Disassembly Procedure
Required Tools     | |||
Tool     | Part Number     | Part Description     | Qty     |
A     | 1P-0510     | Driver Group     | 1     |
Start By:
- Remove the metering pump (steering). Refer to Disassembly and Assembly, "Metering Pump (Steering) - Remove" for the correct procedure.
NOTICE |
---|
Be certain that all the parts of the metering pump are clean and there is no dirt and debris. Do not use cloth or paper towels to dry parts. Lint or other material can get into the hydraulic system. This can cause damage to the components. Replace any parts that have scratches or burns which could result in leaks. |
- Position metering pump (1) on a suitable work bench.
Note: Mark the components for assembly purposes. Pay attention to the disassembly procedure for the correct orientation of the components during the assembly procedure.
Note: Do not place the metering pump into a vise. A vise could damage the metering pump.
Illustration 1 | g00390333 |
NOTICE |
---|
Failure to follow the recommended procedure or the specified tooling that is required for the procedure could result in damage to components. To avoid component damage, follow the recommended procedure using the recommended tools. |
- Remove six bolts (2) and six washers (3). Remove one bolt (4) and one washer (5) in order to separate the body from the pump.
- Remove cover (7) and O-ring seal (13) from the metering pump.
Note: There is a roll pin that is pressed into the bottom of bolt (4). This roll pin prevents ball (12) from entering the passage that is indicated by the arrow.
Note: When the bolts are installed, the bolts should be tightened to a torque of 30 ± 5 N·m (22.1 ± 3.7 lb ft).
Illustration 2 | g00390398 |
- Remove gerotor housing (6) .
- Remove O-ring seal (14) .
- Remove gerotor (8) and ground drive control (10) .
- Remove spacer plate (11) .
- Remove ball (12) .
- Remove O-ring seal (15) from body (9) .
Note: During assembly, be careful so that ball (12) does not fall out of the hole that is indicated by the arrow. Special bolt (4) contains the ball after the ball is installed.
- Remove control sleeve (16). Remove spacer (17), thrust washer (18), and spacer (19) from control sleeve (16) and gerotor body (9) .
Note: Pay attention to the order of disassembly. Pay attention to the mating faces of spacer (17), thrust washer (18), and spacer (19) .
Illustration 3 | g00390399 |
Illustration 4 | g00390402 |
- Remove ring (21) .
Illustration 5 | g00390492 |
- Remove pin (22) .
- Separate control sleeve (16) from spool (20) .
Illustration 6 | g00390493 |
Note: When the pin is installed, align the pin in the metering body and the gerotor assembly, as shown above.
Note: The alignment marks at points (X) and (Y) are for installation purposes.
- Remove four springs (23) .
Note: During removal, be certain that you do not bind spool (20) in control sleeve (16). Rotate the control sleeve while the control sleeve is being removed from the spool.
Note: For installation purposes, pay close attention to the orientation of the springs.
- Remove seal (24) from gerotor body (9), if necessary. Use Tool (A) to install seal (24), if the seal was replaced.
Illustration 7 | g00390512 |