- There are no leaks
- No parts are damaged or loose
- There are not persons, objects, or other sources of danger near the power pack.
Before putting the power pack into operation, the operator must be familiar with the position of the controls and instruments.
Before the operator uses the power pack in for the first time, it is recommended to first try out the power pack on open ground without any obstacles.
When using the power pack, check the surroundings constantly to identify potential hazards in time.
The operator must observe the local regulations.
Conformity and registration are void if modifications are made on the power pack.
Putting into operation for the first time
Before putting into operation for the first time, check the power pack and hydraulic hoses visually for exterior damage, and check whether the equipment supplied with the power pack is complete.
Each power pack is correctly adjusted and checked before the power pack is delivered.
The hydraulic hoses are filled with the correct hydraulic oil at the factory.
Observe the maintenance interval schedule and perform (or have performed) the mandatory maintenance
Refer to Maintenance Interval Schedule for more information.