This Field Assembly Manual contains the assembly and installation procedures that is required to assemble the 994K Wheel Loader (S/N: MRK1-Up).
Refer to Special Instruction, REHS8985, "Commissioning Procedure for the 994K Wheel Loader" to perform the commissioning procedures.
After the 994K Wheel Loader has been assembled, refer to Operation and Maintenance Manual, SEBU9196 for the recommended fluids, correct filling procedures, and correct system fluid level checks.
Do not attempt to assemble this machine until you read and you understand the assembly instructions. Improper assembly procedures could result in injury or death. |
Personal injury or death can result from improper lifting or blocking. When a hoist or jack is used to lift any part or component, stand clear of the area. Be sure the hoist or jack has the correct capacity to lift a component. Install blocks or stands before performance of any work under a heavy component. Approximate weights of the components are shown. Clean all surfaces where parts are to be installed. |
NOTICE |
---|
Do not allow any dirt or foreign material to get into the hydraulic system during assembly, connection of lines, when components are filled with fluid, or during any maintenance operation. |
Do not perform any procedures in this publication or order any parts until you understand the information that is contained in this publication.