2570C and 2670C Wheel Feller Bunchers Engine Supplement Caterpillar


Electronic Control Module - Remove and Install

Usage:

2670C B3E

Removal Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     370-8376     Cap Kit     1    

  1. Turn the battery disconnect switch to the OFF position.

  1. Turn the fuel supply to the OFF position.



    Illustration 1g02163193

    Typical example

  1. Cut all cable straps that attach the wiring harness assemblies to electronic control module (6) .

    Note: Note position of cable straps that attach the wiring harness assemblies to the electronic control module.

  1. Remove bolt (2). Loosen allen head bolts (3) that secures engine wiring harness assembly (4) to electronic control module (6). Disconnect the engine wiring harness assembly from the electronic control module.

  1. Remove bolt (7). Loosen allen head bolts (5) that secures engine wiring harness assembly (9) to electronic control module (6). Disconnect the Original Equipment Manufactures (OEM) wiring harness assembly from the electronic control module.

  1. Position harness assembly (9) and harness assembly (4) away from electronic control module (6) .

  1. Make temporary identification marks on fuel line (1) and fuel line (8) in order to show the correct position of the fuel lines.

  1. Place a suitable container below electronic control module (6) in order to catch any fuel that might be spilled.



    Illustration 2g02163197

    Typical example

  1. Loosen banjo bolt (10) and banjo bolt (13) in order to drain the fuel from the electronic control module.

  1. Remove banjo bolt (10) from fuel line (1). Remove sealing washers (11) from banjo bolt (10) .

  1. Remove fuel line (1) from fuel line clips. Position the fuel line away from the electronic control module.

  1. Use Tooling (A) to cap fuel line (1) and plug the connection on the electronic control module.

  1. Remove banjo bolt (13) from fuel line (8). Remove sealing washers (12) from banjo bolt (13) .

  1. Use Tooling (A) to cap fuel line (8) and plug the connection on the electronic control module.



    Illustration 3g02163198

    Typical example




    Illustration 4g02163199

    Typical example

  1. Loosen bolts (18) for electronic control module (6) .

  1. Remove bolts (18) and remove washers (16) and washer (17). Take care to prevent damage to ground connection (14) .

    Note: Support the weight of the electronic control module as the remaining bolts are removed.

  1. Remove bracket (13) and remove electronic control module (6) from mounting bracket for the electronic control module.

    Note: Note the orientation of the electronic control module.

  1. If necessary, follow Step 18.a through Step 18.c in order to disassemble the electronic control module.

    1. Remove connection (21) and O-ring seal (22). Use Tooling (A) to plug the electronic control module and cap the connection.

    1. Remove connection (24) and O-ring seal (23) (not shown). Use Tooling (A) to plug the electronic control module and cap the connection.

    1. Remove isolation mounts (15), isolation mounts (19), and limit sleeves (20) from electronic control module (6) .

Installation Procedure

  1. If a replacement electronic control module is installed, the module must be programmed with the correct information. Refer to Troubleshooting Guide, "Replacing the ECM" and refer to Troubleshooting Guide, "Flash Programming" for the correct procedure.

  1. Ensure that the electronic control module is clean and free from damage. If necessary, replace the electronic control module.



    Illustration 5g02163199

    Typical example

  1. If necessary, follow Step 3.a through Step 3.d in order to assemble electronic control module (6) .

    1. Remove the cap from connection (21). Install a new O-ring seal (22) to the connection.

    1. Remove the cap from connection (24). Install a new O-ring seal (23) (not shown) to the connection.

    1. Remove the plugs from electronic control module (6) .

    1. Install connector (21) and connector (24) to electronic control module (6). Tighten the connections to a torque of 18 N·m (159 lb in).



    Illustration 6g02163198

    Typical example




    Illustration 7g02163646

    Typical example

  1. Install isolation mounts (15), isolation mounts (19), and limit sleeves (20) to electronic control module (6) .

  1. Install washers (16) and washer (17) to bolts (18) to the lower isolation mounts.

    Note: Ensure that ground strap (14) for the electronic control module is clamped between washer (16) and washer (17) .

  1. Position electronic control module (6) on mounting bracket (25) for the electronic control module. Loosely install bolts (18) .

    Note: Ensure that the electronic control module is correctly oriented.

  1. Position bracket (13) onto electronic control module (6). Install remaining bolts (18) to bracket (13) .

  1. Tighten bolts (18) to a torque of 22 N·m (195 lb in).

    Note: Ensure that the ground strap is not strained as the bolt is tightened.




