This Special Instruction contains information for installing the Asset IQTM System - Oil & Gas on all Caterpillar and non-Caterpillar Diesel, Natural Gas, and Dynamic Gas Blending engines. The Asset IQTM System Oil & Gas is used to gather information about the performance of an engine. The system consists of a radio box group and a sensor box group. The sensor box group will gather information from various sensors installed on the engine and will transmit this data, along with diagnostic information to the radio box group to be displayed locally and transmitted to PL web.
Important Safety Information
Do not perform any procedure in this special instruction until this special instruction has been read in entirety, and understood. Use only proper tools and observe all precautions that pertain to the use of those tools. Failure to follow these procedures can result in personal injury. The following procedures should be observed.
Work safely. Most accidents that involve product operation, maintenance, and repair are caused by failure to observe basic safety rules or precautions. An accident can often be avoided by recognizing potentially hazardous situations before an accident occurs. A person must be alert to potential hazards. This person should also have the necessary training, skills, and tools to perform these functions properly.
Safety precautions and warnings are provided in this instruction and on the product. If these hazard warnings are not heeded, bodily injury or death could occur to you or to other persons. Caterpillar cannot anticipate every possible circumstance that might involve a potential hazard. Therefore, the warnings in this publication and the warnings that are on the product are not all inclusive.
Ensure that any tool, procedure, work method, or operating technique you use that is not recommended by Caterpillar is safe. Ensure that the product will not be damaged or the product will be made unsafe by the operation, lubrication, maintenance, or the repair procedures that are used.
Personal injury or death can result from improper assembly procedures. Do not attempt any assembly until you have read and understand the assembly instructions. |
Accidental engine starting can cause injury or death to personnel working on the equipment. To avoid accidental engine starting, disconnect the battery cable from the negative (−) battery terminal. Completely tape all metal surfaces of the disconnected battery cable end in order to prevent contact with other metal surfaces which could activate the engine electrical system. Place a Do Not Operate tag at the Start/Stop switch location to inform personnel that the equipment is being worked on. |
Working with electrical circuits is hazardous. Bodily contact with electrical potential will cause personal injury or death. Ensure that personnel are trained in proper operating procedures in order to ensure safe operation. |
Applicability
The Asset IQTM - Oil & Gas is offered as an aftermarket attachment for use on all diesel, natural gas, and Dynamic Gas Blending engines, both Caterpillar and competitive brands, providing a fleet solution for equipment owners.
Electrical Requirements
This control is designed to operate on 12 or 24 volts DC, negative ground. Current draw of the control package is less than 2.0 amps. External solenoids or other loads driven by the system and connection of a CAT® Electronic Technician (ET) communications adapter will add to the current draw.
Features
The complete system comes in two boxes. The sensor box group is for attaching all the sensors needed to monitor the engine package. The radio box group which contains a display and all the telematics is to transmit all the data to the local Ethernet and to PL web.
The Asset IQTM System - Oil & Gas supports J1939 only protocols for communication with a monitoring and recording device.
Asset IQTM System - Oil & Gas Kit Supplied Parts for Installation
538-8656 Installation Group | ||
Qty | Part Number | Part Name |
1 | Box GP (Asset IQ - Sensor) | |
1 | Box GP (Asset IQ - Radio) | |
1 | Sensor GP - Asset IQ | |
1 | Software GP - A3000 |
481-2111 Install GP - Field (Engine Wiring Group) | ||
Qty | Part Number | Part Name |
1 | Install GP - Field (Engine Speed Sensor) | |
1 | Install GP - Field (Ambient Temperature Sensor) | |
1 | Install GP - Field (Engine Coolant Temperature Sensor) | |
1 | Install GP - Field (Engine Oil Pressure Sensor) | |
1 | Install GP - Field (Fuel Pressure Sensor) | |
1 | Install GP - Field (Air Intake Pressure Sensor) | |
1 | Install GP - Field (Air Inlet Restriction Sensor) | |
1 | Install GP - Field (Crankcase Pressure Sensor) | |
1 | Install GP - Field (Exhaust Back Pressure Sensor) | |
2 | Install GP - Field (Thermocouple - Right Angle) | |
1 | Install GP - Field (30L Mounting Hardware) |
Additional Parts Need for Installation
Field Fabricated Mounting Brackets
Given the wide range of machines to which the Asset IQTM System - Oil & Gas and extra sensors/add-ons can be applied, a standardized mounting method is not possible. Some of the sensors/add-ons will require field fabricated brackets for mounting.
