Fixed Axle (Front) - Remove
Start By:
- Install the rear wheel chocks. Refer to Disassembly and Assembly, "Wheel Chock (Front and Rear) - Remove and Install".
- Connect the frame lock link. Refer to Disassembly and Assembly, "Steering Frame Lock - Separate and Connect".
- Remove the front tires. Refer to Disassembly and Assembly, "Tire and Rim - Remove and Install".
- Remove bolts (2) that connect front drive shaft (3) to the front axle. Tape spider assembly (1) to prevent spider assembly (1) from disassembling.
Show/hide table
Illustration 2 g01432086 - Disconnect hose assemblies (4), (5), and (6) from the top of the front axle assembly.
Show/hide table
Illustration 3 g01432103 - Attach a suitable lifting device to front axle assembly (7). The suitable lifting device should be fastened around the housing for the service brake, as shown. This will prevent front axle assembly (7) from rotating when front axle assembly (7) is lowered. The weight of front axle assembly (7) is approximately
19,050 kg (42,000 lb) .Show/hide tableIllustration 4 g01441220 Show/hide tableIllustration 5 g01432146 - Remove guard (9). Disconnect harness assembly (10). Remove bolts (8).
Show/hide table
Illustration 6 g01432147 - Use the suitable lifting device to lower front axle assembly (7) onto suitable dollies or skid pans. Pull axle assembly (7) out form under the machine.
Show/hide table
Illustration 1 | g01432085 |
Caterpillar Information System:
992K Wheel Loader and 854K Wheel Dozer Power Train Torque Converter (Lockup)
Procedure to Rework Loader Buckets for Use with Fusion Couplers {6001, 6129, 6434} Procedure to Rework Loader Buckets for Use with Fusion Couplers {6001, 6129, 6434}
Functionality for the Dual Tilt on the D9R and D9T{5104} Functionality for the Dual Tilt on the D9R and D9T{5104}
906, 907 and 908 Compact Wheel Loaders Power Train Service and Parking Brake (Standard Axle) - Remove
906, 907 and 908 Compact Wheel Loaders Power Train Front Axle Group - Install
906, 907 and 908 Compact Wheel Loaders Power Train Front Axle Group - Remove
854K Wheel Dozer Machine Systems Gear Pump (Steering Oil Cooler) (Steering Pilot) - Install
854K Wheel Dozer Machine Systems Gear Pump (Steering Oil Cooler) (Steering Pilot) - Remove
854K Wheel Dozer Machine Systems Piston Pump (Steering) - Install
854K Wheel Dozer Machine Systems Piston Pump (Steering) - Remove
Installation Procedure for Secondary Pin Retention System on Wheel Loaders{6107, 6118} Installation Procedure for Secondary Pin Retention System on Wheel Loaders{6107, 6118}
938H Wheel Loader and IT38H Integrated Toolcarrier Hydraulic System Main Control Valve
938H Wheel Loader and IT38H Integrated Toolcarrier Power Train Features
IT38H Integrated Toolcarrier and 938H Wheel Loader Transmission Electronic Control System MID 081 - CID 0368 - FMI 02
992K Wheel Loader Electrohydraulic System Electrical System Schematic
IT38H Integrated Toolcarrier and 938H Wheel Loader Transmission Electronic Control System MID 081 - CID 0590 - FMI 14
2008/01/21 A New Lubricator for the Air Starting Motor is Available {1451}
IT38H Integrated Toolcarrier and 938H Wheel Loader Transmission Electronic Control System Switch Circuits
2007/11/26 A New Sun Gear Assembly and a New Carrier are Now Used {4011}
D8T Track-Type Tractor Front Idler Position - Check
IT38H Integrated Toolcarrier and 938H Wheel Loader Transmission Electronic Control System MID 081 - CID 0428 - FMI 03
IT38H Integrated Toolcarrier and 938H Wheel Loader Transmission Electronic Control System MID 081 - CID 0428 - FMI 04
IT38H Integrated Toolcarrier and 938H Wheel Loader Transmission Electronic Control System MID 081 - CID 0607 - FMI 08
IT38H Integrated Toolcarrier and 938H Wheel Loader Transmission Electronic Control System MID 081 - CID 0608 - FMI 08