Swing Speed and Overswing on Level Ground - Check
Measuring the swing speed and the overswing of the machine will determine if there is a need to check the swing motor.
Note: The engine speed and/or the machine configuration that is used during this test can affect the results of this test. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for the engine speed that was used for this test.
Note: The relief valve pressure settings must be set to the relief valve pressure specification before performing this operational check. Refer to Testing and Adjusting, "Specifications".
Show/hide table
Required Tools     | |
---|---|
Description     | Qty     |
Tape Measure     | 1     |
Stopwatch     | 1     |
Show/hide table
Illustration 1 | g00816368 |
- Position the machine on level ground. Refer to Illustration 1.
- Fully retract the stick cylinder and fully extend the bucket cylinder.
- Stop the engine.
- To indicate the relationship of the two positions, put a mark (C) on the inner race and the outer race of the swing bearing. The mark will be used as a target to stop the swing operation. Refer to Illustration 2.
Show/hide table
Illustration 2 | g00293972 |
(A) Upper frame (B) Undercarriage frame (C) Marking |
- Start the engine.
- Place the engine speed dial in the HIGH IDLE position.
- Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).
- Load the bucket.
Weight of bucket load ... 105 kg (231.5 lb)
- Move the swing joystick in either direction until the machine completes a 90 degree swing operation away from the target.
- Move the swing joystick in the opposite direction until the machine completes a 90 degree swing operation toward the target. Return the swing joystick to the NEUTRAL position at the target.
- Measure the amount of overswing by measuring the distance between the marks on the swing bearing. Refer to Illustration 2.
Note: Use a point that is visible from the operator seat as a reference point for the target.
Show/hide tableTable 2 Overswing     Item     Specification     Right Swing    
190 mm (7.5 inch) or less    Left Swing    
- Empty the bucket and reposition the machine according to Illustration 1.
- Move the swing joystick in each direction and measure the time that is required to complete a 90 degree swing operation.
Move the swing joystick in each direction and measure the time that is required to complete three revolutions.
Show/hide tableTable 3 Swing Time (1)     Item     Specification     Right Swing (90°)     2.0 sec or less     Left Swing (90°)     Continuous swing right (three revolutions) (2)     18.0 to 22 sec or less     Continuous swing left (three revolutions) (2)     Show/hide table( 1 ) Empty bucket ( 2 ) Start the measurement after the machine has rotated one full revolution.
Caterpillar Information System:
302.5C Mini Hydraulic Excavator Hydraulic System Relief Valve (Line) - Test and Adjust
302.5C Mini Hydraulic Excavator Hydraulic System Specifications
302.5C Mini Hydraulic Excavator Hydraulic System Relief Valve (Main) - Test and Adjust
302.5C Mini Hydraulic Excavator Hydraulic System Relief Valve (Swing) - Test and Adjust
302.5C Mini Hydraulic Excavator Hydraulic System Relief Valve (Pilot) - Test and Adjust
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power Unit Machine Systems Hydraulic Lockout Control - Assemble
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power Unit Machine Systems Hydraulic Lockout Control - Disassemble
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power Unit Machine Systems Hydraulic Lockout Control - Install
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power Unit Machine Systems Hydraulic Lockout Control - Remove
365C Excavator Machine Systems Window Wiper Motor - Remove and Install
390D Excavator Machine Systems Storage Box and Covers (Cab) - Remove and Install
2005/08/15 Intake Valves are Sticking in Cold Climates {1100, 1105, 7620}
302.5C Mini Hydraulic Excavator Hydraulic System Operational Checks
302.5C Mini Hydraulic Excavator Hydraulic System Main Hydraulic Pump Air - Purge
302.5C Mini Hydraulic Excavator Hydraulic System Machine Drift on a Slope - Check
302.5C Mini Hydraulic Excavator Hydraulic System Swing Speed and Swing Drift on a Slope - Check
303C CR and 303.5C CR Mini Hydraulic Excavators Hydraulic System Hydraulic System Pressure - Release
303C CR and 303.5C CR Mini Hydraulic Excavators Hydraulic System General Testing and Adjusting Information
302.5C Mini Hydraulic Excavator Hydraulic System Engine Performance - Test - Engine Speed
302.5C Mini Hydraulic Excavator Hydraulic System Travel on Level Ground - Test
302.5C Mini Hydraulic Excavator Hydraulic System Cylinder Speed - Check
303.5E2 CR, 304E2 CR, 305E2 CR and 305.5E2 CR Mini Hydraulic Excavators Machine System Visual Inspection
302.5C Mini Hydraulic Excavator Hydraulic System Cylinder Drift - Check
303C CR and 303.5C CR Mini Hydraulic Excavators Hydraulic System Accumulator (Pilot) - Test and Charge