Sensor Hookup Wire
To install the sensors, 136-5321 Cable As (
Wiring Diagram
Note: During installation, it is important to protect wiring in key locations. Key locations are any area where the wiring could be nicked or cut and come in contact with the chassis. Avoid installation practices where there could be excessive flexing, chafing, or cutting of the wiring.
Asset IQTM System - Sensor Box Wiring Diagram
Illustrations 1, 2, 3, 4, 5, 6, 7, 8, and 9 outline all the possible connections to the 533-0540 Asset IQ - Sensor Box.
Illustration 1 | g06257375 |
Top Half of Asset IQTM - Sensor Box Wire Diagram |
Illustration 2 | g06257404 |
Bottom Half of Asset IQTM - Sensor Box Wire Diagram |
Illustration 3 | g06257425 |
Asset IQTM - Sensor Box Wiring Diagram |
Illustration 4 | g06257493 |
Asset IQTM - Sensor Box Wiring Diagram |
Illustration 5 | g06257503 |
Asset IQTM - Sensor Box Wiring Diagram |
Illustration 6 | g06257509 |
Sensor Box Wiring Diagram |
Illustration 7 | g06257534 |
Sensor Box Wiring Diagram |
Illustration 8 | g06257535 |
Sensor Box Wiring Diagram |
Illustration 9 | g06257536 |
Sensor Box Wiring Diagram |
Illustration 10 outlines the connections to the 532-8736 Asset IQ - Radio Box
Illustration 10 | g06257545 |
Asset IQTM - Sensor Box Wiring Diagram |
Engine Preparation
- Stop the engine.
- Follow all Lock Out/Tagged Out Procedures.
Installation of the Asset IQTM - Sensor Box
Due to the variable options, mounting of the Asset IQTM Sensor Box is left to the discretion of the installer. Use the following requirements to fabricate any brackets required for mounting the Sensor Box in a location that meets the following requirements.
- Access to battery (+).
- Access to battery (-).
- Access to keyswitch as supplied by the ignition system. If keyswitch is unavailable, use battery (+ ) power.
- Access to the main data link(s) on the engine.
- Do not mount the sensor box on the engine because of excessive vibration.
Installation of the Asset IQTM - Radio Box
Due to the variable options, mounting of the Asset IQTM Sensor Box is left to the discretion of the installer. Use the following requirements to fabricate any brackets required for mounting the Radio Box in a location that meets the following requirements.
- Access to battery (+).
- Access to battery (-).
- Access to keyswitch as supplied by the ignition system. If keyswitch is unavailable, use battery + power.
- Position the radio box less than 50 routed wiring feet from the sensor box.
Note: Must be located where the display is safely accessible while the engine is running.
- Must be located where the antenna can be routed to an unobstructed view of the sky. Refer to Special Instruction , REHS8850 and REHS9111 for the antenna installation.
- Once the antenna is mounted, route the coaxial cable back to the radio box and inside to connect to the preinstalled radio.
Note: During installation, it is important to protect wiring in key locations. Key locations are any area where the wiring could be nicked or cut and come in contact with the chassis. Avoid installation practices where there could be excessive flexing, chafing, or cutting of the wiring.
Configuration of the Installed System
Each Asset IQTM System - Oil & Gas will come from the manufacturer with the software flashed into the Electronic Control Module (ECM) and the system configuration already loaded into the ECM.
Electrical Validation of the Installed System
Power, Ground, Keyswitch Connections Test
- Connect power, ground, and keyswitch.
- Connect a digital volt meter negative lead to the chassis.
- With the power OFF connect a digital volt meter positive lead to terminal block 27B. The resistance should be less than 3 ohms and no voltage present.
- With the power ON connect a digital volt meter positive lead to terminal block 27B. The expected result is battery voltage.
- With the power ON and the key switch OFF, connect a digital volt meter positive lead to terminal block 27A. The expected result is close to zero volts.
Communications Link Connections Test
- Turn the keyswitch to the ON position.
- Connect Cat ET adapter to A-C7 CAN A. Set protocol option to J1939.
- Using Cat ET, verify that three ECMs are detected.
