345C Excavator (Ultra High Demolition) Hydraulic System Caterpillar


Boom Hydraulic System

Usage:

345C L SCN

Boom Raise (High Speed)




Illustration 1g01620686

Hydraulic schematic for BOOM RAISE (high speed)

(1) Boom cylinders

(2) Boom lowering control valve

(3) Valve

(4) Line (oil flow from boom cylinder rod end)

(5) Passage

(6) Line (oil flow to boom lowering control valve)

(7) Manual ball valve

(8) orifice

(9) Valve

(10) Port

(11) Main control valve

(12) Pilot line

(13) Port

(14) Line

(15) Pilot control valve (boom)

(16) Port

(17) Check valve

(18) Boom II control valve

(19) Spring

(20) Boom I control valve

(21) Spring

(22) Load check valve

(23) Return passage

(24) Spring

(25) Pilot line

(26) Parallel feeder passage

(27) Return passage

(28) Parallel feeder passage

(29) Pilot line

(30) Pressure reducing valve for boom priority

(31) Drive pump

(32) Idler pump

(33) Pilot pump

(34) Return line

A BOOM RAISE operation at high speed is accomplished when the oil delivery from both drive pump (31) and idler pump (32) is supplied to the head end of boom cylinders (1). Boom I control valve (20) and boom II control valve (18) operate during the high speed operation. A BOOM RAISE operation at low speed is accomplished when the oil delivery from only drive pump (31) is supplied to the head end of boom cylinders (1). During the low speed operation, boom I control valve (20) operates alone.




Illustration 2g01620963

Main control valve compartment

(20) Boom I control valve

(18) Boom II control valve

The oil delivery from drive pump (31) flows through parallel feeder passage (28) in main control valve (11) to boom I control valve (20). The oil delivery from idler pump (32) flows through parallel feeder passage (26) in main control valve (11) to boom II control valve (18) .

When the joystick for the boom is moved to the full BOOM RAISE position, the pilot oil flows from pilot control valve (15) through pilot line (25). The pilot oil flow then divides into two flow paths. Part of the pilot oil flows to port (10) of main control valve (11). The remainder of the pilot oil flows through pilot line (12) to port (13) of the main control valve.

A portion of the oil in pilot line (12) also flows through pilot line (29) to pressure reducing valve (30) for boom priority. During a combined operation of BOOM RAISE and STICK IN, the pilot oil flow to pressure reducing valve (30) for boom priority causes the boom circuit to receive oil flow priority. This allows the boom to raise at a high speed.




Illustration 3g01442397

Boom I control valve (BOOM RAISE position)

(13) Port

(22) Load check valve

(24) Spring

(27) Return passage

(28) Parallel feeder passage

(35) Port

(36) Passage

(37) Port

(38) Spool

(39) Passage

The pilot oil flow from port (13) shifts spool (38) of boom I control valve (20) against the force of spring (24). The oil delivery from the drive pump in parallel feeder passage (28) flows through load check valve (22), passage (36), port (37), and line (14) to boom lowering control valves (2). The oil delivery from the drive pump flows through valves (3) to the head end of boom cylinders (1) .

Note: For more information on the boom lowering control valve, refer to Systems Operation, "Boom Lowering Control Valve".




Illustration 4g01620999

Boom II control valve (BOOM RAISE position)

(10) Port

(16) Port

(19) Spring

(26) Parallel feeder passage

(40) Passage

(41) Spool

(42) Passage

The pilot oil flow in port (10) of boom II control valve (18) shifts spool (41) against the force of spring (19). The oil delivery from the idler pump in parallel feeder passage (26) now flows through passage (40), passage (42), and flows out of port (16) to line (14). The oil delivery from the drive pump combines with the oil delivery from the idler pump at the block valve on main control valve (11). The combined pump oil flows through line (14) and boom lowering control valves (2) to the head end of boom cylinders (1) .

Note: The swing priority valve does not affect the boom II control valve.

