- Compact Track Loader
- 259D (S/N: LW51-UP; FTK1-UP; GTK1-UP; FTL1-UP)
- 279D (S/N: TP51-UP; GTL1-UP; PPT1-UP; RCX1-UP)
- 289D (S/N: WE51-UP; WCT1-UP; TAW1-UP; A9Z1-UP)
- 299D (S/N: GTC1-UP)
- 299D XHP (S/N: JST1-UP)
- 299D2 (S/N: FD21-UP; BY41-UP)
- 299D2 XHP (S/N: DX21-UP; DX91-UP)
- 279D (S/N: TP51-UP; GTL1-UP; PPT1-UP; RCX1-UP)
- Multi Terrain Loader
- 257D (S/N: EML1-UP; FMR1-UP; D5T1-UP; EZW1-UP)
- 277D (S/N: NTL1-UP; FMT1-UP; MLT1-UP)
- 287D (S/N: STK1-UP; TLK1-UP; HMT1-UP)
- 297D (S/N: BE71-UP)
- 297D XHP (S/N: HP71-UP)
- 297D2 (S/N: BL71-UP)
- 297D2 XHP (S/N: HP21-UP)
- 277D (S/N: NTL1-UP; FMT1-UP; MLT1-UP)
- Skid Steer Loader
- 236D (S/N: K2D1-UP; SEN1-UP; MPW1-UP; BGZ1-UP)
- 242D (S/N: HFB1-UP; DML1-UP; DZT1-UP; A9W1-UP)
- 246D (S/N: PN51-UP; BYF1-UP; JSL1-UP; HMR1-UP)
- 262D (S/N: RE51-UP; DTB1-UP; KTS1-UP; LST1-UP)
- 272D (S/N: B5W1-UP)
- 272D XHP (S/N: ETL1-UP)
- 272D2 (S/N: BL21-UP)
- 272D2 XHP (S/N: MD21-UP)
- 242D (S/N: HFB1-UP; DML1-UP; DZT1-UP; A9W1-UP)
Introduction
Revision History | |
---|---|
Revision | Summary of Changes |
07 | Added prefixes K2D, HFB, D5T, LW5, PN5, RE5, TP5, WE5 |
The procedures in this Special Instruction are for the installation of the 388-8273 Work Tool Wiring Kit. Read and understand the information in this Special Instruction before performing any of the steps listed below.
Required Parts
Parts of the 388-8273 Work Tool Wiring Kit | |||
---|---|---|---|
Part | Part No. | Description | Qty. |
(1) | Cable Strap (15.5-IN) | 5 | |
(2) | Bolt | 4 | |
(3) | Relay As | 5 | |
(4) | Nut | 1 | |
(5) | Strap | 5 | |
(6) | Rocker Switch (WORK TOOL) | 1 | |
(7) | Work Tool Harness As | 1 | |
(8) | Joystick Control Gp | 1 | |
(9) | Bracket | 1 | |
(10) | Lockwasher | 1 | |
(11) | Bolt | 2 | |
(12) | Cable Strap | 4 | |
(13)(1) | Washer | 1 | |
(14) | Hard Washer | 1 | |
(15) | Nut | 1 |
(1) | For use with 272D, 299D machines only. |
Connector Configuration
356-6115 Work Tool Harness As Pin Configuration | ||
---|---|---|
Pin | Wire No. | Wire Color |
1 | A571-T2 | Purple |
2 | A572-T8 | Pink |
3 | M906-T3 | Blue |
4 | M907-T4 | Gray |
5 | H759-T12 | Orange |
6 | H758-T11 | Brown |
7 | C460-T7 | Blue |
8 | C481-T5 | Green |
Ground | 200-T1 | Black |
263-5418 Rocker Switch Connector Configuration | ||
---|---|---|
Pin | Wire Number | Wire Color |
1 | N/A | N/A |
2 | 190-L108 | Pink |
3 | A572-L119 | Pink |
4 | N/A | N/A |
5 | N/A | N/A |
6 | N/A | N/A |
7 | 200-L91 | Black |
8 | 614-L114 | Purple |
9 | N/A | N/A |
10 | N/A | N/A |
12 Pin Joystick Connector Configuration | ||
---|---|---|
Pin | Wire Number | Wire Color |
1 | N/A | N/A |
2 | 322-CH6 | Gray |
3 | 114-CH7 | Red |
4 | N/A | N/A |
5 | G985-CH10 | Purple |
6 | 781-CH11 | Pink |
7 | 203-CH20 | Black |
8 | 782-CH12 | Gray |
9 | N/A | N/A |
10 | P814-CH13 | Blue |
11 | F763-CH14 | White |
12 | 203-CH15 | Black |
Receptacle Connection | ||
---|---|---|
Pin | Wire No. | Wire Color |
1 Power | 126-CH24 | Pink |
2 Ground | 203-CH25 | Black |
3 Signal - X Axis | E847-CH26 | Gray |
4 Calibration - S | N/A | N/A |
5 Signal - Y Axis | E848-CH27 | Green |
6 Calibration - R | N/A | N/A |
Installing the Harness on the ARC Machines
- Attach bracket (9) to the plate on the lift arm. Secure using two bolts (11). Tighten to a torque of
40 ± 4 N·m (30 ± 3 lb ft) .Show/hide tableIllustration 2 g03413912 (7) 356-6115 Work Tool Harness As - Route harness (7) inside the left lift arm. Start from the rear of the machine feeding the 344-6145 Receptacle As in first. Feed harness (7) through the arm until the 344-6145 Receptacle As reaches bracket (9).
