525C, 535C and 545C Wheel Skidders Power Train Caterpillar


Transmission - Assemble

Usage:

525C 525

Assembly Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     138-7573     Link Bracket     1    
C     1P-2420     Transmission Repair Stand     1    
D     2P-8312     Retaining Ring Pliers     1    
E     8T-5096     Dial Indicator Gp     1    
F     9U-7480     Compressing Tube     1    
G     1P-1863     Retaining Ring Pliers     1    
H     9U-7479     Compressing Tube     1    
J     1U-6341     Threaded Rod     1    
K     5P-7970     Nut     1    
M     1P-0520     Driver Gp     1    
N     154-9731     Thread Lock Compound     1    



    Illustration 1g00960522

  1. Lower the temperature of bearing (158) and bearing cup (159) . Install bearing (158) , bearing cup (159) , and seal (160) in cover (155) .



    Illustration 2g00960379

  1. Lower the temperature of bearings (156) and (157) . Install bearings (156) and (157) in cover (155) .



    Illustration 3g00984256

  1. Install magnetic screen (154) and suction screen (153) .



    Illustration 4g00984255

  1. Install cover (152) and bolts (151) .



    Illustration 5g01272199

    Note: Adjust Thickness of shims (148) to 5.0 ± 0.5 mm (0.197 ± 0.0197 inch).

  1. Lower the temperature of bearing cup (150) . Install bearing cup (150) , seal (149) , and shims (148) in bearing cage (146) .



    Illustration 6g01272164

  1. Install bearing cage (146) and bolts (147) in transmission case (132) .



    Illustration 7g00984252

  1. Raise the temperature of bearing cone (145) and install bearing cone (145) and gear (144) on shaft assembly (133) .



    Illustration 8g00984251

  1. Install shaft assembly (133) .



    Illustration 9g00986212



    Illustration 10g00986213



    Illustration 11g00984249

  1. Lower the temperature of bearing cup (141) and install bearing cup (141) with Tooling (M) .

  1. Use Tooling (M) in order to install seal (142) .

  1. Install shims (140) , bearing cup (141) , seal (142) , and seal (143) in bearing cage (139) .

    ReferenceFor proper shaft end play, refer to Testing and Adjusting, RENR8891, "Bearing End Play (Output Transfer Gears) - Adjust".




    Illustration 12g00984247

  1. Install the bearing cage and install bolts (138) . Tighten bolts (138) to a torque of 105 ± 20 N·m (77 ± 15 lb ft).



    Illustration 13g00986214

  1. Raise the temperature of bearing cone (131) . Install bearing cone (131) on shaft (133) .



    Illustration 14g00984240

  1. Lower the temperature of bearings (128) , (129) , and (130) . Install the bearings in transmission case (132) .



    Illustration 15g00984239

  1. Install thrust disc (127) in transmission case (132) .



    Illustration 16g00984236

  1. Install seals (124) and (126) on piston (124) .



    Illustration 17g00984232

  1. Balance seal assembly (124) , wave spring (123) , and piston (122) upon installation. Check the lips on the seals for damage or wear. Replace the seals if it is necessary.



    Illustration 18g00979099

  1. Install piston (124) .



    Illustration 19g00979091

  1. Install wave spring (123) .



    Illustration 20g00979089

  1. Install balance piston (122) .



    Illustration 21g00979073



    Illustration 22g00979077

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Position the shaft assembly so retaining ring (121) lines up with the opening on Tooling (H) .

  1. Install Tooling (H) , Tooling (J) , and Tooling (K) in order to compress the wave spring (not shown). Use Tooling (D) in order to install retaining ring (121) . Remove Tooling (H) .



    Illustration 23g00979070

  1. Use Tooling (G) to install retaining ring (120) .



    Illustration 24g00979064



    Illustration 25g00979063

  1. Install friction discs (119) , clutch plates (118) , and end plate (117) .



    Illustration 26g00979060

  1. Install retaining ring (116) .



    Illustration 27g00979059

  1. Install ring retainer (115) and thrust disc (114) .



    Illustration 28g00744470



    Illustration 29g00744313

    Typical Example

    (W) End plate. (X) Retaining ring. (Z) Oil passage. (Y) Running clearance.

