- Off-Highway Truck/Tractor:
- 773F (S/N: EED1-UP)
- Quarry Truck:
- 775F (S/N: DLS1-UP)
- 777F (S/N: JRP1-UP)
If machines were assembled in cold conditions at −10 °C (14 °F) or below, inspect the mounts in four places under the cab for proper installation torque. If the mounts are not seated properly or the torque is low, replace the hardware and mounts and torque to proper specification. The mounts should be kept at −10 °C (14 °F) or above for at least 24 hours before installation.
Note: All future 773F, 775F, and 777F Off Highway Trucks assembled in temperatures below −10 °C (14 °F) should follow the above practice.
ReferenceDisassembly and Assembly, RENR8286, "773F and 775F Off-Highway Trucks Machine Systems", "Cab - Install".
ReferenceDisassembly and Assembly, RENR8311, "777F Off-Highway Trucks/Tractor", "Cab - Install".
ReferenceSpecial Instruction, REHS2594, "Assembly Procedure for 777F Off-Highway Trucks".