Assembly Procedure
Show/hide table
Table 1
Required Tools     |
Tool     |
Part Number     |
Part Description     |
Qty     |
(A)     |
1P-2420     |
Repair Stand     |
1     |
(B)     |
9S-7338     |
Crossblock     |
1     |
3H-0465 |
Push-Puller Plate     |
2     |
154-9326 |
Spring Compressor Plate     |
1     |
154-9323 |
Spacer     |
2     |
(C)     |
5P-4758     |
Internal Pliers     |
1     |
(D)     |
138-7575     |
Link Bracket     |
2     |
(E)     |
161-4350     |
Duo-cone Seal Kit     |
1     |
(F)     |
199-4925     |
Socket (1)     |
1     |
165-1670 |
Socket     |
1     |
165-1671 |
Reaction Shaft     |
1     |
132-8119 |
Torque Wrench     |
1     |
132-8223 |
110 V Power Pack     |
1     |
132-8231 |
220 V Power Pack     |
1     |
(G)     |
6V-3075     |
Dial Indicator     |
1     |
6V-6167 |
Contact Point     |
1     |
3P-1565 |
Collet Clamp     |
1     |
165-8958 |
Plastic Base for Indicator     |
1     |
(H)     |
165-3977     |
Punch     |
1     |
(J)     |
155-1709     |
Hydraulic Test Adapter     |
1     |
3J-1907 |
O-ring Seal     |
1     |
6V-3965 |
Nipple Assembly     |
1     |
6V-4143 |
Coupler Assembly     |
2     |
6V-3014 |
Hose Assembly     |
1     |
8T-0855 |
Pressure Gauge     |
1     |
1U-5230 |
Hand Pump     |
1     |
5S-2403 |
Fitting     |
1     |
1S-8937 |
Valve     |
1     |
2D-7325 |
Tee     |
1     |
6V-3966 |
Nipple Assembly     |
1     |
Show/hide table
( 1 ) | Use this wrench for the newer shaft nut that has four slots. |
Note: Make sure that all of the parts of the final drive and the travel motor are thoroughly clean and free of dirt and debris prior to assembly. Replace all O-ring seals that are used in the final drive with new O-ring seals. Reassemble the final drive and the travel motor on Tooling (A) .
Show/hide table
|
|
|
Illustration 1 | g00581889 |
Show/hide table
|
|
|
Illustration 2 | g00528800 |
- Use Tooling (E) to install one half of Duo-cone seal kit (37) into spindle (30). Refer to Disassembly and Assembly, "Duo-Cone Conventional Seals - Install" in this manual.
- Put a mark (40) on spindle (30). The mark indicates the position of the original balls (33). The mark is used in Step 18.
Show/hide table
|
|
|
Illustration 3 | g00581916 |
- Use Tooling (G) to check assembled height (X) in at least four places at 90 degree intervals. The difference in height around the ring must not be more than 1.0 mm (.04 inch).
Show/hide table
|
|
|
Illustration 4 | g00528793 |
- Install bearing kit (38) into ring gear (36) .
Note: Check the condition of the bearing kit. If the bearing kit is worn or damaged, use a new bearing kit.
Show/hide table
|
|
|
Illustration 5 | g00528781 |
- Use Tooling (E) to install the second one half of Duo-cone seal kit (37) into ring gear (36). Refer to Disassembly and Assembly, "Duo-Cone Conventional Seals - Install" in this manual.
- Repeat step 3.
Show/hide table
|
|
|
Illustration 6 | g00528772 |
- Install spindle (30) onto Tooling (A) .
Note: Turn over ring gear (36) very carefully. Make sure that Duo-cone seal kit (37) is not dislodged.
- Install ring gear (36) onto spindle (30) .
Show/hide table
|
|
|
Illustration 7 | g00530753 |
- Install bearing kit (35) onto spindle (30) .
Show/hide table
|
|
|
Illustration 8 | g00527917 |
- Install the reaction shaft from Tooling (F) on spindle (30), as shown.
Show/hide table
|
|
|
Illustration 9 | g00527930 |
Note: Lubricate the threads with oil before installation. Use caution. The threads are easy to cross thread.
- Install spindle nut (34) onto spindle (30) .
- Install the socket from Tooling (F) on spindle nut (34) .
Note: Rotate the spindle in one direction during the tightening procedure in order to seat the bearings properly.
- Use Tooling (F) to tighten spindle nut (34) to a torque of 1500 N·m (1100 lb ft).
- Mark spindle nut (34) in relation to spindle (30) .
Note: Do not confuse this mark with mark (40) for the location of balls (33) .
- Tighten spindle nut (34) to a torque of 2500 N·m (1840 lb ft).
- Loosen spindle nut (34) so that the mark on the spindle nut is 5 to 10 degrees from the mark on the spindle.
- Tighten spindle nut (34) to a torque of 1500 N·m (1100 lb ft).
Show/hide table
|
|
|
Illustration 10 | g00530793 |
- Measure the distance from the new bolt (31) to mark (40). The distance must be at least 10 mm (.4 inch). If the distance is less than 10 mm (.4 inch), use a new spindle nut (34) .