Show/hide table
Illustration 3 g03414710 (4) 159-9495 Nut
(9)396-7208 Bracket
(10)159-9496 Lockwasher
(A) Provided receptacle cover. - Insert the receptacle into bracket (9), secure using nut (4) and washer (10). Install provided cover (A) on to the receptacle.
Illustration 1 | g03413899 |
(9) (11) |
Connecting the Harness
- Locate the RL-C19 connector inside the left rear tower. Remove the cap seal from the RL-C19 connector and discard the cap seal.
Show/hide table
Illustration 4 g03415883 (7) 356-6115 Work Tool Harness As
(B) TC-1 Connector
(C) RL-C19 Connector - Connect the TC-1 Connector (B) on harness (7) to the RL-C19 Connector (C). Refer to Table 3 for correct connector configuration.
Show/hide table
Illustration 5 g03419709 (13) 7P-1695 Washer For use on the 272D, and 299D models only.
(14)8T-4121 Hard Washer
(15)8T-4133 Nut - Secure the ground terminal to the ground stud located in the left rear tower. Use washer (13) or (14) and nut (15) to secure the ground terminal. Tighten the nut to a torque of
30 ± 7 N·m (22 ± 5 lb ft) .
Securing the Harness on ARC Machine
- Use one strap (5) to secure harness (7), to the weld link on the bottom of the left lift arm.
Show/hide table
Illustration 7 g03415921 (5) 178-3620 Strap
(D) Auxiliary Hose - Use three straps (5) and secure the harness to auxiliary hose (D).
Show/hide table
Illustration 8 g03415920 (5) 178-3620 Strap - Using one strap (5) secure the harness to the auxiliary hose inside the left rear tower.
Note: Ensure that there is sufficient slack to allow for free movement at the pivot point.
Note: Store all excess harness length in the arm. Coil and secure the harness with a strap.
Illustration 6 | g03415922 |
(5) |
Securing the Harness on Extended Arm Machine
- Using one strap (1), secure the Harness to the weld link on the Lift Arm.
- Using one strap (5), secure the harness to the tube at the bottom of the lift arm.
Show/hide table
Illustration 10 g03415925 (5) 178-3620 Strap - Using one strap (5), secure the harness to the hose. Refer to Illustration 10 for location.
Show/hide table
Illustration 11 g03416566 (5) 178-3620 Strap - Using two straps (5), secure the harness to the hose at the pivot point.
Show/hide table
Illustration 12 g03416568 (5) 178-3620 Strap - Using two straps (5), secure the harness inside the left rear tower.
Note: Coil and secure any excess harness inside the left rear tower.
Illustration 9 | g03415923 |
(5) (1) |
Installing the Work Tool Rocker Switch
- Release the tabs on the switch cover on the left-hand console. Remove the switch cover.
- Remove the plug from the switch cover from the position shown in Illustration 13.
- Install switch (6) into the opening in the switch cover. Press switch in until all tabs are fully engaged.
- Inside the console, locate the LC-8 connector on the 378-1026 Panel Harness As and connect the connector to the switch installed in Step 3. Refer to Table 4 to confirm the correct connector configuration.
- Reinstall the switch cover onto the left-hand console.
Illustration 13 | g03416620 |
(6) |
Installing the Relays
- Locate the fuse panel in the rear of the cab at the right-hand side.
Show/hide table
Illustration 14 g03416627 (3) 146-9439 Relay As - Install the five relays (3) into positions "R1" through "R5" on the upper fuse block.
Removing the Current Left Hand Joystick
Note: Retain hardware for reuse in the installation of the new joystick controller.
- Remove the two screws from the outside Console Cover.
Show/hide table
Illustration 17 g03416634 Console Cover on mechanical seat. Show/hide tableIllustration 18 g03417169 Console Cover on air ride seat. - Remove the four screws from the inside Console Cover.
Show/hide table
Illustration 19 g03417297 - Remove the console covers from the seat.
Note: Do Not use any type of prying tools to remove the covers as tools may damage the covers.
Show/hide tableIllustration 20 g03417298 - Raise the 217-9053 Boot from the current joystick.
Show/hide table
Illustration 21 g03417300 - Remove the four bolts securing the joystick to the armrest. Remove straps retaining the connector to the joystick harness, if necessary. Disconnect the harness.
Illustration 15 | g03416625 |
Console Cover on mechanical seat. |
Illustration 16 | g03416633 |
Console Cover on air ride seat. |
Installing the New
- Connect the joystick 12-pin connector to the CH-C4 connector on the seat desk harness. Connect the joystick 6-pin connector to the CH-C5 connector of the seat deck harness. Refer to Table 5 and 6 to confirm the correct connector configuration.
- Secure the connectors by using two straps (12).
- Secure joystick (8) to the armrest using four bolts (2). Tighten the bolts to a torque of
6 ± 1 N·m (53 ± 9 lb in) - Return boot to original position.