  1. Use Tooling (E) , a suitable air supply, and the following procedure to measure the running clearance of the clutch pack:

    1. Place the shaft in the vertical position. End Plate (W) that will be measured should be facing upward.

    1. Make sure that End Plate (W) is free.

    1. Position the tip of Tooling (E) on End Plate (W) . Zero Tooling (E) .

      ------ WARNING! ------

      Personal injury can result from applying air pressure without the lock ring securely in place.

      If the lock ring is not secure, the end plate and discs can suddenly come out with great force.

      Make sure lock ring is securely in place before applying air pressure to clutch pack.

      ----------------------

    1. Apply air pressure of approximately 140 kPa (20 psi) to appropriate Passage (Z) in the shaft for the clutch that is being checked.

    1. End Plate (W) should move upward and End Plate (W) should contact Retaining Ring (X) . The dial indicator will display the distance between End Plate (W) and Retaining Ring (X) . This is the running clearance of the clutch pack. For the proper running clearance, refer to the Testing and Adjusting, "Transmission Clutch Running Clearance - Check" for the machine that is being serviced.



    Illustration 30g00979056

  1. Connect hub assembly (112) to gear (110) .

  1. Use Tooling (G) to install retaining ring (111) .

  1. Lower the temperature of bearing (113) and install bearing (113) .

    Note: After the bearing is installed, the diameter must be 79.113 ± 0.05 mm (3.1147 ± 0.002 inch).




    Illustration 31g00979054

  1. Install gear and hub assembly (110) .



    Illustration 32g00979049

  1. Install thrust disc (109) .



    Illustration 33g00979043

  1. Install gear (108) .



    Illustration 34g00979038

  1. Use Tooling (D) to install retaining ring (107) .



    Illustration 35g00977455

  1. Install thrust disc (106) .



    Illustration 36g00977453

  1. Install seal rings (105) .



    Illustration 37g01272046

  1. Use Tooling (A) and a suitable lifting device to rotate shaft assembly (78) to the opposite side. The weight of shaft assembly (78) is approximately 45 kg (100 lb).



    Illustration 38g00977446

  1. Balance seal assembly (102) , wave spring (103) , and piston (104) upon installation. Check the lips on the seals for damage or wear. Replace the seals, if necessary.



    Illustration 39g00977444

  1. Install piston (104) on the shaft.



    Illustration 40g00977441

  1. Install wave spring (103) .



    Illustration 41g00977438

  1. Install balance seal assembly (102) .



    Illustration 42g00977426

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Install Tooling (F) , Tooling (J) , and Tooling (K) in order to compress the wave spring (not shown).

  1. Use Tooling (D) to install retaining ring (101) . Release the pressure on the wave spring and remove Tooling (F) .



    Illustration 43g00977433



    Illustration 44g00977424

  1. Install one disc assembly (99) , clutch plates (100) , and end plate (98) .



    Illustration 45g00977422

  1. Install retaining ring (97) .



    Illustration 46g00977380

  1. Use Tooling (D) to install retaining ring (96) .



    Illustration 47g00744470



    Illustration 48g00744313

    Typical Example

    (W) End plate. (X) Retaining ring. (Z) Oil passage. (Y) Running clearance.

  1. Use Tooling (E) , a suitable air supply, and the following procedure to measure the running clearance of the clutch pack:

    1. Place the shaft in the vertical position. End Plate (W) that will be measured should be facing upward.

    1. Make sure that End Plate (W) is free.

    1. Position the tip of Tooling (E) on End Plate (W) . Zero Tooling (E) .

      ------ WARNING! ------

      Personal injury can result from applying air pressure without the lock ring securely in place.

      If the lock ring is not secure, the end plate and discs can suddenly come out with great force.

      Make sure lock ring is securely in place before applying air pressure to clutch pack.

      ----------------------

    1. Apply air pressure of approximately 140 kPa (20 psi) to appropriate passage (Z) in the shaft for the clutch that is being checked.

    1. End Plate (W) should move upward and End Plate (W) should contact Retaining ring (X) . The dial indicator will display the distance between End Plate (W) and Retaining Ring (X) . This is the running clearance of the clutch pack. For the proper running clearance, refer to the Testing and Adjusting, "Transmission Clutch Running Clearance - Check" for the machine that is being serviced.



