365C Front Shovel Hydraulic System Caterpillar


Relief Valve (Line) - Test and Adjust

Usage:

365C PAR

Preparation

  1. Position the machine on level ground.

  1. Stop the engine.

  1. Release the pressure in the hydraulic system. Refer to Testing and Adjusting, "Hydraulic System Pressure - Release".



    Illustration 1g00597516

    Pump compartment

    (1) Pressure tap (front pump delivery pressure)

    (2) Pressure tap (rear pump delivery pressure)

  1. Connect a 60000 kPa (8700 psi) pressure gauge to pressure tap (1) and pressure tap (2) .

    Note: Before testing and adjusting procedures can be performed for any of the line relief valves, the signal relief valves must be set to the correct pressure specification. Refer to Testing and Adjusting, "Relief Valve (Signal) - Test and Adjust" for information concerning the procedure to test and/or adjust the signal relief valves.




    Illustration 2g00866894

    Main control valve (line relief valves)

    (3) Signal relief valve (high pressure circuit)

    (4) Signal relief valve (low pressure circuit)

    (5) Line relief valve (bottom dump cylinder rod end)

    (6) Line relief valve (bottom dump cylinder head end)

    (7) Line relief valve (bucket cylinder head end)

    (8) Line relief valve (bucket cylinder rod end)

    (9) Line relief valve (boom cylinder head end)

    (10) Line relief valve (boom cylinder rod end)

    (11) Line relief valve (stick cylinder head end)

    (12) Line relief valve (stick cylinder rod end)

    Note: A temporary setting of signal relief valve (4) for the low pressure circuit is required before any line relief valve can be tested. Refer to Testing and Adjusting, "Relief Valve (Signal) - Test and Adjust".

    Note: Signal relief valve (4) controls the delivery pressure for the boom circuit, the stick circuit, the bucket circuit, and the bottom dump circuit when digging mode is selected as the work mode control. The heavy lift solenoid is de-energized.

    Note: Signal relief valve (3) controls the delivery pressure for the travel circuit and the heavy lift circuit. The solenoid valve for the travel circuit is energized only during travel operations and heavy lift operations.

  1. Start the engine.



    Illustration 3g01128160

    Monitor and keypad

    (50) Engine speed

    (51) Gain/Response

    (52) AEC switch

    (53) Gain/Response switch

    (54) Heavy lift switch

  1. Place the machine controls at the following settings:

    • Engine speed dial "2"

    • AEC switch OFF

    • Heavy lift switch OFF (digging mode)

    • Gain/Response "CAT" (normal mode)

    Refer to Testing and Adjusting, "Engine Performance - Test" for engine rpm settings.

  1. Place the hydraulic activation control lever in the UNLOCKED position.

  1. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

Testing and Adjusting Procedure (Boom Cylinders)

  1. Move the joystick for the boom to the full BOOM RAISE position. Hold the joystick for the boom in this position and check the pressure gauge reading at pressure tap (1) or (2) .

  1. Return the joystick for the boom to the NEUTRAL position.

  1. The pressure gauge reading should be 37000 ± 500 kPa (5350 ± 75 psi). If the pressure gauge reading at pressure tap (1) or (2) is not within the specification, adjust line relief valve (9) .



    Illustration 4g00866988

    Line relief valve

    (13) Locknut

    (14) Adjustment screw

  1. In order to adjust line relief valve (9), loosen locknut (13) and turn adjustment screw (14) until the pressure gauge reading at pressure tap (1) or (2) is 37000 ± 500 kPa (5350 ± 75 psi).

    Note: Turn adjustment screw (14) clockwise in order to increase the pressure. Turn adjustment screw (14) counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustment on pressure rise.

  1. Tighten locknut (13) to a torque of 33 ± 5 N·m (25 ± 4 lb ft).

  1. Move the joystick for the boom to the full BOOM LOWER position. Hold the joystick for the boom in this position and check the pressure gauge reading at pressure tap (1) or (2) .

  1. Return the joystick for the boom to the NEUTRAL position.

  1. The pressure gauge reading should be 34000 ± 500 kPa (4900 ± 75 psi). If the pressure gauge reading at pressure tap (1) or (2) is not within the specification, adjust line relief valve (10) .

  1. In order to adjust line relief valve (10), loosen locknut (13) and turn adjustment screw (14) until the pressure gauge reading at pressure tap (1) or (2) is 34000 ± 500 kPa (4900 ± 75 psi).

    Note: Turn adjustment screw (14) clockwise in order to increase the pressure. Turn adjustment screw (14) counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustment on pressure rise.

