Parts and Specification Information
Illustration 1 | g03342163 |
Note: Verify that all parts are shipped and undamaged for preparation of assembly. Missing or damaged parts can be ordered prior to assembly to avoid delays during assembly.
Item | Part Number | Part Description | Qty | Specification | Approximate Weight | |
281-4301 Drive Shaft Gp, 280-1625 Rear Suspension Gp, 325-5172 Final Drive and Brake Wheel Ar, and 473-1370 Power Train Ar or 387-8523 Power Train Ar | ||||||
1 | 303-2504 | Slip Joint | 1 | |
||
2 | 156-7993 | Bolts
(M22X1.5X105-MM) |
8 | Tighten bolts in a cross pattern to a torque of |
||
3 | 281-3338 | Link Gp | 4 | |
||
4 | 505-6560 | Pins | 4 | |
||
5 | 505-6561 | Plates | 4 | |||
6 | 514-0293 | Plates | 4 | |||
7 | 198-4780 | Hard Washers | 16 | |||
8 | 8T-7338 | Bolts | 8 | |||
8A | 8T-4193 | Bolt | 8 | |||
9 | 087-3533 | Caps | 4 | Apply Loctite 242 to the threads. | ||
10 | 473-1370 or
387-8523 |
Power Train | 1 | |
||
449-9612 or
359-6200 |
||||||
280-2052 |
Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | Loctite C5A Copper Anti-Seize | - | |
B | - | Suitable Cribbing
( |
1 |
C | 386-6031 | Lever Puller Hoist Gp | 4 |
D | 8T-3087 | Hand Tap (M10X1.5-THD) | 1 |
E | - | Loctite 242 | - |
- Remove ten bolts (11), ten hard washers (12), and one plate assembly (13). Retain all hardware.
Show/hide table
Illustration 3 g03146915 (14) 8T-4137 Bolts (M10X1.5X20-MM)
(15) 8T-4121 Hard Washers
(16) 340-7065 Plate
(17) 340-7054 Plate As - Remove 11 bolts (14), 11 hard washers (15), one plate (16), and one plate assembly (17). Retain all hardware.
Show/hide table
Illustration 4 g03146916 (18) 279-2540 Yoke As - Clean the mating surface of yoke assembly (18) free of wax, dirt, debris, paint, and grease.
Show/hide table
Illustration 5 g03146936 (1) 303-2504 Slip Joint Note: Do not separate the drive shaft. Drive shafts are assembled with the u-joints in phase for balancing purposes. If the drive shaft must be separated, use a paint pen to make aligning marks on both sides of the slip joint. When re-assembling the drive shaft, make sure the aligning marks match to ensure proper u-joint phasing and balance performance.
- Clean the mating surfaces of slip joint (1) free of wax, dirt, debris, paint, and grease. Repeat for the opposite side.
Show/hide table
Illustration 6 g03151261 (1) 303-2504 Slip Joint Show/hide tableIllustration 7 g03151801 (1) 303-2504 Slip Joint
(2) 156-7993 Bolts (M22X1.5X105-MM)Show/hide tableIllustration 8 g03151802 (1) 303-2504 Slip Joint
(B) Suitable Cribbing (203 mm (8 inch) Length X102 mm (4 inch) Width X102 mm (4 inch) Height)Note: Install slip joint prior to installation of the rear axle for optimal access.
- Attach a suitable lifting device to slip joint (1). The weight of slip joint (1) is approximately
240 kg (530 lb) . Position slip joint (1) into the tunnel of the drive shaft guards. Lower slip joint (1) onto the tunnel of the drive shaft guards. - Attach two suitable lifting devices to position slip joint (1).
- Install slip joint (1) to the torque converter with four bolts (2).
Note: Install four bolts (2) to secure slip joint (1). The four bolts (2) will be torqued at a later time.
- Lower slip joint (1) onto Tooling (B). Remove the suitable lifting devices.
Show/hide table
Illustration 9 g03163856 (1) 303-2504 Slip Joint - Cut the strap that secures slip joint (1) from extending.