    Illustration 49g00976232

  1. Install retainer (95) and thrust disc (94) .



    Illustration 50g00976230

  1. Connect hub assembly (92) to gear (90) .

  1. Lower the temperature of bearing (93) and install bearing (93) in hub assembly (92) .

    Note: After bearing (93) is installed the inside diameter must be 65.046 ± 0.039 mm (2.5609 ± 0.0015 inch).

  1. Use Tooling (D) to install retaining ring (91) .



    Illustration 51g00976229

  1. Install gear (90) .



    Illustration 52g00976228

  1. Install thrust disc (89) . Use Tooling (D) to install retaining ring (88) .



    Illustration 53g00976215

  1. Use Tooling (A) and a suitable lifting device to install shaft assembly (87) . The weight of shaft assembly (87) is approximately 82 kg (180 lb).



    Illustration 54g01272168

  1. Install sensor (85) and connect harness assembly (86) .



    Illustration 55g00986223

  1. Raise the temperature of bearing cone (83) and gear (84) . Turn shaft (78) in order to install bearing cone (83) and gear (84) .



    Illustration 56g00986224



    Illustration 57g00975867

  1. Raise the temperature of carrier (80) , bearing cone (81) , and gear (82) . Install the bearings on shaft (78) .

  1. Install seal ring (79) .



    Illustration 58g00975828

  1. Install input shaft assembly (78) .



    Illustration 59g00988354

  1. Install seal rings (76) and (77) on piston (75) . Replace the seals if it is necessary.



    Illustration 60g00975818

  1. Install piston seal (75) .



    Illustration 61g00975812

  1. Install wave spring (74) .



    Illustration 62g00975811

  1. Install balance seal assembly (73) .



    Illustration 63g00975588



    Illustration 64g00975810

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Position the shaft assembly so the opening in retaining ring (72) will be in line with the opening in Tooling (F) .

  1. Install Tooling (F) , Tooling (J) , and Tooling (K) in order to compress the wave spring. The wave spring is not shown. Use Tooling (G) to install retaining ring (72) . Remove Tooling (F) .



    Illustration 65g00975587



    Illustration 66g00975585

  1. Install friction discs (71) , clutch plates (70) , and end plate (69) .



    Illustration 67g00975584

  1. Install retaining ring (68) . Use Tooling (D) to install retaining ring (67) .



    Illustration 68g00975579

  1. Install retainer (66) and thrust disc (65) .



    Illustration 69g00744470



    Illustration 70g00744313

    Typical Example

    (W) End plate. (X) Retaining ring. (Z) Oil passage. (Y) Running clearance.

  1. Use Tooling (E) , a suitable air supply, and the following procedure to measure the running clearance of the clutch pack:

    1. Place the shaft in the vertical position. End Plate (W) that will be measured should be facing upward.

    1. Make sure that End Plate (W) is free.

    1. Position the tip of Tooling (E) on End Plate (W) . Zero Tooling (E) .

      ------ WARNING! ------

      Personal injury can result from applying air pressure without the lock ring securely in place.

      If the lock ring is not secure, the end plate and discs can suddenly come out with great force.

      Make sure lock ring is securely in place before applying air pressure to clutch pack.

      ----------------------

    1. Apply air pressure of approximately 140 kPa (20 psi) to appropriate Passage (Z) in the shaft for the clutch that is being checked.

    1. End Plate (W) should move upward and End Plate (W) should contact Retaining Ring (X) . The dial indicator will display the distance between End Plate (W) and Retaining Ring (X) . This is the running clearance of the clutch pack. For the proper running clearance, refer to the Testing and Adjusting, "Transmission Clutch Running Clearance - Check" for the machine that is being serviced.



    Illustration 71g00975578

  1. Reduce the temperature of sleeve bearings (64) and install sleeve bearings (64) .

    Note: Bearing (64) inside diameter must be 65.046 ± 0.039 mm (2.5609 ± 0.0015 inch).




    Illustration 72g00975576

  1. Install gear assembly (63) and thrust disc (62) .



    Illustration 73g00975570

  1. Position the shaft assembly with the opposite end upward, as shown. Install three seal rings (60) . Use Tooling (D) to install retaining ring (61) .



