UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Caterpillar


Current Transformers (Primary, Secondary)

Usage:

ES12F CZE
There are two sets of Current Transformers that are used in order to measure the current going to the load.

The primary set of three Current Transformers surrounds each phase of the output bus bars in the top part of the cabinet. The primary Current Transformer ratio is 2000:5.

The secondary set of three Current Transformers takes the output of the primary Current Transformers and further reduces the current that is fed to the External Source Sync Board in a 5:0.1 ratio. These Current Transformers are located on the fan plenum shield, above the fans in version 1 hardware and on the top component panel in version 2 hardware.

Current from the secondary Current Transformers is sent as signals to the ESS on the fan plenum shield, which is used to meter the output power of the 4-Wire Transformer and send the information to the APC-2 via the Multi-Drop Network.




Illustration 1g01272289

4-Wire Transformer Cabinet Current Transformer Locations, Version 1 Hardware

(1) Primary Current Transformers

(2) Secondary Current Transformers




Illustration 2g01272291

4-Wire Transformer Cabinet Current Transformer Locations, Version 2 Hardware

(1) Primary Current Transformers

(2) Secondary Current Transformers




Illustration 3g01272293

Removal Groups (Primary Current Transformer)




Illustration 4g01272311

Phase A Primary Current Transformer Removal Parts

(5) Frame

(6) Red Insulating Spacer

(7) Horizontal Bus Bar

(8) Vertical Bus Bar

(9) Transformer Output Bus

(10) Red Insulating Frame Cross-Brace

Primary Current Transformer Removal

The Primary Current Transformers fall in three removal groups. Refer to Illustration 3 for the group locations. Each removal group is made up of the following components: Current Transformer, Vertical Bus Bar (8), Horizontal Bus Bar (7), Red Insulating Spacer (6), Red Insulating Frame Cross-Brace (10), Transformer Output Bus (9) and Transformer Output Bus Frame. Refer to Illustration 4.

The following removal steps are for the Phase A Primary Current Transformer removal. The removal of the Primary Current Transformer on the other phases is similar.

  1. Perform steps in the Systems Operation, Testing and Adjusting, "Internal Component Preremoval Steps (4 Wire Transformer Cabinet)" in order to de-energize the system and gain access to internal components.



    Illustration 5g01272321

  1. Remove the four bolts (15) that hold the Vertical Bus Bar to the 4-wire transformer outputs.



    Illustration 6g01272323

  1. Remove the two bolts (16) that hold the Vertical Bus Bar to the Red Insulating Frame Cross-Brace.



    Illustration 7g01272325

  1. Remove the three (17) bolts that hold the Vertical Bus Bar to the Horizontal Bus Bar.

  1. Move the Vertical Bus Bar downward, out of the way.



    Illustration 8g01272326

    Red Insulating Spacer Assembly




    Illustration 9g01272383

    Spacer Hardware Connections

    (20) Bolt

    (21) Split Washer

    (22) Washer

  1. Remove the two bolts (20) that hold the Red Insulating Spacer to the Horizontal Bus Bar.

    Note: Removal of the Phase C (lower left) Primary Current Transformer requires the removal of two Red Insulating Spacers.




    Illustration 10g01272328

  1. Remove the two cross tip screws that hold the Current Transformer to the red corner bracket and to the Horizontal Bus Bar.



    Illustration 11g01272422

  1. Remove the two wires that connect to the "X1" and "X2" terminals of the Current Transformer. The wires locations are labeled. Verify the labeling. Refer to Illustration 14.

  1. Slide the Current Transformer off the Horizontal Bus Bar to the right.

Primary Current Transformer Installation

  1. Slide the Current Transformer onto the Horizontal Bus Bar from the right, with the "H1" side facing the left and the two "X1" and "X2" terminals on the front at the top.



    Illustration 12g01272328



    Illustration 13g01272384

    Current Transformer Hardware Connections

  1. Attach the Current Transformer to the red corner bracket and Horizontal Bus Bar with the following fasteners: two cross tip screws, two washers and two nuts. Refer to Illustration 13 for hardware connections.