- Read Cat ET status screen to check that the ECM is reporting the ECM part number and serial number, software group part number, release date, and description.
- Verify that there are no errors being reported.
Asset IQTM Basic Sensor Options
This section will describe the available basic sensor options for the Asset IQTM system.
This group is for use with the Asset IQTM System to monitor the engine coolant temperature.
481-2112 Temperature Sensor Gp (Coolant) | ||
---|---|---|
Qty | Part Number | Part Name |
1 | O-Ring Seal | |
4 | Connector Socket | |
1 | Socket Connector | |
1 | Plug Lock Wedge | |
1 | Connector Plug As | |
1 | Temperature Sensor |
Illustration 11 | g06257741 |
Coolant Pressure Sensor |
Note: To install the temperature sensor, order the 136-5321 Cable As (Bulk).
- Install 3K-0360 O-Ring Seal onto 264-4297 Temperature Sensor.
- Locate an unused temperature port on the engine block and install 264-4297 Temperature Sensor. Tighten to
20 ± 3 N·m (15 ± 2 lb ft) . - Cut a
7.62 m (25 ft) piece or as needed from 136-5321 Cable As (Bulk). On one end remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed Red and Drain wire. Install 9X-3402 Connector Sockets on the white and black wires. Install sockets into 155-2269 Connector Plug As. - Route the harness back to the Asset IQTM ECM. Remove excess wire and remove
152.4 mm (6 inch) or as needed of the harness jacket. Cut off the red wire. Install the black wire into terminal block 38C and install the white wire into terminal block 38A. Install the drain wire into terminal 5 of the chassis ground bus. Refer to Illustration 11 for the correct location of the wires.
This group is for use with the Asset IQTM System to monitor the engine oil pressure.
481-2113 Pressure Sensor Gp (Oil) | ||
---|---|---|
Qty | Part Number | Part Name |
1 | O-Ring Seal | |
6 | Connector Socket | |
1 | Socket Connector | |
1 | Connector Plug As | |
1 | Pressure Sensor Gp |
Illustration 12 | g06257784 |
Oil Pressure Sensor |
Note: To install the pressure sensor, order 136-5321 Cable As (Bulk).
- Install 6V-9028 O-Ring Seal onto 274-6719 Pressure Sensor Gp.
- Locate an unused oil pressure port on the engine block and install 274-6719 Pressure Sensor Gp. Tighten to
10 ± 2 N·m (7 ± 1 lb ft) . - Cut a
7.62 m (25 ft) piece or as needed from 136-5321 Cable As (Bulk). On one end remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed drain wire. Install 9X-3402 Connector Sockets on the red, black, and white wires. Install sockets into 281-8804 Connector Plug As. - Route the harness back to the Asset IQTM ECM. Remove excess wire and remove
38 mm (1.5 inch) or as needed of the harness jacket. Install the red wire into terminal block 37B, install the black wire into terminal block 37C, and install the white wire into terminal block 37A. Install the drain wire into terminal 4 of the chassis ground bus. Refer to Illustration 12 for the correct location of the wires.
This group is for use with the Asset IQTM System to monitor the engine speed without fuel flow system.
481-2114 Speed Sensor Gp (Engine) | ||
---|---|---|
Qty | Part Number | Part Name |
4 | Connector Socket | |
1 | Socket Connector | |
1 | Connector Plug As | |
1 | Plate | |
1 | Speed Sensor Gp |
Note: To install the engine speed sensor, order 136-5321 Cable As (Bulk).
- Remove plug in flywheel housing and install 318-1181 Speed Sensor Gp. Screw in sensor until sensor contacts flywheel. After the speed sensor contacts the flywheel, back the speed sensor out one full turn and tighten jam nut to
25 ± 5 N·m (18 ± 4 lb ft) .Show/hide tableIllustration 14 g06257876 Engine Speed Sensor - Cut a
7.62 m (25 ft) piece or as needed from 136-5321 Cable As (Bulk). On one end remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed red and drain wire. Install 9X-3402 Connector Sockets on the black and white wires. Install sockets into 155-2269 Connector Plug As. - Route the harness back to the Asset IQTM ECM. Remove excess wire and remove
38 mm (1.5 inch) or as needed of the harness jacket. Cut off the red wire. Install the black wire into terminal block 30C and install the white wire into terminal block 30A. Install the drain wire into terminal 1 of the chassis ground bus. Refer to Illustration 14 for the correct location of the wires.