    Illustration 74g00988355

  1. Install seal rings (59A) and (59B) on piston (59) . Replace the seals if it is necessary.



    Illustration 75g00975564

  1. Install piston assembly (59) .



    Illustration 76g00975562

  1. Install wave spring (58) .



    Illustration 77g00975558

  1. Install balance seal assembly (57) .



    Illustration 78g00975553



    Illustration 79g00975555

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Position the shaft so the opening in retaining ring (56) will line up with the opening in Tooling (F) .

  1. Install Tooling (F) , Tooling (J) , and Tooling (K) in order to compress the wave spring. Use Tooling (D) to install the retaining ring (56) . Remove Tooling (F) .



    Illustration 80g00975467

  1. Install one friction discs (55) , clutch plates (54) , and end plate (53) .



    Illustration 81g00975463

  1. Install retaining ring (52) .



    Illustration 82g00975458

  1. Use Tooling (D) to install retaining ring (51) .



    Illustration 83g00744470



    Illustration 84g00744313

    Typical Example

    (W) End plate. (X) Retaining ring. (Z) Oil passage. (Y) Running clearance.

  1. Use Tooling (E) , a suitable air supply, and the following procedure to measure the running clearance of the clutch pack:

    1. Place the shaft in the vertical position. End Plate (W) that will be measured should be facing upward.

    1. Make sure that End Plate (W) is free.

    1. Position the tip of Tooling (E) on End Plate (W) . Zero Tooling (E) .

      ------ WARNING! ------

      Personal injury can result from applying air pressure without the lock ring securely in place.

      If the lock ring is not secure, the end plate and discs can suddenly come out with great force.

      Make sure lock ring is securely in place before applying air pressure to clutch pack.

      ----------------------

    1. Apply air pressure of approximately 140 kPa (20 psi) to appropriate Passage (Z) in the shaft for the clutch that is being checked.

    1. End Plate (W) should move upward and end plate (W) should contact Retaining Ring (X) . The dial indicator will display the distance between End Plate (W) and Retaining Ring (X) . This is the running clearance of the clutch pack. For the proper running clearance, refer to the Testing and Adjusting, "Transmission Clutch Running Clearance - Check" for the machine that is being serviced.



    Illustration 85g00975456

  1. Install retainer (50) and thrust disc (49) .



    Illustration 86g00975454

  1. Lower the temperature of sleeve bearing (48) and install sleeve bearing (48) , if necessary. Connect gear (45) to hub assembly (47) . Use Tooling (G) to install retaining ring (46) .

    Note: Bearing (48) inside diameter must be 65.046 ± 0.039 mm (2.5609 ± 0.0015 inch).




    Illustration 87g00975452

  1. Install gear and hub assembly (45) .



    Illustration 88g00975449

  1. Install thrust disc (44) . Use Tooling (D) to install retaining ring (43) .



    Illustration 89g01272041

  1. Position shaft assembly (42) on Tooling (C) , as shown.



    Illustration 90g00974967

  1. Use Tooling (A) and a suitable lifting device in order to install shaft assembly (42) . The weight of shaft assembly (42) is approximately 41 kg (90 lb).



    Illustration 91g00988356

  1. Install seal rings (41A) , and (41B) on piston (41) . Replace the seals, if necessary.



    Illustration 92g00974965

  1. Install piston seal (41) .



    Illustration 93g00974964

  1. Install wave spring (40) .



    Illustration 94g00974963

  1. Install balance seal assembly (39) .



    Illustration 95g00974961



    Illustration 96g00974962

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Position the shaft assembly with the opening in retaining ring (38) in line with the opening in Tooling (F) .

  1. Install Tooling (F) , Tooling (J) , and Tooling (K) in order to compress the wave spring. The wave spring is not shown. Use Tooling (D) to install retaining ring (38) and remove Tooling (F) .



    Illustration 97g00974960



    Illustration 98g00974959

  1. Install friction discs (37) , clutch plates (36) , and end plate (35) .



    Illustration 99g00974958

  1. Install retaining ring (34) .



    Illustration 100g00974957

  1. Use Tooling (D) to install retaining ring (33) .



    Illustration 101g00744470



    Illustration 102g00744313

    Typical Example

    (W) End plate. (X) Retaining ring. (Z) Oil passage. (Y) Running clearance.

