Swing Speed and Swing Drift on a Slope - Check
Measuring the swing speed on a slope will determine if there is a need to check the swing motor and the anti-reaction valve. Measuring the swing drift on a slope will determine if there is a need to check the swing parking brake.
Note: The engine speed and/or the machine configuration that is used during this test can affect the results of this test. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for the engine speed that was used for this test. Refer to Testing and Adjusting, "Operational Checks" for the machine configurations that were used for this test.
Note: The relief valve pressure settings must be set to the relief valve pressure specification before performing this operational check. Refer to Testing and Adjusting, "Specifications".
Show/hide table
Required Tools     | |
---|---|
Description     | Qty     |
Measuring Tape     | 1     |
Stopwatch     | 1     |
Show/hide table
Illustration 1 | g00298078 |
Swing Speed (Empty Bucket)
- Empty the bucket.
- Position the machine on a slope of 12 degrees. Refer to Illustration 1.
- Position the implements at maximum reach and close the bucket. Position the bucket above the ground so that the bucket will not come in contact with any obstacles.
- Position the upper structure at position (A). The upper structure should be at a 90 degree angle to the lower structure. Refer to Illustration 2.
Show/hide table
Illustration 2 | g00298079 |
- Measure the time that is required to swing the upper structure from position (A) to position (B) .
- Position the upper structure at position (C). The upper structure should be at a 90 degree angle to the lower structure.
- Measure the time that is required to swing the upper structure from position (C) to position (B).
Show/hide table
Table 2 Swing Time (seconds)     Item     New     Rebuild     Service Limit     Right Swing     4.6 or less     5.3 or less     6.0 or less     Left Swing    
Swing Drift (Loaded Bucket)
- Load the bucket.
Weight of bucket load
- 308D ... 375 kg (827 lb)
- Position the machine on a slope of 12 degrees. Refer to Illustration 1.
- Position the implements at maximum reach and close the bucket. Position the bucket above the ground so that the bucket will not come in contact with any obstacles.
- Position the upper structure at position (A). The upper structure should be at a 90 degree angle to the lower structure. Refer to Illustration 3.
Show/hide table
Illustration 3 | g00298079 |
- To indicate the relationship of the two positions, put a mark (C) on the inner race and the outer race of the swing bearing. Refer to Illustration 4.
Show/hide table
Illustration 4 | g00293972 |
(A) Upper frame (B) Undercarriage frame (C) Marking |
- Stop the engine.
- Leave the machine in this position for three minutes. Measure the swing drift on the circumference of the swing bearing.
- Start the engine.
- Position the upper structure at position (C). The upper structure should be at a 90 degree angle to the lower structure. Refer to Illustration 3.
- Repeat Steps 5 through 7.
Show/hide table
Table 3 Swing Drift mm (inch)     Item     New     Rebuild     Service Limit     Right Swing     0     0     0     Left Swing    
Caterpillar Information System:
308D CR Mini Hydraulic Excavator Hydraulic System Swing Speed and Overswing on Level Ground - Check
2008/08/11 Improved Window Wiper Motors Now Used {7305}
308D CR Mini Hydraulic Excavator Hydraulic System Travel on Level Ground - Test
323D MHPU Mobile Hydraulic Power Unit Lubricant Viscosities
319D Excavator Sound Information and Vibration Information
385C MHPU Mobile Hydraulic Power Unit Securing the Machine
C4.2 and C6.4 Engines for Caterpillar Built Machines Fuel Injection Pump
325D and 329D Excavators and 325D Material Handler Machine System Specifications Boom Lines
C13, C15, and C18 Tier 4 Final Engines Air Lines
325D and 329D Excavators and 325D Material Handler Machine System Specifications Front Lines - Medium Flow
Installation Procedure for 200-3365 Auxiliary Pump and Mounting Gp On Certain Hydraulic Excavators{5073, 6307} Installation Procedure for 200-3365 Auxiliary Pump and Mounting Gp On Certain Hydraulic Excavators{5073, 6307}
345C Excavator (Ultra High Demolition) Hydraulic System Negative Flow Control System
308D CR Mini Hydraulic Excavator Hydraulic System Cylinder Drift - Check - Blade (If Equipped)
319D Excavator Boom/Stick/Bucket Combinations
308D CR Mini Hydraulic Excavator Hydraulic System Cylinder Speed - Check
308D CR Mini Hydraulic Excavator Hydraulic System Cylinder Speed - Check - Blade (If Equipped)
2008/08/25 Improvements have been Made to the Pilot Lines Group for the Boom Swing Function {1408, 5057}
385C MHPU Mobile Hydraulic Power Unit Capacities (Refill)
Installation Procedure for 260-7982 Pilot Lines Gp (Medium Pressure){5057, 5479, 6307} Installation Procedure for 260-7982 Pilot Lines Gp (Medium Pressure){5057, 5479, 6307}
374D Excavator Specifications
345C Excavator (Ultra High Demolition) Hydraulic System Boom Hydraulic System
325D and 329D Excavators Machine System Specifications Boom Lines
319D Excavator Machine System Specifications Liquid Level Sensor (Water Separator)
2008/08/11 An Improved Spacer Ring For Dual Tires Is Now Available On Certain Wheeled Excavators {4202, 4203, 4209}