Usage:
Typical Example
1. Install lock pin (3) in the wheel lean bar and the front axle.
Do not remove any pins from the wheel lean bar until the lockpin has been installed. |
2. Lift the front of the machine enough to get the weight off the axle. Install tooling (A) as supports under the front axle near each wheel.
3. Fasten tooling (B) to both wheel lean arms and the frame.
Typical Example
4. Remove the nuts, washers and bolts (1) and (5). Remove the locks that hold the pins (6) and (8) in the wheel lean arm. Remove bolts (2) and (4) and the retainers from the pins. Remove pins (6) and (8) from the wheel lean bar.
Do not remove the pins from the wheel lean arm. |
5. Remove lock pin (3) from wheel lean bar (7) and the front axle.
6. Fasten a hoist to wheel lean bar (7). Remove wheel lean bar (7). Weight is 25 Kg (55 lb.).
7. Remove the seals and bearings from each end of wheel lean bar (7) with tooling (C).
NOTE: The following steps are for installation of the wheel lean bar.
8. Install a new seal in each end of wheel lean bar (7) with tooling (C). Install the seal with the lip toward the outside and even with the outside surface of the wheel lean bar.
9. Install a new bearing in each end of the wheel lean bar with tooling (D).
NOTICE |
---|
Tooling (D) must be used to install the bearings to prevent damage. |
10. Install another new seal in each end of the wheel lean bar with tooling (C). Install the seal with the lip toward the outside and even with the outside surface of wheel lean bar (7).
11. Fasten a hoist to wheel lean bar (7). Put it in position on the machine. Install Lock Pin (3) in the wheel lean bar and the front axle.
12. Put the wheel lean arms in alignment with wheel lean bar (7). Install pins (6) and (8) in the wheel lean bar. Make sure the groove in the pins is in alignment with the groove in the wheel lean arms. Install the lock, bolt, washer and nut in each wheel lean arm and pin. Do not tighten the bolt.
13. Install the retainers and the bolts that hold the retainers to pins (6) and (8). Maintain 0.76 mm (.030 in.) gap between the retainer and the wheel lean bar. Tighten bolts (1) and (5).
14. Remove tooling (B). Lift the machine enough to remove tooling (A). Lower the machine to the ground.