Cylinder Speed - Check
Note: The engine speed and/or the machine configuration that is used during this test can affect the results of this test. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for the engine speed that was used for this test. Refer to Testing and Adjusting, "Operational Checks" for the machine configurations that were used for this test.
Note: The relief valve pressure settings must be set to the relief valve pressure specification before performing this operational check. Refer to Testing and Adjusting, "Specifications".
Show/hide table
Required Tools     | |
Description     | Qty     |
Stopwatch     | 1     |
Boom Cylinder
- Start the engine.
Show/hide table
Illustration 1 | g01187151 |
(A) Extension test (B) Retraction test |
- Place the machine on level ground.
- Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).
- Empty the bucket.
- Fully retract the bucket cylinder and fully retract the stick cylinder. Refer to Illustration 1.
- Position the bucket on the ground. With a stopwatch, measure the time that is required to extend the boom cylinder to full extension.
Note: Do not include the time of the snubber operation of the boom cylinder.
- Position the boom cylinders at full extension. With a stopwatch, measure the time that is required for the bucket to come in contact with the ground.
- Refer to the specifications in Table 2 for the operating speed of the boom cylinders.
Stick Cylinder
- Start the engine.
Show/hide table
Illustration 2 | g01187149 |
(A) Extension test (B) Retraction test |
- Place the machine on level ground.
- Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).
- Empty the bucket.
- Position the upper surface of the boom parallel to the ground.
- Fully extend the bucket cylinder. Refer to Illustration 2.
- Fully retract the stick cylinder. With a stopwatch, measure the time that is required to extend the stick cylinder to full extension.
- Fully extend the stick cylinder. With a stopwatch, measure the time that is required to retract the stick cylinder to full retraction.
Note: Do not include the time of the snubber operation of the stick cylinders.
- Refer to the specifications in Table 2 for the operating speed of the stick cylinder.
Bucket Cylinder
- Start the engine.
Show/hide table
Illustration 3 | g01187147 |
(A) Extension test (B) Retraction test |
- Place the machine on level ground.
- Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).
- Empty the bucket.
- Position the upper surface of the boom parallel to the ground.
- Position the stick so that the stick is perpendicular to the ground. Refer to Illustration 3.
- Fully retract the bucket cylinder. With a stopwatch, measure the time that is required to extend the bucket cylinder to full extension.
- Fully extend the bucket cylinder. With a stopwatch, measure the time that is required to retract the bucket cylinder to full retraction.
- Refer to the specifications in Table 2 for the operating speed of the bucket cylinder.
Blade Cylinder
- Start the engine.
Show/hide table
Illustration 4 | g01187145 |
(A) Extension test (B) Retraction test |
- Place the machine on level ground.
- Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).
- Position the stick so that the stick is perpendicular to the ground.
- Lower the stick to the ground. Refer to Illustration 4.
- Fully retract the blade cylinder. With a stopwatch, measure the time that is required to lower the blade to the ground.
- Position the blade on the ground. With a stopwatch, measure the time that is required to retract the blade cylinder to full retraction.
- Refer to the specifications in Table 2 for the operating speed of the blade cylinder.
Boom Swing Cylinder
- Start the engine.
Show/hide table
Illustration 5 | g01187054 |
View from top of machine (A) Extension test (B) Retraction test |
- Place the machine on level ground.
- Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).
- Position the stick so that the stick is perpendicular to the ground.
- Fully retract the boom swing cylinder. With a stopwatch, measure the time that is required to extend the boom swing cylinder to full extension.
- Position the boom swing against the swing stop. With a stopwatch, measure the time that is required to retract the boom swing cylinder to full retraction.
- Refer to the specifications in Table 2 for the operating speed of the boom swing cylinder.
