950G Wheel Loader, 962G Wheel Loader and IT62G Integrated Toolcarrier Power Train Caterpillar


Differential Backlash and Bearings - Adjust

Usage:

950G 2JS



Illustration 1g00303284

Differential and Bevel Gear

(1) Bearing sleeve. (2) Bearing cup. (3) Bearing cone. (4) Adjusting nut. (5) Bolt. (6) Bevel pinion. (7) Bearing cone. (8) Bearing cup. (9) Housing. (10) Bearing cup. (11) Bearing cone. (12) Washer. (13) Nut. (14) Intermediate housing. (15) Differential group. (16) Bevel gear. (17) Bolt. (18) Bearing sleeve. (19) Bolt. (20) Adjusting nut. (21) Differential case. (22) Bearing cone. (23) Bearing cup. (24) Pins. (25) Pin. (26) Pin. (27) Center housing. (28) Shims. (A) Bolt circle radius.

Note: The following procedure controls bearing preload. The procedure provides the same results for new bearings and for used bearings.

  1. Assemble differential group (15) .

  1. Heat bevel gear (16) to 135°C (275°F) for a maximum of four hours. Install the bevel gear on the differential group.

  1. Install four large pins (25) partially into bevel gear (16). Install four small pins (26) into large pins (25). Make sure that the serrations of the small pins are 180 degrees from the serrations of the large pins. Press pins (25) and (26) so that the pins are flush with the surface of bevel gear (16). Torque the 20 9X-6493 Bolts (17) to 95 ± 10 N·m (70 ± 7 lb ft) and then turn the bolts for an additional 180 ± 5° turn. Make sure that the bevel gear is seated on the differential group shoulder.

    Note: Bolts (17) cannot be substituted with other bolts. If bolts (17) are replaced, new 9X-6493 Bolts must be installed.

  1. Press bearing cone (3) and bearing cone (22) on differential case (21). Make sure that the bearing cones are fully seated.

    Note: If you freeze the bearing cups, allow the parts to reach a uniform temperature. Then use a driver or a press to reset the bearing cups. The limit for freezing the bearing cups is -29°C (-20°F). Remove any frost and wipe the bearing cups dry. Lubricate the bearing cups with SAE 30W gear oil in order to prevent rust on the bearing cups.

    Note: If you heat the bearing cones, allow the parts to reach a uniform temperature. Then use a driver or a press to reset the bearing cones. The limit for heating the bearing cones is a maximum of 135°C (275°F) for a maximum of four hours. Lubricate the bearing cones with SAE 30W gear oil after the bearing cones have cooled in order to prevent rust on the bearing cones.

  1. Remove intermediate housing (14) from center housing (27) .

  1. Install bearing cups (2) and (23), bearing sleeves (1) and (18), and two pins (24). Lubricate the threads of adjusting nuts (4) and (20) and install the nuts in intermediate housing (14) and in center housing (27) .

  1. Position center housing (27) in an appropriate supporting fixture so that the open side faces upward. With a lifting device, lower differential group (15) and bevel gear into position on three dowels in center housing (27) .

  1. Install intermediate housing (14) on center housing (27). Apply 1U-8846 Liquid Gasket to the contacting surfaces prior to assembly. Torque the four bolts to 100 ± 20 N·m (75 ± 15 lb ft).

  1. Lubricate the O-ring seal and install the O-ring seal on pinion housing (9). Install pinion housing (9) on center housing (27). To install the front differential, torque the 10 bolts to 300 ± 40 N·m (220 ± 30 lb ft). To install the rear differential, torque the 12 bolts to 300 ± 40 N·m (220 ± 30 lb ft). Use the original thickness of shims (28) or use a new shim pack that is measured to the same thickness as the original pack. If the original shim pack is not available, use 70% of a new shim pack.

    Note: The needed thickness of the shim pack may change when the tooth contact pattern is adjusted.

  1. Tighten adjusting nuts (4) and (20) to a position that maintains gear backlash and slight bearing end play. This position should not maintain tight gear mesh.