Illustration 13 | g06257821 |
Speed Sensor (1) |
This group is for use with the Asset IQTM system to monitor the ambient air temperature.
498-5600 Temperature Sensor Gp (Ambient) | ||
---|---|---|
Qty | Part Number | Part Name |
1 | Locknut | |
1 | O-Ring Seal | |
1 | Seal Plug | |
6 | Connector Socket | |
1 | Receptacle Kit | |
1 | Socket Connector | |
1 | Connector Plug As | |
1 | Temperature Sensor Gp |
Illustration 15 | g06257889 |
Ambient Temperature Sensor |
Note: To install the temperature sensor, order 136-5321 Cable As (Bulk). Also, fabricate a bracket for the temperature sensor. The mounting location needs to be in a location off the engine and out of the flow of hot or cold air flow directly on the sensor.
- Install 3J-1907 O-Ring Seal onto 288-8390 Temperature Sensor Gp.
- Install 288-8390 Temperature Sensor Gp onto field fabricated bracket and install 2P-1279 Locknut. Tighten to
20 ± 5 N·m (15 ± 4 lb ft) . - Cut a
7.62 m (25 ft) piece or as needed from 136-5321 Cable As (Bulk). On one end remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed drain wire and shielding. Install 9X-3402 Connector Sockets on the red, black, and white wires. Install sockets into 230-5008 Connector Plug As. - Route the harness back to the Asset IQTM ECM. Remove excess wire and remove
38 mm (1.5 inch) or as need of the harness jacket. Install the red wire into terminal block 31B, install the black wire into terminal block 31C, and install the white wire into terminal block 31A. Install the drain wire into terminal 2 of the chassis ground bus. Refer to Illustration 15 for the correct location of the wires.
This group is for use with the Asset IQTM System to monitor the engine fuel pressure.
498-5601 Pressure Sensor Gp (Fuel) | ||
---|---|---|
Qty | Part Number | Part Name |
6 | Connector Socket | |
1 | Socket Connector | |
1 | Connector Plug As | |
1 | Plug Lock Wedge | |
1 | Pressure Sensor Gp |
Illustration 16 | g06257945 |
Fuel Pressure Sensor |
Note: To install the pressure sensor, order 136-5321 Cable As (Bulk).
- Locate a port after the fuel filters and install 216-8684 Pressure Sensor Gp. Tighten to
10 ± 2 N·m (7 ± 1 lb ft) . - Cut a
7.62 m (25 ft) or as needed from 136-5321 Cable As (Bulk). On one end remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed drain wire. Install 9X-3402 Connector Sockets on the red, black, and white wires. Install sockets into 155-2267 Connector Plug As. - Route the harness back to the Asset IQTM ECM. Remove excess wire and remove
38 mm (1.5 inch) or as needed of the harness jacket. Install the red wire into terminal block 32B, install the black wire into terminal block 32C, and install the white wire into terminal block 32A. Install the drain wire into terminal 3 of the chassis ground bus. Refer to Illustration 16 for the correct location of the wires.
Air Intake Pressure Sensor Kit (In or Out Press) and
This group is for use with the Asset IQTM System to monitor the engine oil pressure.
498-5602 Pressure Sensor Gp (Air) | ||
---|---|---|
Qty | Part Number | Part Name |
6 | Connector Socket | |
1 | Socket Connector | |
1 | Connector Plug As | |
1 | Pressure Sensor Gp |
Note: To install the sensor, you will need to order 136-5321 Cable As (Bulk).
Installing Air Intake Pressure Sensor (In or Out)
Illustration 17 | g06257956 |
Air Intake Pressure Sensor (In) |
Illustration 18 | g06257958 |
Air Intake Pressure Sensor (Out) |
- Locate a port before or after the engine intercooler and install 305-6873 Pressure Sensor Gp. Tighten to
10 ± 2 N·m (7 ± 1 lb ft) . - Cut a
7.62 m (25 ft) piece or as needed from 136-5321 Cable As (Bulk). On one end remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed drain wire. Install 9X-3402 Connector Sockets on the red, black, and white wires. Install sockets into 281-8803 Connector Plug As. - Air Intake Pressure Sensor (In) Route the harness back to the Asset IQTM ECM. Remove excess wire and remove
38 mm (1.5 inch) or as needed of the harness jacket. Install the red wire into terminal block 39B, install the black wire into terminal block 39C, and install the white wire into terminal block 39A. Install the drain wire into terminal 6 of the chassis ground bus. Refer to Illustration 17 for the correct location of the wires. - Air Intake Pressure Sensor (Out) Route the harness back to the Asset IQTM ECM. Remove excess wire and remove
38 mm (1.5 inch) or as needed of the harness jacket. Install the red wire into terminal block 43B, install the black wire into terminal block 43C, and install the white wire into terminal block 43A. Install the drain wire into terminal 10 of the chassis ground bus. Refer to Illustration 18 for the correct location of the wires.
