Required Tools | |||
---|---|---|---|
Tool | Part Number | Part Description | Qty |
A | 1P-0520 | Driver Group | 1 |
Note: Cleanliness is an important factor. Before assembly, thoroughly clean all parts in cleaning fluid. Allow the parts to air dry. Do not use wiping cloths or rags to dry parts. Lint may be deposited on the parts which may cause trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement. Dirt and other contaminants can damage the precision component. Perform assembly procedures on a clean work surface. Keep components covered and protected at all times.
- Lower the temperature of bearing (37) (not shown). Use Tooling (A) to install sleeve bearing (37) to spider assembly (35). Sleeve bearing (37) must be even with the outside surface of spider assembly (35).
Note: Lubricate the bore of bearing (37) with the lubricant that is being sealed.
Show/hide tableIllustration 2 g01059492 - Install spider assembly (35) to housing (15).
- Install bolts (34). Tighten bolts (34) evenly to a torque of
120 ± 15 N·m (90 ± 11 lb ft) .Show/hide tableIllustration 3 g01059493 Note: Lubricate bearing (33) with the lubricant that is being sealed.
- Install two thrust bearing races (32) and thrust bearing (33) to housing (15).
Show/hide table
Illustration 4 g01054587 - Install retaining ring (31) to hub (28).
Show/hide table
Illustration 5 g01059756 - Install turbine (27) to hub (28).
- Install bolt retainer (30) to turbine (27).
- Install the bolts from the opposite side of hub (28) to bolt retainer (30). Tighten the bolts evenly to a torque of
50 ± 7 N·m (37 ± 5 lb ft) .Show/hide tableIllustration 6 g01054582 - Install hub (28) and turbine (27) as a unit to housing (15).
Show/hide table
Illustration 7 g01059765 - Check the clearance between the turbine and the housing. For new components the clearance dimension (U) across the diameter must be
2.67 ± 0.38 mm (0.105 ± 0.015 inch) . For worn components the maximum permissible clearance across the diameter is4.001 mm (0.1575 inch) .Show/hide tableIllustration 8 g01059798 Note: Lubricate bearing (26) with the lubricant that is being sealed.
- Install two thrust bearing races (25) and thrust bearing (26) to the hub.
Show/hide table
Illustration 9 g01059800 - Use Tooling (A) to install sleeve bearing (24) (not shown) to carrier assembly (20). Bearing sleeve (24) must be even with the counterbore of carrier assembly (20).
Note: Lubricate the bore of bearing (24) with the lubricant that is being sealed.
Show/hide tableIllustration 10 g01054579 - Install retainer ring (23) to stator (22).
Show/hide table
Illustration 11 g01059803 - Position carrier assembly (20) on a wood block.
- Raise the temperature of stator (22). Install stator (22) to carrier assembly (20).
Show/hide table
Illustration 12 g01059804 - Install snap ring (21) to stator (22).
Show/hide table
Illustration 13 g01059806 - Install stator (22) and carrier assembly (20) to housing (15).
Show/hide table
Illustration 14 g01059807 - Check the clearance between the stator and the turbine. For new components, the clearance dimension (V) must be
0.81 ± 0.10 mm (0.032 ± 0.004 inch) . For worn components the maximum permissible clearance across the diameter is1.22 mm (0.048 inch) .Show/hide tableIllustration 15 g01059808 Note: Lubricate bearing (19) with the lubricant that is being sealed.
- Install two thrust bearing races (18) and thrust bearing (19) to the carrier assembly.
Show/hide table
Illustration 16 g01059816 - Install impeller (13) and hub (16) to drive flange (17).
- Install the bolts through hub (16) to the drive flange. Tighten the bolts evenly to a torque of
50 ± 7 N·m (37 ± 5 lb ft) .Show/hide tableIllustration 17 g01059813 - Check the clearance between the impeller and the stator. For new components the clearance, dimension (W) must be
0.81 ± 0.10 mm (0.032 ± 0.004 inch) . For worn components the maximum permissible clearance across the diameter is1.22 mm (0.048 inch) .Show/hide tableIllustration 18 g01059817 - Install impeller (13) to housing (15).
Show/hide table
Illustration 19 g01054150 - Install 36 bolts (12) and the washers. Tighten the bolts evenly to a torque of
50 ± 7 N·m (37 ± 5 lb ft) .Show/hide tableIllustration 20 g01059819 - Install retaining ring (10) to drive gear (9).
Show/hide table
Illustration 21 g01059820 - Lower the temperature of outer bearing race (11).
- Install outer bearing race (11) to drive gear (9). Make sure that outer bearing race (11) makes contact with retaining ring (10).
Show/hide table
Illustration 22 g01054148 - Install drive gear (9) to the drive flange.
- Install bolts (8). Tighten bolts (8) to a torque of
50 ± 7 N·m (37 ± 5 lb ft) .Show/hide tableIllustration 23 g01059821 - Raise the temperature of inner bearing (7). Install inner bearing (7) to bearing carrier (1).
Note: Lubricate bearing (7) with clean transmission oil.
Show/hide tableIllustration 24 g01059823 - Install retaining ring (6) to bearing carrier (1).
- Raise the temperature of ring carrier (5). Install ring carrier (5) to bearing carrier (1).
Show/hide table
Illustration 25 g01054143 - Install seal ring (4) to ring carrier (5).
- Install O-ring seal (3) to bearing carrier (1).
Show/hide table
Illustration 26 g01059825 - Check the clearance between the impeller hub and the bearing carrier. The clearance, dimension must be
0.20 ± 0.05 mm (0.008 ± 0.002 inch) .Show/hide tableIllustration 27 g01059824 - Install bearing carrier (1) to carrier assembly (20).
- Install retaining ring (2) to carrier assembly (20).
Illustration 1 | g01059489 |
End By:
- Connect the torque converter to the updrive gears. Refer to Disassembly and Assembly, "Updrive Gears - Assemble".