  1. Reposition center housing (27) in the supporting fixture so that center housing (27) and pinion housing (9) are horizontal. The parts are horizontal when the parts are mounted in the machine.

    Table 1
    Required Tools    
    Part Number     Description     Quantity    
    1U-6689     Socket Wrench Assembly     1    

  1. Measure the torque that is needed to rotate pinion shaft (6). Record this torque. For this measurement, use a 1U-6689 Socket Wrench Assembly on pinion shaft nut (13) .

  1. While you rotate pinion shaft (6) back and forth, tighten adjusting nut (20) to the zero backlash position. Then back off adjusting nut (20) by a value of 20° plus the increment to the nearest lock position.

  1. Tighten adjusting nut (4) at the same time while you rotate pinion shaft (6). Tighten nut (4) until the torque increases to 0.2 to 0.6 N·m (2.0 to 5.0 lb in) over the torque that was recorded in Step 12. This is the seated position.

  1. Tighten adjusting nut (4) by 70° plus the increment to the nearest lock position.

    Note: When you check for correct assembly and for correct adjustment, measure the rolling torque of the bevel gear group at the shaft of the pinion. For new bearings, the rolling torque should be 1.8 to 7.4 N·m (16 to 65 lb in). For used bearings, the rolling torque should be 0.9 to 3.7 N·m (8 to 33 lb in).

  1. Measure the backlash between bevel gear (16) and pinion shaft (6). Measure the backlash at the bevel gear heel. The backlash must be 0.30 + 0.12 - 0.10 mm (.012 + .005 - .004 inch). To measure the backlash, place a dial indicator tangent to the spline, as shown. Make sure that the yoke or the spline adapter is tight to the spline.



    Illustration 2g00275111

    Pinion Shaft Spline (backlash measurement)

    (B) Distance of dial indicator from the centerline of the pinion.

  1. The following table lists examples of backlash at the pinion shaft. The table shows the different distances from the centerline of the pinion to the dial indicator:

    Table 2
    Examples of Backlash at Pinion Shaft    
    Dimension (B)     Nominal Backlash     Maximum Backlash     Minimum Backlash    

    50 mm (2 inch)    

    0.28 mm (.011 inch)    

    0.40 mm (.016 inch)    

    0.18 mm (.007 inch)    

    100 mm (4 inch)    

    0.57 mm (.022 inch)    

    0.80 mm (.032 inch)    

    0.35 mm (.014 inch)    

    150 mm (6 inch)    

    0.86 mm (.034 inch)    

    1.20 mm (.047 inch)    

    0.53 mm (.021 inch)    

    200 mm (8 inch)    

    1.15 mm (.045 inch)    

    1.60 mm (.063 inch)    

    0.70 mm (.028 inch)    

  1. If the backlash does not meet specifications, loosen one adjusting nut and tighten the opposite adjusting nut by the same amount. This will maintain the bearing preload.

Pinion and Bevel Gear Tooth Contact Check




Illustration 3g00103470

  1. After the differential backlash adjustments and the pinion preload adjustments have been made, the tooth contact between pinion shaft (6) and bevel gear (16) must be checked. Perform the procedure that follows:

    1. Apply a small amount of Prussian blue, of red lead, or of paint on three adjacent teeth or on four adjacent teeth of bevel gear (16) .

    1. Rotate pinion shaft (6) for several revolutions in one direction. Then rotate pinion shaft (6) for several revolutions in the opposite direction. Then turn the pinion shaft in one direction until the marked teeth can be viewed.

    1. The correct area of tooth contact begins near the inside end of the teeth of bevel gear (16). The correct area reaches a maximum of 50 percent of the tooth length. See Illustration 3 for an example of the correct area of tooth contact.



    Illustration 4g00103471

  1. If the tooth contact looks like the marks in Illustration 4 perform the procedure that follows:

    1. Remove some of shims (28) .

    1. From Testing And Adjusting, "Differential Backlash and Bearing - Adjust", perform step 16, step 17, and step 18 again.