Installing Air Intake Restriction Sensor
Illustration 19 | g06257962 |
Air Intake Restriction Sensor |
- Locate a port just after the air intake filter and install 305-6873 Pressure Sensor Gp. Tighten to
10 ± 2 N·m (7 ± 1 lb ft) . - Cut a
7.62 m (25 ft) piece or as needed from 136-5321 Cable As (Bulk). On one end remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed drain wire. Install 9X-3402 Connector Sockets on the red, black, and white wires. Install sockets into 281-8803 Connector Plug As. - Route the harness back to the Asset IQTM ECM. Remove excess wire and remove
38 mm (1.5 inch) or as needed of the harness jacket. Install the red wire into terminal block 41B, install the black wire into terminal block 41C, and install the white wire into terminal block 41A. Install the drain wire into terminal 8 of the chassis ground bus. Refer to Illustration 19 for the correct location of the wires.
This group is for use with the Asset IQTM System to monitor the crankcase pressure.
498-7472 Pressure Sensor Gp (Crankcase) | ||
---|---|---|
Qty | Part Number | Part Name |
1 | O-Ring Seal | |
6 | Connector Socket | |
1 | Socket Connector | |
1 | Connector Plug As | |
1 | Pressure Sensor Gp |
Illustration 20 | g06257969 |
Crankcase Pressure Sensor |
Note: To install the pressure sensor, order 136-5321 Cable As (Bulk).
- Install 6V-6560 O-Ring Seal onto 274-6720 Pressure Sensor Gp.
- Locate a port on the side of the engine block and install 274-6720 Pressure Sensor Gp. Tighten to
10 ± 2 N·m (7 ± 1 lb ft) . - Cut a
7.62 m (25 ft) piece or as needed from 136-5321 Cable As (Bulk). On one end remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed drain wire. Install 9X-3402 Connector Sockets on the red, black, and white wires. Install sockets into 237-0227 Connector Plug As. - Route the harness back to Asset IQTM ECM. Remove excess wire and remove
38 mm (1.5 inch) or as needed of the harness jacket. Install the red wire into terminal block 42B, install the black wire into terminal block 42C, and install the white wire into terminal block 42A. Install the drain wire into terminal 9 of the chassis ground bus. Refer to Illustration 20 for the correct location of the wires.
This group is for use with the Asset IQTM System to monitor the Exhaust Back Pressure.
498-7473 Pressure Sensor Gp (Exhaust Back Pressure) | ||
---|---|---|
Qty | Part Number | Part Name |
7 | Connector Socket | |
|
Hydraulic Hose (#8 Hose) | |
2 | Adapter (Hose Barb) | |
1 | O-Ring Seal | |
1 | Connector Plug As | |
1 | Pressure Sensor Gp | |
2 | Hose Clamp | |
1 | Boss | |
1 | N/A | M12.5X1.5 STOR F X M12.5X1.5 STOR F Coupling(1) |
(1) | The M12X1.5 STOR x M12X1.5 STOR Female to Female Coupling is to be selected by the customer. |
Illustration 21 | g06257974 |
Exhaust Back Pressure Sensor |
Note: To install the exhaust back pressure sensor , order 136-5321 Cable As (Bulk).
- Install 228-7100 O-Ring Seal onto 330-6719 Pressure Sensor Gp.
- Cut a hole in the exhaust stack and install the 467-3156 Boss. Assemble the 185-1047 Adapter (Hose Barb) and the 359-7325 Hose Clamp to each end of the 122-6870 Hydraulic Hose (#8 Hose). Attach the hose assembly to the weld boss. Attach XXX-XXXX Hose Coupling to the end of the hose assembly and attach the 330-6719 Pressure Sensor Gp to the house coupling. Locate the sensor above the weld boss to prevent moisture from entering into the sensor.