  1. Tighten locknut (13) to a torque of 33 ± 5 N·m (25 ± 4 lb ft).

Note: If an appropriate location is not available to fully retract the boom cylinders, exchange the functions of the boom line relief valves. Remove the line relief valve for the boom cylinder head end and the line relief valve for the boom cylinder rod end from the main control valve. Exchange the location in the main relief valve of the line relief valves. Adjust the pressure of the boom line relief valve that is now attached in the head end. After completion of line relief valve adjustment, return the respective line relief valves to the original locations.

Testing and Adjusting Procedure (Stick Cylinder)

  1. Move the joystick for the stick to the full STICK IN position. Hold the joystick for the stick in this position and check the pressure gauge reading at pressure tap (1) or (2) .

  1. Return the joystick for the stick to the NEUTRAL position.

  1. The pressure gauge reading should be 34000 ± 500 kPa (4900 ± 75 psi). If the pressure gauge reading at pressure tap (1) or (2) is not within the specification, adjust line relief valve (11) .



    Illustration 5g00866988

    Line relief valve

    (13) Locknut

    (14) Adjustment screw

  1. In order to adjust line relief valve (11), loosen locknut (13) and turn adjustment screw (14) until the pressure gauge reading at pressure tap (1) or (2) is 34000 ± 500 kPa (4900 ± 75 psi).

    Note: Turn adjustment screw (14) clockwise in order to increase the pressure. Turn adjustment screw (14) counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustment on pressure rise.

  1. Tighten locknut (13) to a torque of 33 ± 5 N·m (25 ± 4 lb ft).

  1. Move the joystick for the stick to the full STICK OUT position. Hold the joystick for the stick in this position and check the pressure gauge reading at pressure tap (1) or (2) .

  1. Return the joystick for the stick to the NEUTRAL position.

  1. The pressure gauge reading should be 37000 ± 500 kPa (5350 ± 75 psi). If the pressure gauge reading at pressure tap (1) or (2) is not within the specification, adjust line relief valve (12) .

  1. In order to adjust line relief valve (12), loosen locknut (13) and turn adjustment screw (14) until the pressure gauge reading at pressure tap (1) or (2) is 37000 ± 500 kPa (5350 ± 75 psi).

    Note: Turn adjustment screw (14) clockwise in order to increase the pressure. Turn adjustment screw (14) counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustment on pressure rise.

  1. Tighten locknut (13) to a torque of 33 ± 5 N·m (25 ± 4 lb ft).

Testing and Adjusting Procedure (Bucket Cylinder)

  1. Move the joystick for the bucket to the full BUCKET CLOSE position. Hold the joystick for the bucket in this position and check the pressure gauge reading at pressure tap (1) or (2) .

  1. Return the joystick for the bucket to the NEUTRAL position.

  1. The pressure gauge reading should be 34000 ± 500 kPa (4900 ± 75 psi). If the pressure gauge reading at pressure tap (1) or (2) is not within the specification, adjust line relief valve (7) .



    Illustration 6g00866988

    Line relief valve

    (13) Locknut

    (14) Adjustment screw

  1. In order to adjust line relief valve (7), loosen locknut (13) and turn adjustment screw (14) until the pressure gauge reading at pressure tap (1) or (2) is 34000 ± 500 kPa (4900 ± 75 psi).

    Note: Turn adjustment screw (14) clockwise in order to increase the pressure. Turn adjustment screw (14) counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustment on pressure rise.

  1. Tighten locknut (13) to a torque of 33 ± 5 N·m (25 ± 4 lb ft).

  1. Move the joystick for the bucket to the full BUCKET OPEN position. Hold the joystick for the bucket in this position and check the pressure gauge reading at pressure tap (1) or (2) .

  1. Return the joystick for the boom to the NEUTRAL position.

  1. The pressure gauge reading should be 34000 ± 500 kPa (4900 ± 75 psi). If the pressure gauge reading at pressure tap (1) or (2) is not within the specification, adjust line relief valve (8) .

  1. In order to adjust line relief valve (8), loosen locknut (13) and turn adjustment screw (14) until the pressure gauge reading at pressure tap (1) or (2) is 34000 ± 500 kPa (4900 ± 75 psi).

    Note: Turn adjustment screw (14) clockwise in order to increase the pressure. Turn adjustment screw (14) counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustment on pressure rise.