Show/hide table
Illustration 10 g03163857 (3) 281-3338 Link Gp
(A) Loctite C5A Copper Anti-Seize - Clean the bearing bores of lower link groups (3) free of wax, dirt, debris, paint, and grease. Apply Tooling (A) to the bearing bores of lower link group (3). Repeat for the remaining lower link groups.
Show/hide table
Illustration 11 g03163858 (4) 505-6560 Pin - Clean the surface of pin (4) free of wax, dirt, debris, paint, and grease. Repeat for the remaining pins.
Show/hide table
Illustration 12 g03163876 (A) Loctite C5A Copper Anti-Seize
(D) 8T-3087 Hand Tap (M10X1.5) - Remove the protective covers from the pin bores. Clean the pin bores free of wax, dirt, debris, paint, and grease. Use Tooling (D) to clean the threads of the two threaded holes. Apply Tooling (A) to the pin bores. Repeat for the remaining lower link groups. Repeat for the remaining pin bores.
Show/hide table
Illustration 13 g03177970 (4) 505-6560 Pin Show/hide tableIllustration 14 g06050008 Typical Example 8 places - Attach a suitable lifting device to pin (4). The weight of pin (4) is approximately
50 kg (110 lb) . Install pin (4) so the grease fitting is facing towards the center of the machine. Install pin (4) in the outer bore of the chassis. Repeat for the remaining three pins.Note: Leaving the pins partially in place avoids lifting the pins into place separately.
Note: Ensure pins (4) are oriented with the grease ports upward.
Show/hide tableIllustration 15 g06360080 (3) 281-3338 Link Gp
(4) 505-6560 Pin
(5) 505-6561 Plate
(6) 514-0293 Plate
(7) 198-4780 Hard Washers
(8) 8T-7338 Bolts
(8A) 8T-4193 BoltShow/hide tableIllustration 16 g03177974 (3) 281-3338 Link Gp
(C) 386-6031 Lever Puller Hoist Gp - Attach a suitable lifting device to lower link group (3). The weight of lower link group is approximately
308 kg (680 lb) . Position lower link group (3) and install pin (4). Install one plate (5), one plate (6), four hard washers (7), and four bolts (8). Use Tooling (C) and a suitable lifting device to support lower link group (3). Repeat for the other side.Show/hide tableIllustration 17 g03177984 (3) 281-3338 Link Gp
(4) 505-6560 Pin
(5) 505-6561 Plate
(6) 514-0293 Plate
(7) 198-4780 Hard Washers
(8) 8T-7338 Bolts
(8A) 8T-4193 BoltShow/hide tableIllustration 18 g03178056 (3) 281-3338 Link Gp
(C) 386-6031 Lever Puller Hoist Gp - Attach a suitable lifting device to lower link group (3). The weight of lower link group is approximately
308 kg (680 lb) . Position lower link group (3) and install pin (4). Install one plate (5), one plate (6), four hard washers (7), and four bolts (8). Use Tooling (C) and a suitable lifting device to support lower link group (3). Repeat for the other side.Show/hide tableIllustration 19 g03178058 (4) 278-3446 Pin
(9) 087-3533 Cap
(E) Loctite 242 - Apply Tooling (E) to the threads of cap (9). Install one cap (9) onto pin (4). Repeat for the three remaining pins.
Show/hide table
Illustration 20 g06360063 (19) 8T-7338 Bolt
(20) 198-4780 Hard Washer
(21) 514-0293 Plate
(22) 505-6560 Pin
(23) 8T-4193 Bolt
(24) 198-4780 Hard Washer
(25) 505-6561 Plate - Remove two bolts (19), two hard washers (20), one plate (21), two bolts (23), two hard washers (24), and one plate (25). Reposition pin (22) in the outer bore of the rear axle. Repeat for the remaining pins. Retain all the hardware.
Note: Ensure pins (22) are oriented with the grease ports upward.
Show/hide tableIllustration 21 g03333701 (26) 321-9814 Plate
(27) 8T-4223 Hard Washers
(28) 8T-4139 Bolts
(29) 7Y-5217 Bolts
(30) 8T-3282 Hard Washers
(31) 150-3981 Plate
(32) 150-3772 Pin - Remove three bolts (28), three hard washers (27), and plate (26). Remove six bolts (29), six hard washers (30), and plate (31). Reposition pin (32) in the inner bore of the rear axle. Repeat for the remaining pin. Retain all the hardware.
