Removal Procedure
Show/hide table
Table 1
Required Tools     |
Tool     |
Part Number     |
Part Description     |
Qty     |
A     |
140-7742     |
Sleeve     |
2     |
ZZ     |
6V-9507     |
Face Seal Plug     |
4     |
6V-9828 |
Cap As     |
4     |
Start By:
- Release the hydraulic system pressure. Refer to Disassembly and Assembly, "Hydraulic System Pressure - Release".
Note: SERVICE DATA: TOOLING (ZZ) WILL NOT BE IDENTIFIED IN PHOTOGRAPHS IN THE REMOVAL OR THE INSTALLATION. THIS TOOLING IS SHOWN IN ORDER TO ASSIST THE EXPERIENCED SERVICEMAN.
Show/hide table
|
Personal injury can result from hydraulic oil pressure and hot oil. Hydraulic oil pressure can remain in the hydraulic system after the engine has been stopped. Serious injury can be caused if this pressure is not released before any service is done on the hydraulic system. Make sure all of the work tools have been lowered to the ground, and the oil is cool before removing any components or lines. Remove the oil filler cap only when the engine is stopped, and the filler cap is cool enough to touch with your bare hand. |
|
Show/hide table
|
NOTICE |
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop Products Guide" for tools and supplies suitable to collect and contain fluids on Caterpillar products. Dispose of all fluids according to local regulations and mandates. |
|
Note: Cleanliness is an important factor. Before you begin the disassembly procedure, the exterior of the components should be thoroughly cleaned. This will help to prevent dirt from entering the internal mechanism. Precision components can be damaged by contaminants or by dirt. Perform disassembly procedures on a clean work surface. Keep components covered and protected at all times.
Note: Put identification marks on all hoses, on all hose assemblies, on all wires, and on all tube assemblies for installation purposes. Plug all hose assemblies and all tube assemblies. This helps to prevent fluid loss, and this helps to keep contaminants from entering the system.
- Remove the work tool. Refer to Operation and Maintenance Manual, "Work Tool Coupler Operation".
Show/hide table
|
|
|
Illustration 1 | g01030155 |
- Disconnect hose assemblies (1) .
Show/hide table
|
|
|
Illustration 2 | g01030156 |
- Position the quick coupler on blocks, as shown. Remove bolts (2) and guard (3) .
Show/hide table
|
|
|
Illustration 3 | g01030159 |
- Remove bolts (4) and bolt (5). Reposition the hose assemblies out of the way.
Show/hide table
|
|
|
Illustration 4 | g01030161 |
- Attach Tooling (A) and a suitable lifting device to quick coupler (6). The weight of the quick coupler is approximately 98 kg (215 lb).
Show/hide table
|
|
|
Illustration 5 | g01030162 |
- Remove bolt (8) and pin assembly (7) .
Show/hide table
|
|
|
Illustration 6 | g01030163 |
- Remove bolt (10) and pin assembly (9) .
- Repeat Step 6 and Step 7 for the other side.
- Use the suitable lifting device to remove quick coupler (6). The weight of quick coupler (6) is approximately 98 kg (215 lb).
Installation Procedure
Show/hide table
Table 2
Required Tools     |
Tool     |
Part Number     |
Part Description     |
Qty     |
A     |
140-7742     |
Sleeve     |
2     |
B     |
5P-0960     |
Molybdenum Grease     |
1     |
Note: The pins, the bores, and the bearings must be clean before assembling.
- Apply Tooling (B) in order to lubricate the pins, the bores, and the bearings before assembling.
Show/hide table
|
|
|
Illustration 7 | g01030163 |
- Attach Tooling (A) and a suitable lifting device to quick coupler (6). The weight of quick coupler (6) is approximately 98 kg (215 lb). Position quick coupler (6). Use blocks to support the quick coupler.
- Install pin assembly (9) and bolt (10) .
Show/hide table
|
|
|
Illustration 8 | g01030162 |
- Install pin assembly (7) and bolt (8) .
- Repeat Step 3 and Step 4 for the other side.
- Remove the suitable lifting device and Tooling (A) .
Show/hide table
|
|
|
Illustration 9 | g01030159 |
- Reposition the hose assemblies and install bolts (4) and bolts (5) .
Show/hide table
|
|
|
Illustration 10 | g01030156 |
- Install guard (3) and bolts (2) .
Show/hide table
|
|
|
Illustration 11 | g01030155 |
- Connect hose assemblies (1) .
- Install the work tool. Refer to Operation and Maintenance Manual, "Work Tool Coupler Operation".