- Cut a
7.62 m (25 ft) piece or as needed from 136-5321 Cable As (Bulk). On one end remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed drain wire. Install 9X-3402 Connector Sockets on the red, black, and white wires. Install sockets into 237-0227 Connector Plug As. - Route the harness back to the Asset IQTM ECM. Remove excess wire and remove
38 mm (1.5 inch) or as needed of the harness jacket. Install the red wire into terminal block 40B, install the black wire into terminal block 40C, and install the white wire into terminal block 40A. Install the drain wire into terminal 7 of the chassis ground bus. Refer to Illustration 21 for the correct location of the wires.
Asset IQTM Fuel Flow Options
For ordering and installation information, refer to Special Instruction, REHS8848.
Asset IQTM Exhaust Port Temperature Monitoring option
For ordering and installation information, refer to Special Instruction, M0069642.
Fluid Property Sensor Option
For ordering and installation information, refer to Special Instruction, M0077650.
RTD Module Option
RTD Installation Gp | |
---|---|
Part Number | Part Name |
Sensor Kit | |
Sensor Kit | |
Sensor Kit | |
Sensor Kit | |
Sensor Kit | |
Sensor Kit |
Compression Fittings for use with RTD Installation | ||
---|---|---|
Part Number | RTD Probe Size | Boss Fitting Size |
1/4 inch diameter | 1/4 inch NPT | |
1/4 inch diameter | 1/8 inch NPT | |
1/8 inch diameter | 1/4 inch NPT | |
1/8 inch diameter | 1/8 inch NPT |
Raw Water Inlet RTD
Illustration 22 | g06287760 |
- Locate the boss on the Raw Water Inlet side of the Oil Heat Exchanger. Select the required RTD and Compression Fitting from the above tables. Remove the plug from the Inlet boss and install the compression fitting with the RTD probe.
- Cut a
7.62 m (25 ft) piece or as needed from 481-2115 Cable As (Bulk Cable). On one end, remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed Drain wire. Install the 9X-3402 Connector Sockets on the Red, Black, and White wires. Install the sockets into the 269-8222 Connector Plug As and the 155-2276 Plug Lock Wedge as shown in the schematic. - Route the harness back to the Asset IQTM ECM. Remove the excess wire and remove
152.4 mm (6 inch) or as needed of the harness jacket. Install the Red wire into terminal block 07B, install the Black wire into terminal block 07C, and install the White wire into terminal block 07A. Install the Drain wire into terminal 17 of the Chassis Ground Bus. Use the schematic above as a guide.
Illustration 23 | g06287761 |
- Locate the boss on the Raw Water Outlet side of the Oil Heat Exchanger. Select the required RTD and Compression Fitting from the above tables. Remove the plug from the Outlet boss and install the compression fitting with the RTD probe.
- Cut a
7.62 m (25 ft) piece or as needed from 481-2115 Cable As (Bulk Cable). On one end, remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed Drain wire. Install the 9X-3402 Connector Sockets on the Red, Black, and White wires. Install the sockets into the 269-8222 Connector Plug As and the 155-2276 Plug Lock Wedge as shown in the schematic. - Route the harness back to the Asset IQTM ECM. Remove the excess wire and remove
152.4 mm (6 inch) or as needed of the harness jacket. Install the Red wire into terminal block 08B, install the Black wire into terminal block 08C, and install the White wire into terminal block 08A. Install the Drain wire into terminal 18 of the Chassis Ground Bus. Use the schematic above as a guide.
Water Inlet RTD
Illustration 24 | g06287765 |
- Locate the boss on the Water Inlet side of the Air Intake Cooler. Select the required RTD and Compression Fitting from the above tables. Remove the plug from the Inlet boss and install the compression fitting with the RTD probe.
- Cut a
7.62 m (25 ft) piece or as needed from 481-2115 Cable As (Bulk Cable). On one end, remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed Drain wire. Install the 9X-3402 Connector Sockets on the Red, Black, and White wires. Install the sockets into the 269-8222 Connector Plug As and the 155-2276 Plug Lock Wedge as shown in the schematic. - Route the harness back to the Asset IQTM ECM. Remove the excess wire and remove
152.4 mm (6 inch) or as needed of the harness jacket. Install the Red wire into terminal block 01B, install the Black wire into terminal block 01C, and install the White wire into terminal block 01A. Install the Drain wire into terminal 11 of the Chassis Ground Bus. Use the schematic above as a guide.