    Illustration 14g01272422

  1. Attach the "X1" and "X2" wires to the two terminals. The wires locations are labeled. See Illustration 14 for wire connections.



    Illustration 15g01272326



    Illustration 16g01272383

    Spacer Hardware Connections

    (20) Bolt

    (21) Split Washer

    (22) Washer

  1. Attach the Red Insulating Spacer to the Horizontal Bus Bar rail with two bolts/washers. Refer to Illustration 16 for hardware connections.



    Illustration 17g01272325



    Illustration 18g01326837

    (25) Nut

    (26) Belleville Washer

    (27) Grade 8 Coated Steel Washer

    (28) Bus Bars

    (29) Bolt

  1. Attach the Vertical Bus Bar to the Horizontal Bus Bar with three bolts/washers/ nuts. Insert the bolts from the bottom side of the bus bar.

    Refer to Illustration 17 and Illustration 18 for hardware connections.




    Illustration 19g01272321

  1. Attach the Vertical Bus Bar to the transformer outputs with four bolts/washers/ nuts. Insert the bolts from the back side of the bus bar.

    Refer to Illustration 19 and Illustration 18 for hardware connections.




    Illustration 20g01272323

  1. Attach the Vertical Bus Bar to the Red Insulating Frame Cross-Brace with the following fasteners: two bolts, two washers and two nuts. Insert the bolts from the back side of the bus bars.

    Refer to Illustration 20 and Illustration 18 for hardware connections.

  1. Tighten the bus bar to bus bar nuts to 150 N·m (110 lb ft).

    Note: Always tighten the hex nut, not the bolt.

Secondary Current Transformer Removal

  1. Perform steps in the Systems Operation, Testing and Adjusting, "Internal Component Preremoval Steps (4 Wire Transformer Cabinet)" in order to de-energize the system and gain access to internal components.

  1. Remove the four wires that connect to the "H1", "H2", "X1" and "X2" posts of the Current Transformer. The cables locations are labeled. Verify the labels.

  1. Remove the four cross tip screws that attach the Current Transformer to the fan plenum panel.

  1. Remove Current Transformer from cabinet

Secondary Current Transformer Installation




    Illustration 21g01272395

  1. Position the Current Transformer on the fan plenum panel in the position and orientation indicated by Illustration 21.

  1. Attach the Current Transformer to the fan plenum panel with four cross tip screws.

  1. Attach the four cables to the "H1", "H2", "X1" and "X2" posts of the Current Transformer. Refer to Illustration 21 for wire connections.

Caterpillar Information System:

UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies System Voltage - Calibrate
C9 Engine for Caterpillar Built Machines Flywheel Housing - Remove and Install
C11 and C13 Engines for Caterpillar Built Machines Inlet Manifold - Remove
C11 and C13 Engines for Caterpillar Built Machines Inlet Manifold - Install
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Transformer (T12 to T16 )
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies Controller Board Battery - Replace
SPF343 and SPF343C Trailer Mounted Pumpers Air Shutoff - Replace
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Thermal Switch Monitor PWA
3500 Generator Sets with Dynamic Gas Blending Air Shutoff - Test
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys General Purpose Interface PWA (4 Wire Transformer Cabinet)
2006/10/09 New Test Kits for the Coolant {1395}
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies Transfer to Bypass Mode (MMS)
C9 Engine for Caterpillar Built Machines Vibration Damper and Pulley - Remove and Install
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Flywheel Operating Parameters
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys UPS Messages
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Graphical User Interface Messages
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Flywheel Messages
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys UPS View Commands and Hot Keys
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Fan (4 Wire Transformer Cabinet)
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys External Source Sync PWA (4 Wire Transformer Cabinet)
TA19-M2WD and TA19-M4WD Agricultural Transmissions Transmission - Assemble
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies General Information (Cabinet Hardware)
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies Door
C280 Marine Auxiliary Engines System Overview