Cylinder Speed - Check | |||
---|---|---|---|
Date: | Machine Serial Number: | ||
Item | Cylinder Position | Specification(1) | Actual |
Boom | Extension | 3.2 ± 0.3 sec | |
Retraction | 2.4 ± 0.3 sec | ||
Stick | Extension | 3.5 ± 0.3 sec | |
Retraction | 2.4 ± 0.3 sec | ||
Bucket | Extension | 2.9 ± 0.3 sec | |
Retraction | 1.9 ± 0.3 sec | ||
Blade | Extension | 2.1± 0.3 sec | |
Retraction | 3.0± 0.3 sec | ||
Boom Swing | Extension | 2.6 ± 0.3 sec | |
Retraction | 2.6 ± 0.3 sec | ||
Undercarriage | Extension | 3.5 ± 0.5 sec | |
Retraction | 4.5 ± 0.5 sec |
(1) | Maximum |
The performance level of the cylinders and the hydraulic oil flow through the system to the implements can be determined by the following procedure.
Note: The engine speed and/or the machine configuration that is used during this test can affect the results of this test. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for the engine speed that was used for this test. Refer to Testing and Adjusting, "Operational Checks" for the machine configurations that were used for this test.
Note: The relief valve pressure settings must be set to the relief valve pressure specification before performing this operational check. Refer to Testing and Adjusting, "Specifications".
Required Tools | |
Description | Qty |
Stopwatch | 1 |
- Perform the following steps in order to test the operating speed of the boom cylinders.
Show/hide table
Table 3 Boom Cylinder Cylinder Position Specification(1) Extension 3.2 ± 0.3 sec Retraction 2.4 ± 0.3 sec Show/hide table(1) Maximum - Start the engine.
- Place the machine on level ground.
- Increase the hydraulic oil temperature to
55° ± 5°C (131° ± 9°F) . - Empty the bucket.
- Fully retract the bucket cylinder and fully retract the stick cylinder. Refer to Illustration 1.
- Position the bucket on the ground. With a stopwatch, measure the time that is required to extend the boom cylinders.
- Position the boom cylinders at full extension. With a stopwatch, measure the time that is required for the bucket to come in contact with the ground.
- Refer to the specifications in Table 3 for the operating speed of the boom cylinders.
Show/hide tableIllustration 1 g02794256 (A) Retraction test
(B) Extension test - Perform the following steps in order to test the operating speed of the stick cylinder.
Show/hide table
Table 4 Stick Cylinder Cylinder Position Specification(1) Extension 3.5 ± 0.3 sec Retraction 2.4 ± 0.3 sec Show/hide table(1) Maximum - Start the engine.
- Place the machine on level ground.
- Increase the hydraulic oil temperature to
55° ± 5°C (131° ± 9°F) . - Empty the bucket.
- Position the upper surface of the boom parallel to the ground.
- Fully extend the bucket cylinder. Refer to Illustration 2.
- Fully retract the stick cylinder. With a stopwatch, measure the time that is required to extend the stick cylinder.
- Fully extend the stick cylinder. With a stopwatch, measure the time that is required to retract the stick cylinder.
Note: Do not include the time of the snubber operation of the stick cylinders.
- Refer to the specifications in Table 4 for the operating speed of the stick cylinder.
Show/hide tableIllustration 2 g02794330 (A) Extension test
(B) Retraction test - Perform the following steps in order to test the operating speed of the bucket cylinder.
Show/hide table
Table 5 Bucket Cylinder Cylinder Position Specification(1) Extension 2.9 ± 0.3 sec Retraction 1.9 ± 0.3 sec Show/hide table(1) Maximum - Start the engine.
- Place the machine on level ground.
- Increase the hydraulic oil temperature to
55° ± 5°C (131° ± 9°F) . - Empty the bucket.
- Position the upper surface of the boom parallel to the ground.
- Position the stick so that the stick is perpendicular to the ground. Refer to Illustration 3.
- Fully retract the bucket cylinder. With a stopwatch, measure the time that is required to extend the bucket cylinder.
- Fully extend the bucket cylinder. With a stopwatch, measure the time that is required to retract the bucket cylinder.
- Refer to the specifications in Table 5 for the operating speed of the bucket cylinder.
Show/hide tableIllustration 3 g02794327 (A) Extension test
(B) Retraction test - Perform the following steps in order to test the operating speed of the blade cylinder.
Show/hide table
Table 6 Blade Cylinder Cylinder Position Specification(1) Extension 2.1 ± 0.3 sec Retraction 3.0 ± 0.3 sec Show/hide table(1) Maximum - Start the engine.
- Place the machine on level ground.
- Increase the hydraulic oil temperature to
55° ± 5°C (131° ± 9°F) . - Position the stick so that the stick is perpendicular to the ground.
- Lower the stick to the ground. Refer to Illustration 4.
- Fully retract the blade cylinder. With a stopwatch, measure the time that is required to lower the blade to the ground.
- Position the blade on the ground. With a stopwatch, measure the time that is required to retract the blade cylinder.
- Refer to the specifications in Table 6 for the operating speed of the blade cylinder.
Show/hide tableIllustration 4 g02794338 (A) Extension test
(B) Retraction test - Perform the following steps in order to test the operating speed of the boom swing cylinder.
Show/hide table
Table 7 Boom Swing Cylinder Cylinder Position Specification(1) Extension 2.6 ± 0.3 sec Retraction 2.9 ± 0.3 sec Show/hide table(1) Maximum - Start the engine.
- Place the machine on level ground.
- Increase the hydraulic oil temperature to
55° ± 5°C (131° ± 9°F) . - Position the stick so that the stick is perpendicular to the ground.
- Fully retract the boom swing cylinder. With a stopwatch, measure the time that is required to extend the boom swing cylinder.
- Position the boom swing against the swing stop. With a stopwatch, measure the time that is required to retract the boom swing cylinder.
- Refer to the specifications in Table 7 for the operating speed of the boom swing cylinder.
Show/hide tableIllustration 5 g02795036 (A) Extension test
(B) Retraction test - Perform the following steps in order to test the operating speed of the undercarriage cylinder.
Show/hide table
Table 8 Undercarriage Cylinder Cylinder Position Specification(1) Extension 3.5 ± 0.5 sec Retraction 4.5 ± 0.5 sec Show/hide table(1) Maximum - Start the engine.
- Increase the hydraulic oil temperature to
55° ± 5°C (131° ± 9°F) . - Swing the upper structure in order to position the dozer blade behind the operator.
Apply down pressure with the dozer blade in order to lift the rear of the machine off the ground. Simultaneously hold the joystick controls in the BOOM LOWER position and the STICK OUT position until the tracks are off the ground.
- Fully retract the undercarriage cylinder. With a stopwatch, measure the time that is required to retract the undercarriage cylinder.
- Fully extend the undercarriage cylinder. With a stopwatch, measure the time that is required to extend the undercarriage cylinder.
- Refer to the specifications in Table 8 for the operating speed of the undercarriage cylinder.
Show/hide tableIllustration 6 g02795106