    1. Perform Step 1 of "Pinion and Bevel Gear Tooth Contact Check" again.



    Illustration 5g00103472

  1. If the tooth contact looks like the marks in Illustration 5, perform the procedure that follows:

    1. Add some of shims (28) .

    1. From Testing And Adjusting, "Differential Backlash and Bearing - Adjust", perform step 16, step 17, and step 18 again.

    1. Perform Step 1 of "Pinion and Bevel Gear Tooth Contact Check" again.

    Note: Always make sure that the backlash adjustment is correct before an adjustment is made to the area of tooth contact. To get the correct adjustments, the backlash and tooth contact may need to be adjusted several times. Always remember that a change to gear clearance (backlash) will also change the gear contact. A change in gear contact will also change gear clearance (backlash).

  1. After adjustments are made, remove the Prussian blue, red lead or paint from the gears.

  1. Install one bolt and lock (5) and (19) in each adjusting nut (4) and (20). Tighten both bolts and bend the locks.

Caterpillar Information System:

3054 Engine Electrical System
950G Wheel Loader, 962G Wheel Loader and IT62G Integrated Toolcarrier Power Train Differential Pinion Preload - Adjust
950G and 962G Wheel Loaders and IT62G Integrated Toolcarrier Power Train Axle Housing - Assemble
3054 Engine Air Inlet and Exhaust System
768C, 769C, 769D, 772B, 773B, 773D, 776C, 777B, 777D, 784B, 785, 785B, 789, 789B, 793, 793B and 793C Off-Highway Truck/Tractors and 771C, 771D and 775D Quarry Trucks Automatic Retarder Control (ARC) System Solenoid Valve (Supply Shutoff)
768C, 769C, 769D, 772B, 773B, 773D, 776C, 777B, 777D, 784B, 785, 785B, 789, 789B, 793, 793B and 793C Off-Highway Truck/Tractors and 771C, 771D and 775D Quarry Trucks Automatic Retarder Control (ARC) System Pressure Switch (Engine Oil)
844 Wheel Dozer Engine Starting
VFS50 and VFS70 Versatile Flotation System Air Springs - Remove
583R Pipelayer Power Train Transmission Selector And Pressure Control Valve
550, 570 and 580 Wheel Harvesters Before Starting Engine
416C, 426C, 428C, 436C and 438C Backhoe Loaders Hydraulic and Steering System Pressure and Flow Compensator Valve
938G Wheel Loader and IT38G Integrated Toolcarrier Hydraulic System Solenoid Valve (Ride Control)
740 Articulated Truck, 768C, 769C, 769D, 772B, 773B, 773D, 773E, 773F, 776, 776B, 776C, 776D, 777, 777B, 777C, 777D, 777F, 784B, 784C, 785, 785B, 785C, 785D, 789, 789B, 789C, 789D, 793, 793B, 793C and 793D Off-Highway Trucks and 771C, 771D, 775B, 775 Traction Control Valve
Caterpillar Monitoring System Senders
3054 Engine Engine Design
789C Off-Highway Truck Steering System Steering System
768C, 769C, 769D, 772B, 773B, 773D, 776C, 777B, 777D, 784B, 785, 785B, 789, 789B, 793, 793B and 793C Off-Highway Truck/Tractors and 771C, 771D and 775D Quarry Trucks Automatic Retarder Control (ARC) System Solenoid Valve (Pressure Control)
768C, 769C, 769D, 772B, 773B, 773D, 776C, 777B, 777D, 784B, 785, 785B, 789, 789B, 793, 793B and 793C Off-Highway Truck/Tractors and 771C, 771D and 775D Quarry Trucks Automatic Retarder Control (ARC) System Pressure Switch (Retarder)
784B and 785B Off-Highway Truck Hydraulic System Hydraulic System Schematic
Caterpillar Monitoring System Switches
416C, 426C, 428C, 436C and 438C Backhoe Loaders Hydraulic and Steering System Piston Pump (Implement and Steering)
550, 570 and 580 Wheel Harvesters Parking
VFS50 and VFS70 Versatile Flotation System Midroller - Remove
Caterpillar<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> AP-650B and Barber-Greene<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> BG-225C Asphalt Pavers Fuel System - Prime
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.