cylinder Head Valves
Electronic Modular Control Panel II+ (EMCP II+) GSC CID 0566 - FMI 07 (for PEEC Engines)
Electronic Modular Control Panel II+ (EMCP II+) GSC CID 0590 - FMI 09
G3600 Engines Monitoring System
3412C Engine Fuel Injection Pump - Install
3412C Engine Engine Oil Cooler - Remove
Electronic Modular Control Panel II (EMCP II) GSC CID 0566 - FMI 07 (for MUI Engines)
3412C Engine Engine Oil Cooler - Install