    Illustration 1g01058604

  1. Place planetary gear (1) on a suitable bench.

  2. Install retaining ring (4) in planetary gear (1).

  3. Use a suitable press to install bearing cups (3).

  4. Apply clean oil to bearing cones (2). Assemble the bearing cones in planetary gear (1).

  5. Repeat Steps 2 through 4 for the remaining planetary gears.

  6. Use a suitable lifting device to position the gear assembly in the carrier. The gear assembly weighs approximately 90 kg (200 lb).


    Illustration 2g01058608

  7. Use a suitable press to install planetary shaft (6). Rotate planetary gear (1) while the planetary shaft is being pressed into position.

    Note: The shaft should be installed at the room temperature. Do not lower the temperature of planetary shaft (6) before installation.

  8. Repeat Steps 6 and 7 for the remaining planetary gears.

  9. Reposition carrier (5).


    Illustration 3g01058599

  10. Use Tooling (B) to measure the gap between the counterbore in carrier (5) and planetary shaft (6).


    Illustration 4g01058617

  11. Assemble shim (9) with a thickness that is equal to the gap +0.00 mm to −.05 mm (+0.00 inch −.002 inch).

  12. Use two bolts (7) to install plate (8) and shim (9). Tighten bolts (7) to a torque of 135 ± 15 N·m (99.6 ± 11.1 lb ft).

    Note: Before installation, apply Tooling (D) to the threads of bolts (7).

  13. Repeat Steps 7 and 12 for the remaining planetary gears.

  14. Rotate each planetary gear (1) by hand. Be certain that the movement of each planetary gear (1) is uniform.

Second Reduction Planetary Component

Note: Steps 1 through 4 are for the installation of straight roller bearings.



    Illustration 5g01053034
    Machined tang (F) of gear that fits between the straight roller bearing assemblies.


    Illustration 6g01053035
    Bearing assembly (10) with retaining straps (C).


    Illustration 7g01053037


    Illustration 8g01053041

    Note: To install the new straight roller bearing, use retaining straps (C) that hold the rollers in place.

    Note: Do not use the spacer and the snap ring with the new gear and new bearing.

  1. Assemble bearing (10) in gear (11). Retaining straps (C) come off bearing assembly (10) as bearing assembly (10) is installed.

  2. Turn over gear (11) and repeat Step 1 for the other bearing.

  3. Repeat Step 1 and Step 2 for the other planetary gears.

  4. Proceed to Step 10 for final assembly.


    Illustration 9g00531370

  5. Place planetary gears (18) on a suitable bench.

  6. Install retaining ring (24) in planetary gear (18).


    Illustration 10g00531861


    Illustration 11g01058639

  7. Use a suitable press to install cup (26), spacer (16), and cup (15).

  8. Apply clean oil to cone (17), cone spacer (19), and cone (14). Assemble the cones and the cone spacer in planetary gear (18).

  9. Repeat Steps 5 through 8 for the remaining planetary gears.

  10. Place a suitable strap throught the gear and the bearing assemblies. Fasten the strap to a suitable lifting device and position the planetary gear in the carrier. The weight of the gear assembly is appoximately 125 kg (275 lb).


    Illustration 12g01058635

  11. Use a suitable press to install planetary shaft (20). Rotate planetary gear (18) while the planetary shaft is pressed into position. Shoulder (X) of the planetary shaft must be seated against the carrier.

    Note: The planetary shaft must be installed at room temperature. Do not lower the temperature of planetary shaft (20) before installation.

  12. Repeat Steps 10 and 11 for the remaining planetary gears.


    Illustration 13g01058645

  13. Reposition the carrier.

  14. Use Tooling (B) to measure the gap between counterbore (Y) and planetary shaft (20).


    Illustration 14g01058646

  15. Assemble shim (21) with a thickness that is equal to the gap +0.00 mm to −.05 mm (+0.00 inch −.002 inch).


    Illustration 15g01058647

  16. Use two bolts (22) to install plate (23) and shim (21). Tighten bolts (22) to a torque of 255 ± 15 N·m (188.1 ± 11.1 lb ft).

    Note: Before installation, apply Tooling (D) to the threads of bolts (22).

  17. Repeat Steps 13 and 16 for the remaining planetary gears.

  18. Rotate each planetary gear (18) by hand. Be certain that the movement of each planetary gear (18) is uniform.

End By:

  1. Install the rear axle shafts. Refer to Disassembly and Assembly, "Axle Shaft - Install".

  2. Install the carrier of the second reduction planetary component. Refer to Disassembly and Assembly, "Final Drive - Remove".

Caterpillar Information System:

583R Pipelayer Hydraulic System Hydraulic Pump
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Air Compressor
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Machine Electronic Control Module (Integrated Brake)
793B Off-Highway Truck Power Train General Information
69D and 769D Off-Highway Truck and 771D Quarry Truck Hydraulic System Hoist Cylinder Performance - Test
69D and 769D Off-Highway Truck and 771D Quarry Truck Hydraulic System Brake Oil Overheating Troubleshooting
216, 226, 228, 232, 236, 242, 246, 248, 252 and 262 Skid Steer Loaders Parking
784C and 785C Off-Highway Trucks Machine Systems Gear Pump (Hoist and Rear Brake Cooling) - Assemble
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Air System
988G Wheel Loader Braking System Brake Accumulator
69D, 769D , 773D, 773E, 776D, 777D, 784C, 785C, 785D, 789C, 789D, 793C and 793D Off-Highway Trucks and 771D, 775D and 775E Quarry Trucks Braking System Glossary of Electrical Terms
793C and 793C XQ Off-Highway Truck Air System and Brakes Oil Filter (Front Brake Cooling)
773D Off-Highway Truck and 775D Quarry Truck Hydraulic System Relief Valve (Hoist Dual Stage) - Test and Adjust
793C Off-Highway Truck Power Train Transmission Hydraulic Control - Test
784C and 785C Off-Highway Trucks Machine Systems Pump Drive - Disassemble
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Air Dryer (Brake System)
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Air Tank (Service Brake and Retarder)
3306C Engines for Caterpillar Built Machines Fuel System
5110B Excavator, 24H Motor Grader, 69D, 769D, 773D, 773E, 776D and 777D Off-Highway Truck/Tractors, 771D, 775D and 775E Quarry Trucks and AD40 Series II, AD45 and AE40 II Underground Articulated Trucks Caterpillar Monitoring System Alert Indicator Description
773D Off-Highway Truck and 775D Quarry Truck Hydraulic System Relief Valve (Hoist Dual Stage) - Test and Adjust
793C Off-Highway Truck Power Train Cam and Spring Assembly (Selector and Pressure Control Valve) - Adjust
583R Pipelayer Hydraulic System Boom and Hook Control Valve
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Pressure Protection Valve (Brake Air System)
69D and 769D Off-Highway Truck and 771D Quarry Truck Hydraulic System Gear Pump (Hoist and Brake) Efficiency - Test
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.