  1. Tighten locknut (13) to a torque of 33 ± 5 N·m (25 ± 4 lb ft).

Testing and Adjusting Procedure (Bottom Dump Cylinder)

  1. Move the control for the bottom dump cylinder to the full CLOSE position. Hold the control for the bottom dump cylinder in this position and check the pressure gauge reading at pressure tap (1) or (2) .

  1. Return the control for the bottom dump cylinder to the NEUTRAL position.

  1. The pressure gauge reading should be 34000 ± 500 kPa (4900 ± 75 psi). If the pressure gauge reading at pressure tap (1) or (2) is not within the specification, adjust line relief valve (6) .



    Illustration 7g00866988

    Line relief valve

    (13) Locknut

    (14) Adjustment screw

  1. In order to adjust line relief valve (6), loosen locknut (13) and turn adjustment screw (14) until the pressure gauge reading at pressure tap (1) or (2) is 34000 ± 500 kPa (4900 ± 75 psi).

    Note: Turn adjustment screw (14) clockwise in order to increase the pressure. Turn adjustment screw (14) counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustment on pressure rise.

  1. Tighten locknut (13) to a torque of 33 ± 5 N·m (25 ± 4 lb ft).

  1. Move the control for the bottom dump cylinder to the full OPEN position. Hold the control for the bottom dump cylinder in this position and check the pressure gauge reading at pressure tap (1) or (2) .

  1. Return the control for the bottom dump cylinder to the NEUTRAL position.

  1. The pressure gauge reading should be 34000 ± 500 kPa (4900 ± 75 psi). If the pressure gauge reading at pressure tap (1) or (2) is not within the specification, adjust line relief valve (5) .

  1. In order to adjust line relief valve (5), loosen locknut (13) and turn adjustment screw (14) until the pressure gauge reading at pressure tap (1) or (2) is 34000 ± 500 kPa (4900 ± 75 psi).

    Note: Turn adjustment screw (14) clockwise in order to increase the pressure. Turn adjustment screw (14) counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustment on pressure rise.

  1. Tighten locknut (13) to a torque of 33 ± 5 N·m (25 ± 4 lb ft).

  1. Return the pressure setting of signal relief valve (4) to the specified pressure setting. Refer to Testing and Adjusting, "Relief Valve (Signal) - Test and Adjust".

Caterpillar Information System:

330C With Drilling Front Machine System Specifications Cooling Lines
345C Excavator Tool Control System System 14: Relief Valve (Main) - Test and Adjust - Auxiliary Control Valve (Medium Pressure)
345C Excavator Tool Control System System 14: Relief Valve (Line) - Test and Adjust - Attachment Control Valve
345C Excavator Tool Control System System 14: Solenoid Valve (Proportional Reducing) - Calibrate - Attachment Control Valve
302.5C Mini Hydraulic Excavator Machine System Specifications Stick Cylinder
330C Excavator Hydraulic System Relief Valve (Swing) - Test and Adjust
330C Excavator Hydraulic System Swing Motor - Test - Measurement of Case Drain Oil
330C Excavator Hydraulic System Relief Valve (Main) - Test and Adjust
330C Excavator Hydraulic System Accumulator (Pilot) - Test and Charge
330C Excavator Hydraulic System Relief Valve (Pilot) - Test and Adjust
330C Excavator Hydraulic System Swing Speed and Swing Drift on a Slope - Check
330C Excavator Hydraulic System Swing Speed and Overswing on Level Ground - Check
365C Front Shovel Hydraulic System Specifications
325D and 329D Excavators Fuses - Replace
330C Excavator Hydraulic System Swing Bearing Movement - Measure
330C Excavator Hydraulic System Travel Motor - Test - Measurement of Case Drain Oil
330C Excavator Hydraulic System Relief Valve (Crossover) - Test and Adjust
302.5C Mini Hydraulic Excavator Machine System Specifications Bucket Cylinder
330C Excavator Hydraulic System Fan Motor (Hydraulic Oil Cooler) - Test - Measurement of Case Drain Oil
330C Excavator Hydraulic System Fan Motor (Hydraulic Oil Cooler) - Test - Measurement of Case Drain Oil
330C Excavator Hydraulic System Fan Motor Speed (Hydraulic Oil Cooler) - Test and Adjust
C11 and C15 Engines for Caterpillar Built Machines CID 0269 FMI 04 Sensor Supply too low
C7 Engine for AP-1000D, AP-1055D, BG-2455D, and BG-260D Asphalt Pavers CID 0269 FMI 03 Sensor Supply too high
330C Excavator Hydraulic System Main Pump (Flow) - Test - Constant Horsepower Flow Control
Back to top