Return oil from the rod end of boom cylinders (1) flows through line (4) and port (35) to boom I control valve (20). The oil then flows through the passage in boom I control valve (20), return passage (39), return passage (27) and return line (34) to the hydraulic tank.

Boom Raise (Low Speed)

When the joystick for the boom is moved less than half of the travel distance for BOOM RAISE, low pilot oil pressure is supplied to boom I control valve (20) and boom II control valve (18) .

When the boom is raised at a low speed, boom I control valve (20) opens and boom II control valve (18) remains closed. The force of spring (24) in boom I control valve (20) is less than the force of spring (19) in boom II control valve (18). Because of the low pilot oil pressure, boom I control valve (20) will open and boom II control valve (18) will remain closed.

The oil delivery from drive pump (31) now flows to the head end of boom cylinders (1). Without the oil delivery from idler pump (29), the cylinder rod movement slows down when the boom is raised. The low speed operation of the boom is performed.

Boom Priority




Illustration 5g01620868

Hydraulic schematic for BOOM RAISE and STICK OUT

(1) Boom cylinders

(15) Pilot control valve (boom)

(30) Pressure reducing valve for boom priority

(43) Stick cylinders

(44) Pilot control valve (stick and swing)

(45) Stick II control valve

(46) Pilot line

During combined operations of BOOM RAISE and STICK OUT, the pilot oil pressure from pilot control valve (15) for the boom activates pressure reducing valve (30) for boom priority. Pressure reducing valve (30) for boom priority causes oil flow priority to the head end of boom cylinders (1) during this combined hydraulic operation.

When the joystick for the stick is moved to the STICK OUT position, a portion of the pilot oil from pilot control valve (44) for the stick flows through pressure reducing valve (30) to stick II control valve (45). As the joystick for the boom is moved farther from the NEUTRAL position during a BOOM RAISE operation, pilot oil pressure from pilot control valve (15) for the boom increases. This gradual increase in pilot oil pressure causes the spool in pressure reducing valve (30) to gradually shift.

A portion of the pilot oil that flows to stick II control valve (45) from pilot control valve (44) for the stick is routed to the hydraulic tank. The pilot oil pressure in pilot line (46) that acts on stick II control valve (45) decreases. Stick II control valve (45) shifts toward the NEUTRAL position. The amount of oil flow from the main pumps to stick cylinders (43) decreases. This causes a greater portion of the oil flow from the main pumps to flow to the head end of the boom cylinders (1) .

Since the pilot oil pressure from pilot control valve (15) for the boom directly corresponds to the amount of movement or position of the joystick a gradual change to boom priority occurs. Thus, boom priority is controlled by the position of the joystick for the boom and boom priority automatically activates when the joystick reaches a certain position during a BOOM RAISE operation.

Boom Lower




Illustration 6g01620920

(1) Boom cylinders

(2) Boom lowering control valve

(3) Valve

(4) Line (oil flow to boom cylinder rod end)

(5) Passage

(6) Line (oil flow from boom lowering control valve)

(7) Manual ball valve

(8) orifice

(9) Valve

(11) Main control valve

(14) Return line

(15) Pilot control valve (boom)

(20) Boom I control valve

(22) Load check valve

(23) Return passage

(25) Pilot line

(27) Return passage

(28) Parallel feeder passage

(31) Drive pump

(34) Return line

(48) Pilot line

(49) Line

(50) Center bypass passage

(51) Passage

(52) Pilot line

(53) Port

(54) Check valve

Introduction

When the boom is lowered, oil from drive pump (31) is supplied to boom cylinders (1) through control valve (20) .

Control valve (20) contains a regeneration circuit for check valve (54). When the control lever is moved to the BOOM LOWER position, check valve (54) is forced open. Oil from the head end of cylinders (1) flows to the rod end of cylinders (1). During a boom lower operation, the regeneration circuit shares oil from drive pump (31) with the other implement functions.