Show/hide table
|
|
|
Illustration 11 | g00581917 |
- Use Tooling (H) to peen the threads of spindle (30) .
Show/hide table
|
|
|
Illustration 12 | g00528079 |
- Install bolt (31), tab (32) and ball (33) into spindle nut (34). Tighten bolt (31) to a torque of 8.5 N·m (6 lb ft).
Note: Use the access hole in ring gear (35) to install bolt (31). Ring gear (35) can be rotated in order to align the access hole with bolt (31) .
Note: Bend the long tab on tab (32) over the "ear" of ring gear (35). Bend the short tab of tab (32) over bolt (31) .
- Repeat step 19 and step 20 in order to install the remaining bolt assembly.
Show/hide table
|
|
|
Illustration 13 | g00527656 |
- If necessary, heat gears (29) to 135 °C (275 °F). Install gears (29) on spindle (30). Use snap ring pliers to install snap ring (28) that secures planetary gear (29) to spindle (30) .
Show/hide table
|
|
|
Illustration 14 | g00527629 |
- Install sun gear (27) into planetary carrier (25) .
Show/hide table
|
|
|
Illustration 15 | g00527625 |
- Use snap ring pliers to install snap ring (26) on sun gear (27) .
Show/hide table
|
|
|
Illustration 16 | g00527613 |
- If necessary, heat planetary gears (24) to 135 °C (275 °F). Install the disks and planetary gears (24) onto the planetary carrier.
- Use snap ring pliers to install snap rings (23) onto planetary gears (24) .
Show/hide table
|
|
|
Illustration 17 | g00527606 |
- Install the second stage of the planetary gear assembly (22) into final drive.
Show/hide table
|
|
|
Illustration 18 | g00527597 |
- Install sun gear (21) into planetary carrier (19) .
Show/hide table
|
|
|
Illustration 19 | g00527501 |
- If necessary, heat planetary gears (18) to 135 °C (275 °F). Install three planetary gears (18) on the planetary carrier. Use snap ring pliers to install three snap rings (17) that secure three planetary gears (18) to the planetary carrier.
Show/hide table
|
|
|
Illustration 20 | g00527500 |
- Install the first stage of planetary gear assembly (16) into the final drive.
Show/hide table
|
|
|
Illustration 21 | g00527496 |
- Install sun gear shaft (15) into the final drive.
Show/hide table
|
|
|
Illustration 22 | g00527492 |
- Install a new O-ring seal into cover (14). Install twelve bolts (13) that secure cover (14) to the final drive. Tighten twelve bolts (13) to a torque of 25 ± 6 N·m (18 ± 4 lb ft).
- Use lifting straps and Tooling (D) in order to lift the final drive off Tooling (A) .
- Carefully rotate the final drive so that the brake is up.
- Fasten the final drive to Tooling (A) .
Show/hide table
|
|
|
Illustration 23 | g00527410 |
- Install seals (12) into piston (5) .
Show/hide table
|
|
|
Illustration 24 | g00527398 |
- Install seal (10) into spindle (11) .
- Use Tooling (C) to install snap ring (9) .
Show/hide table
|
|
|
Illustration 25 | g00527404 |
- Install supporting ring (8) .
Show/hide table
|
|
|
Illustration 26 | g00527355 |
- Install brake disks and plates (7) .
Note: There are six disks and five plates. Start the installation with a disk. Alternate between disks and plates. End the installation with a disk.
Show/hide table
|
|
|
Illustration 27 | g00527353 |
- Install shaft link (6) .
Show/hide table
|
|
|
Illustration 28 | g00527337 |
Note: Lubricate the seals before installing the piston. Install the piston carefully in order to prevent damage to the seals.
- Install piston (5) .
Show/hide table
|
|
|
Illustration 29 | g00527299 |
- Install spacer ring (3) and twenty springs (4) .
Show/hide table
|
|
|
Illustration 30 | g00527283 |
- Use Tooling (B) to compress the brake assembly. Use Tooling (C) to install the retaining ring.
Show/hide table
|
|
|
Illustration 31 | g00530949 |
Tooling (J) (1) Hydraulic test adapter
(2) O-ring seal
(3) Nipple assembly
(4) Coupler assembly
(5) Hose assembly
(6) Pressure gauge
(7) Hand pump
(8) Fitting
(9) Valve
(10) Tee
(11) Nipple assembly
|
Show/hide table
|
|
|
Illustration 32 | g00530964 |
- Install Tooling (J) into the oil supply port (42) .
- Apply 3495 kPa (510 psi) for a minimum of 3 minutes. If the pressure falls, the piston seals must be checked.
Show/hide table
|
|
|
Illustration 33 | g00526930 |
- Install the travel motor on the final drive. Install two bolts (2) .
- Fill the final drive with hydraulic oil. The capacity of the final drive is 2.5 L ( .66 US gal). Refer to Operation and Maintenance Manual, "Lubricant Viscosities and Refill Capacities" for the correct filling procedure and the correct level for the final drive.
End By:
Install the final drive. Refer to Disassembly and Assembly, "Final Drive - Install" in this manual.