    Illustration 8g02163660

    Typical example

  1. Install a new sealing washer (12) to banjo bolt (13) .

  1. Remove the plug from fuel line (8) and remove the plug from connection (24) on the electronic control module.

  1. Install banjo bolt (13) to fuel line (8) and install remaining new washer (12) to banjo bolt (13). Position fuel line assembly (8) onto connection (24) and hand tighten banjo bolt.

  1. Tighten banjo bolt (13) to a torque of 18 N·m (159 lb in).

    Note: Ensure that the fuel line is not strained as the banjo bolt is tightened.

  1. Install a new sealing washer (11) to banjo bolt (10) .

  1. Remove the plug from fuel line (1) and remove the plug from connection (21) on the electronic control module.

  1. Install banjo bolt (10) to fuel line (1) and install remaining new washer (11) to banjo bolt (10). Position fuel line assembly (1) onto connection (21) and hand tighten banjo bolt.

  1. Install fuel line (1) to fuel line clips.

  1. Tighten banjo bolt (10) to a torque of 18 N·m (159 lb in).

    Note: Ensure that the fuel line is not strained as the banjo bolt is tightened.




    Illustration 9g02163193

    Typical example

  1. Connect engine wiring harness assembly (4) to electronic control module (6). Tighten allen head bolt (3) to a torque of 6 N·m (53 lb in).

    Note: Care must be taken in order to avoid damage to the connector pins during installation of the wiring harness assembly.

  1. Install bolt (2) and tighten the bolt to a torque of 6.5 N·m (58 lb in).

  1. Connect OEM wiring harness assembly (9) to electronic control module (6). Tighten allen head bolt (5) to a torque of 6 N·m (53 lb in).

    Note: Care must be taken in order to avoid damage to the connector pins during installation of the harness assembly.

  1. Install bolt (7) and tighten the bolt to a torque of 6.5 N·m (58 lb in).

  1. Install new cable straps to the wiring harness assemblies.

    Note: Ensure that the cable straps meet the Original Equipment Manufactures (OEM) specifications.

  1. Turn the fuel supply to the ON position.

  1. Turn the battery disconnect switch to the ON position.

  1. Remove the air from the fuel system. Refer to Operation and Maintenance Manual, "Fuel System - Prime" for the correct procedure.

Caterpillar Information System:

PL83 Pipelayer Mounting and Dismounting
2011/05/05 Updated Ring And Pinion Gear Sets For Improved Service Life {3256, 3258}
735B, 740B and 740B EJECTOR Articulated Trucks Engine Supplement Engine and Transmission - Connect
2570C and 2670C Wheel Feller Bunchers Engine Supplement Water Pump - Remove and Install
AP1000F Asphalt Paver Machine Systems Front Wheel Drive Manifold - Install
AP1000F Asphalt Paver Machine Systems Front Wheel Drive Manifold - Remove
2011/05/05 An Improved Hose is Available for Radiator and Oil Cooler Mounting Group {1380}
AS3301C Asphalt Screed Screed Plates
AS2302C Asphalt Screed Screed Plates
C175-16 and C175-20 Engines for Off-Highway Trucks Gear Group (Front)
797F and 797F XQ Off-Highway Truck Hydraulic Fan System Piston Motor (Hydraulic Fan) - Extra Retarding
2011/05/16 A New Gasket Is Used for the Water Lines on Certain C15 and C18 Machine Engines {1052, 1380}
Procedure to Install the Rear Axle Oil Cooler on the 797F Off-Highway Truck {1365} Procedure to Install the Rear Axle Oil Cooler on the 797F Off-Highway Truck {1365}
PL83 Pipelayer Operator Controls
PL83 Pipelayer Mirror - If Equipped
PL83 Pipelayer Monitoring System
PL83 Pipelayer Operation Information
C175-16 Engine for 795F Series AC Off-Highway Trucks Gear Group (Front)
320D and 323D Excavators Machine System Specifications Shuttle Valve (Pilot Lines)
3524B and C175 Engines for Off-Highway Truck/Tractors Turbocharger
320D and 323D Excavators Machine System Specifications Swing Cushion Valve - Fine Swing
C175-16 and C175-20 Engines for Off-Highway Trucks Engine Oil Pan
C175-16 and C175-20 Engines for Off-Highway Trucks Engine Oil Pan
C175-16 and C175-20 Engines for Off-Highway Trucks Exhaust Lines
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.