Boom Lower




Illustration 7g01436709

Control valve BOOM LOWER (boom I)

(22) Load check valve

(23) Return passage

(28) Parallel feeder passage

(50) Center bypass passage

(53) Port

(54) Check valve

(55) Passage

(56) Passage

(57) Passage

(58) Spring

(59) Spring chamber

(60) Valve

(61) Spring

(62) Passage

(63) Stem

(64) Passage

(65) Passage

(66) Passage

(67) Spring

(68) Passage

(69) Passage

When the control lever is moved to the BOOM LOWER position, pilot oil from pilot control valve (15) flows into pilot line (25). Pilot oil in pilot line (25) flows into two paths. Pilot oil flows from line (48) to boom lowering control valves (2). The pilot oil shifts valves (3). Oil from the head end of boom cylinders (1) now flows through valves (3) to the main control valve.

Pilot oil also flows through line (52) to boom I control valve (20). The pilot oil causes boom I control valve (20) to shift upward.

When boom I control valve (21) is shifted, the negative flow control pressure in center bypass passage (50) becomes low. The negative flow control pressure is now low. Drive pump (31) upstrokes resulting in maximum flow.

The drive pump oil in parallel feeder passage (28) flows through passage (51) to line (49). The flow in line (49) enters the rod end of boom cylinders (1).

The return oil from boom cylinders (1) enters boom lowering control valves (2). Oil then flows through valves (3) to line (6). The oil combines into one flow. The oil then flows through valves (8) and (9). Part of the return oil flows through line (34) to the hydraulic tank. The rest of the return oil flows through line (14) to boom I control valve (20). Part of the oil flows through the valve to return passage (27) and to the hydraulic tank.

Because the return oil flow is restricted at boom I control valve (20), movement of the boom cylinder rod is slowed down. This causes the boom to lower at an appropriate speed due to the flow rate from the drive pump.

Regeneration Circuit

The remainder of the return oil in passage (66) flows through passage (62) in spool (63) to check valve (54). When spool (63) moves to the right, passage (68) is open to return passage (23). Oil flows from spring chamber (59) to return passage (23). Because the oil pressure in spring chamber (59) decreases, the oil pressure in passage (62) overcomes the forces of springs (58) and (61). Valve (60) and check valve (54) move to the left. When both valves are opened the oil in passage (56) is allowed to flow through passage (69) and out of passage (55). The oil then flows to the rod end of the boom cylinders.

When the boom control lever is moved to the NEUTRAL position, there is no oil supply to port (53). Spool (63) is shifted to the neutral position by spring (67). When passage (65) closes, the oil flow from passage (66) to passage (62) is blocked. Check valve (54) is now closed by the force of spring (61) and valve (60) is moved to the right side by the force of spring (58) .

Fore Boom Hydraulic System




Illustration 8g01624497

Fore boom RAISE

(1) Main control valve

(2) Boom II control valve

(3) Boom I control valve

(4) Fore boom cylinder

(5) Pilot operated check valve

(6) Pilot operated check valve

(7) Center bypass passage

(8) Center bypass passage

(9) Control valve

(10) Pilot line

(11) Pilot line

(12) Return line

(13) Pilot control valve (boom and bucket)

(14) Pilot line

(15) Foot pedal

(16) Solenoid valve

(17) Pilot manifold

(18) Solenoid valve for hydraulic lock

(19) Drive pump

(20) Line

(21) Idler pump

(22) Hydraulic tank

(23) Line

(24) Pilot pump

(25) Solenoid valve

(26) Valve

(27) Valve

A fore boom RAISE operation is accomplished when pump oil is delivered from idler pump (21) to the fore boom cylinder. Foot pedal (15) is used to control oil flow to control valve (9) in order to carry out a fore boom operation.

Pilot pump (24) supplies oil to pilot manifold (17). When the hydraulic activation lever is moved to the UNLOCK position, pilot oil flows from pilot manifold (17) to foot pedal (15) and pilot control valve (13) .

When foot pedal (15) is activated, pilot oil flows through line (10) to control valve (9). The pilot oil shifts valve (9) to the LEFT. Oil delivery from idler pump (21) flows through line (20), control valve (9), and the head end of cylinder (4). Return oil from the rod end of cylinder (4) flows through pilot operated check valve (6), line (12), and returns back to hydraulic tank (22) .