Show/hide table
Illustration 22 g03334069 (33) 221-3417 Pressure Sensor Gp - Disconnect pressure sensor group (33). Repeat for the other side.
Show/hide table
Illustration 23 g03334070 (34) 297-5609 Rear Suspension Gp Show/hide tableIllustration 24 g03334071 (34) 297-5609 Rear Suspension Gp - Attach a suitable lifting device to rear suspension group (34). The weight of rear suspension group (34) is approximately
480 kg (1060 lb) . Raise rear suspension group (34). Secure rear suspension group (34) to the chassis in a horizontal position with a suitable lifting device. Repeat for the other side.Show/hide tableIllustration 25 g03342208 (10) 473-1370 Power Train Ar or 387-8523 Power Train Ar - Attach a suitable lifting device to power train arrangement (10). The weight of power train arrangement (10) is approximately
25760 kg (56800 lb) . Position power train arrangement (10).Note: Support the rear axle with suitable cribbing before removing any lifting device.
Show/hide tableIllustration 26 g03334073 (3) 281-3338 Lower Link Gp
(10) 278-8433 Power Train Ar or 387-8523 Power Train Ar
(19) 8T-7338 Bolt
(20) 198-4780 Hard Washer
(21) 514-0293 Plate
(22) 505-6560 Pin
(23) 8T-4193 Bolt
(24) 198-4780 Hard Washer
(25) 505-6561 Plate
(C) 386-6031 Lever Puller Hoist Gp - Use Tooling (C) to align the bores of power train arrangement (10) and lower link group (3) Install one pin (22), one plate (25), two hard washers (24), two bolts (23), one plate (21), two hard washers (20), and two bolts (19). Repeat for the remaining lower link groups.
- Remove Tooling (C).
Show/hide table
Illustration 27 g03334070 (34) 297-5609 Rear Suspension Gp Show/hide tableIllustration 28 g03334074 (29) 7Y-5217 Bolts
(30) 8T-3282 Hard Washers
(31) 150-3981 Plate
(32) 150-3772 Pin
(34) 297-5609 Rear Suspension GpShow/hide tableIllustration 29 g06049986 Typical Example 2 places Note: Install the grease fittings prior to pinning the cylinder.
- Attach a suitable lifting device to rear suspension group (34). The weight of rear suspension group (34) is approximately
480 kg (1060 lb) . Lower rear suspension group (34). Align the bores of rear suspension group (34) and the power train arrangement. Install pin (32), one plate (31), six hard washers (30), and six bolts (29). Repeat for the other side.Note: Ensure pins (32) are oriented with the grease ports towards the axle housing.
- Lower power train arrangement (10) onto suitable cribbing. Remove the suitable lifting device from the power train arrangement (10).
Show/hide table
Illustration 30 g03334078 (33) 221-3417 Pressure Sensor Gp - Connect pressure sensor group (33). Repeat for the other side.
Show/hide table
Illustration 31 g03333676 (1) 303-2504 Slip Joint
(2) 156-7993 Bolts (M22X1.5X105-MM)Note: Use a suitable rubber or wood hammer to seat the u-joints in the yoke of the transmission and the yoke of the torque converter. Ensure the u-joints are fully seated prior to tighten bolts (2) to the final torque.
- Install slip joint (1) to the transmission with four bolts (2). Tighten eight bolts (2) in a cross pattern to a torque of
775 ± 40 N·m (572 ± 30 lb ft) .Show/hide tableIllustration 32 g03333674 (14) 8T-4137 Bolts
(15) 8T-4121 Hard Washers
(16) 340-7065 Plate
(17) 340-7054 Plate As - Install 11 bolts (14), 11 hard washers (15), one plate (16), and one plate assembly (17).
Show/hide table
Illustration 33 g03333675 (11) 8T-4137 Bolts
(12) 8T-4121 Hard Washers
(13) 340-7068 Plate As - Install ten bolts (11), ten hard washers (12), and one plate assembly (13).
Illustration 2 | g03146912 |
(11) 8T-4137 Bolts (M10X1.5X20-MM)
(12) 8T-4121 Hard Washers (13) 340-7068 Plate As |