Specifications
Show/hide table
Cylinder Operating Speed     | |||
---|---|---|---|
Item     | Specification     | ||
304C CR | 305C CR | ||
Boom     | Extension     | 2.6 ± 0.4 sec     | 2.8 ± 0.4 sec     |
Retraction | 2.7 ± 0.4 sec     | 2.5 ± 0.4 sec     | |
Stick     | Extension     | 3.2 ± 0.4 sec     | 3.4 ± 0.4 sec     |
Retraction | 2.6 ± 0.4 sec     | 2.9 ± 0.4 sec     | |
Bucket     | Extension     | 3.1 ± 0.4 sec     | 3.1 ± 0.4 sec     |
Retraction | 2.0 ± 0.4 sec     | 2.0 ± 0.4 sec     | |
Blade     | Extension     | 1.1 ± 0.2 sec     | 1.0 ± 0.2 sec     |
Retraction | 1.0 ± 0.2 sec     | 1.0 ± 0.2 sec     | |
Boom Swing (with stop)     |
Extension     | 5.3 ± 0.4 sec     | 5.5 ± 0.4 sec     |
Retraction | 5.4 ± 0.4 sec     | 5.5 ± 0.4 sec     | |
Boom Swing (without stop)     |
Extension     | 5.8 ± 0.4 sec     | 6.0 ± 0.4 sec     |
Retraction | 5.9 ± 0.4 sec     | 6.0 ± 0.4 sec     |
Caterpillar Information System:
3516B Off-Highway Trucks Pulse Width Modulated Sensor
304C CR and 305C CR Mini Hydraulic Excavators Hydraulic System Swing Speed and Swing Drift on a Slope - Check
304C CR and 305C CR Mini Hydraulic Excavators Hydraulic System Swing Speed and Overswing on Level Ground - Check
304C CR and 305C CR Mini Hydraulic Excavators Hydraulic System Cylinder Drift - Check
303C CR and 303.5C CR Mini Hydraulic Excavators Hydraulic System Machine Drift on a Slope - Check
304C CR and 305C CR Mini Hydraulic Excavators Hydraulic System Travel on Level Ground - Test
304C CR and 305C CR Mini Hydraulic Excavators Hydraulic System Engine Performance - Test - Engine Speed
303C CR and 303.5C CR Mini Hydraulic Excavators Hydraulic System Main Hydraulic Pump Air - Purge
C15 and C18 Engines for Caterpillar Built Machines Belt Tensioner
345C Excavator and 345C MHPU Mobile Hydraulic Power Unit Machine Systems Track - Connect - Non-PPR2
C15 and C18 Engines for Caterpillar Built Machines Belt Tensioner
3516B Off-Highway Trucks Prelubrication System
305E CR and 305.5E CR Mini Hydraulic Excavators Hydraulic System Relief Valve (Pilot) - Test and Adjust
305E CR and 305.5E CR Mini Hydraulic Excavators Hydraulic System Relief Valve (Main) - Test and Adjust
305E CR and 305.5E CR Mini Hydraulic Excavators Hydraulic System Relief Valve (Line) - Test and Adjust
304C CR and 305C CR Mini Hydraulic Excavators Hydraulic System Relief Valve (Swing) - Test and Adjust
304C CR and 305C CR Mini Hydraulic Excavators Hydraulic System Specifications
3500 and 3500B High Displacement Engines for Caterpillar Built Machines Engine Oil Scavenge Pump - Remove
330D, 336D, 336D2, 340D and 340D2 Excavators and 336D MHPU Mobile Hydraulic Power Unit Machine Systems Pilot Valve (Joystick) - Disassemble
M325D MH Material Handler Air Conditioning and Heating Control
PP120 and PH126 Power Pack and Hammer Hydraulic Hand Control - Disassemble
PP120 and PH126 Power Pack and Hammer Hydraulic Hand Control - Assemble
320D RR Excavator and 320D RR Forest Machine Hydraulic System Operational Checks
320D and 323D Excavators Hydraulic System Travel on Level Ground - Test