When foot pedal (15) is activated part of the pilot oil flows through line (14) to boom II control valve (2). Boom II control valve (2) shifts UPWARD and closes center bypass passage (7). When the center bypass passage is blocked there is no negative flow control pressure. The output of the idler pump is held maximum.

For more information on negative flow control, refer to System Operation, "Negative Flow Control System".

A fore boom LOWER operation is similar to a fore boom RAISE operation. When foot pedal (15) is activated pilot oil flows through line (11) to control valve (9). Control valve (9) shifts to the RIGHT. This allows oil delivery from idler pump (21) to flow through line (20), control valve (9), and the rod end of cylinder (4). Return oil from the head end of cylinder (4) flows through pilot operated check valve (5), line (12), and returns to hydraulic tank (22) .

Manual Boom Lower




Illustration 9g01213309

(1) Port

(15) Port

(21) Seat

(22) Locknut

(23) Valve

(24) Ball

As seat (21) is turned counterclockwise, ball (24) will shift. As ball (24) is shifted, oil is allowed to flow through port (1) and valve (23) to port (15). Oil from the head end of the boom cylinder flows through port (15) to the hydraulic tank. This allows the boom to lower.

Caterpillar Information System:

374D Excavator Specifications
Installation Procedure for 260-7982 Pilot Lines Gp (Medium Pressure){5057, 5479, 6307} Installation Procedure for 260-7982 Pilot Lines Gp (Medium Pressure){5057, 5479, 6307}
385C MHPU Mobile Hydraulic Power Unit Capacities (Refill)
2008/08/25 Improvements have been Made to the Pilot Lines Group for the Boom Swing Function {1408, 5057}
308D CR Mini Hydraulic Excavator Hydraulic System Cylinder Speed - Check - Blade (If Equipped)
308D CR Mini Hydraulic Excavator Hydraulic System Cylinder Speed - Check
319D Excavator Boom/Stick/Bucket Combinations
308D CR Mini Hydraulic Excavator Hydraulic System Cylinder Drift - Check - Blade (If Equipped)
308D CR Mini Hydraulic Excavator Hydraulic System Swing Speed and Swing Drift on a Slope - Check
308D CR Mini Hydraulic Excavator Hydraulic System Swing Speed and Overswing on Level Ground - Check
2008/08/11 Improved Window Wiper Motors Now Used {7305}
308D CR Mini Hydraulic Excavator Hydraulic System Travel on Level Ground - Test
325D and 329D Excavators Machine System Specifications Boom Lines
319D Excavator Machine System Specifications Liquid Level Sensor (Water Separator)
2008/08/11 An Improved Spacer Ring For Dual Tires Is Now Available On Certain Wheeled Excavators {4202, 4203, 4209}
2008/08/11 Improved Hose Routing for the Swing Motor and Additional Hose Cable Strap Fasteners are Now Used on Certain Wheeled Excavators {5057, 5459}
The Ring in the Undercarriage Frame Assembly May Crack on Certain Excavators{4150, 4151} The Ring in the Undercarriage Frame Assembly May Crack on Certain Excavators{4150, 4151}
Full Rotation Pin Grabber Thumb Links may Crack Around the Welded Tube Joint or the Retaining Bolt for the Link Pin may Break{6513, 6547} Full Rotation Pin Grabber Thumb Links may Crack Around the Welded Tube Joint or the Retaining Bolt for the Link Pin may Break{6513, 6547}
374D Excavator Boom/Stick/Bucket Combinations
345C Excavator (Ultra High Demolition) Hydraulic System Stick Hydraulic System
GLC85 Forestry Grapple Rotator - Inspect
325D and 329D Excavators and 325D Material Handler Machine System Specifications Boom - 10.20 m (33.5 ft)
319D Excavator Machine System Specifications Bucket Linkage - Coupler
2010/07/14 Correction to Testing and Adjusting , "Main Pump (Flow) - Test - Constant Horsepower Flow Control" for 315D and 319D Excavators {5070}
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.