Water Outlet RTD
Illustration 25 | g06287767 |
- Locate the boss on the Water Outlet side of the Air Intake Cooler. Select the required RTD and Compression Fitting from the above tables. Remove the plug from the Outlet boss and install the compression fitting with the RTD probe.
- Cut a
7.62 m (25 ft) piece or as needed from 481-2115 Cable As (Bulk Cable). On one end, remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed Drain wire. Install the 9X-3402 Connector Sockets on the Red, Black, and White wires. Install the sockets into the 269-8222 Connector Plug As and the 155-2276 Plug Lock Wedge as shown in the schematic. - Route the harness back to the Asset IQTM ECM. Remove the excess wire and remove
152.4 mm (6 inch) or as needed of the harness jacket. Install the Red wire into terminal block 02B, install the Black wire into terminal block 02C, and install the White wire into terminal block 02A. Install the Drain wire into terminal 18 of the Chassis Ground Bus. Use the schematic above as a guide.
Oil Inlet RTD
Illustration 26 | g06287781 |
- Locate the boss on the Oil Inlet side of the Oil Heat Exchanger. Select the required RTD and Compression Fitting from the above tables. Remove the plug from the Inlet boss and install the compression fitting with the RTD probe.
- Cut a
7.62 m (25 ft) piece or as needed from 481-2115 Cable As (Bulk Cable). On one end, remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed Drain wire. Install the 9X-3402 Connector Sockets on the Red, Black, and White wires. Install the sockets into the 269-8222 Connector Plug As and the 155-2276 Plug Lock Wedge as shown in the schematic. - Route the harness back to the Asset IQTM ECM. Remove the excess wire and remove
152.4 mm (6 inch) or as needed of the harness jacket. Install the Red wire into terminal block 03B, install the Black wire into terminal block 03C, and install the White wire into terminal block 03A. Install the Drain wire into terminal 13 of the Chassis Ground Bus. Use the schematic above as a guide.
Oil Outlet RTD
Illustration 27 | g06287814 |
- Locate the boss on the Oil Outlet side of the Oil Heat Exchanger. Select the required RTD and Compression Fitting from the above tables. Remove the plug from the Inlet boss and install the compression fitting with the RTD probe.
- Cut a
7.62 m (25 ft) piece or as needed from 481-2115 Cable As (Bulk Cable). On one end, remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed Drain wire. Install the 9X-3402 Connector Sockets on the Red, Black, and White wires. Install the sockets into the 269-8222 Connector Plug As and the 155-2276 Plug Lock Wedge as shown in the schematic. - Route the harness back to the Asset IQTM ECM. Remove the excess wire and remove
152.4 mm (6 inch) or as needed of the harness jacket. Install the Red wire into terminal block 04B, install the Black wire into terminal block 04C, and install the White wire into terminal block 04A. Install the Drain wire into terminal 14 of the Chassis Ground Bus. Use the schematic above as a guide.
Air Intake Temperature RTD (Before Heat Exchanger)
Air Intake Inlet RTD
Illustration 28 | g06287822 |
- Locate the boss on the Air Intake Inlet side of the Air Intake Heat Exchanger. Select the required RTD and Compression Fitting from the above tables. Remove the plug from the Inlet boss and install the compression fitting with the RTD probe.
- Cut a
7.62 m (25 ft) piece or as needed from 481-2115 Cable As (Bulk Cable). On one end, remove38 mm (1.5 inch) of the jacket and shielding. Cut off exposed Drain wire. Install the 9X-3402 Connector Sockets on the Red, Black, and White wires. Install the sockets into the 269-8222 Connector Plug As and the 155-2276 Plug Lock Wedge as shown in the schematic. - Route the harness back to the Asset IQTM ECM. Remove the excess wire and remove
152.4 mm (6 inch) or as needed of the harness jacket. Install the Red wire into terminal block 05B, install the Black wire into terminal block 05C, and install the White wire into terminal block 05A. Install the Drain wire into terminal 15 of the Chassis Ground Bus. Use the schematic above as a guide.