  1. Use Tooling (E) , a suitable air supply, and the following procedure to measure the running clearance of the clutch pack:

    1. Place the shaft in the vertical position. End Plate (W) that will be measured should be facing upward.

    1. Make sure that End Plate (W) is free.

    1. Position the tip of Tooling (E) on End Plate (W) . Zero Tooling (E) .

      ------ WARNING! ------

      Personal injury can result from applying air pressure without the lock ring securely in place.

      If the lock ring is not secure, the end plate and discs can suddenly come out with great force.

      Make sure lock ring is securely in place before applying air pressure to clutch pack.

      ----------------------

    1. Apply air pressure of approximately 140 kPa (20 psi) to appropriate Passage (Z) in the shaft for the clutch that is being checked.

    1. End Plate (W) should move upward and End Plate (W) should contact Retaining Ring (X) . The dial indicator will display the distance between End Plate (W) and Retaining Ring (X) . This is the running clearance of the clutch pack. For the proper running clearance, refer to the Testing and Adjusting, "Transmission Clutch Running Clearance - Check" for the machine that is being serviced.



    Illustration 103g00974956

  1. Install retainer (32) and thrust disc (31) .



    Illustration 104g00974955

  1. Connect gear (27) to hub assembly (29) . Use Tooling (G) to install retaining ring (28) . If necessary, lower the temperature of bearing (30) and install sleeve bearing (30) .

    Note: Bearing (30) inside diameter must be 65.046 ± .039 mm (2.5609 ± 0.0015 inch).




    Illustration 105g00974954

  1. Install hub assembly (27) , thrust disc (26) , and the gear.



    Illustration 106g00974953

  1. Install spacer assembly (25) .



    Illustration 107g00974951

  1. Install gear (24) and washer (23) .



    Illustration 108g00974950

  1. Install thrust disc (22) .



    Illustration 109g00974949

  1. Reposition the shaft assembly, as shown. Install three seal rings (20) . Use Tooling (D) to install retaining ring (21) .



    Illustration 110g00974948

  1. Balance seal assembly (17) , wave spring (18) , and piston (19) upon installation. Check the lips on the seals for damage or wear. Replace the seals if it is necessary.



    Illustration 111g00974947

  1. Install piston assembly (19) .



    Illustration 112g00961678

  1. Install wave spring (18) .



    Illustration 113g00961656

  1. Install balance seal assembly (17) .



    Illustration 114g00961639



    Illustration 115g00961647

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Position the shaft assembly with retaining ring (16) in line with the opening in Tooling (F) .

  1. Install Tooling (F) , Tooling (J) , and Tooling (K) in order to compress the wave spring. The wave spring is not shown. Use Tooling (D) to install retaining ring (16) . Remove Tooling (F) .



    Illustration 116g00961630



    Illustration 117g00961507

  1. Install friction discs (15) , clutch plates (14) , and end plate (13) .



    Illustration 118g00961492

  1. Install retaining ring (12) .



    Illustration 119g00961468

  1. Install retaining ring (11) .



    Illustration 120g00744470



    Illustration 121g00744313

    Typical Example

    (W) End plate. (X) Retaining ring. (Z) Oil passage. (Y) Running clearance.

  1. Use Tooling (E) , a suitable air supply, and the following procedure to measure the running clearance of the clutch pack:

    1. Place the shaft in the vertical position. End Plate (W) that will be measured should be facing upward.

    1. Make sure that End Plate (W) is free.

    1. Position the tip of Tooling (E) on End Plate (W) . Zero Tooling (E) .

      ------ WARNING! ------

      Personal injury can result from applying air pressure without the lock ring securely in place.

      If the lock ring is not secure, the end plate and discs can suddenly come out with great force.

      Make sure lock ring is securely in place before applying air pressure to clutch pack.

      ----------------------

    1. Apply air pressure of approximately 140 kPa (20 psi) to appropriate Passage (Z) in the shaft for the clutch that is being checked.

    1. End Plate (W) should move upward and End Plate (W) should contact Retaining Ring (X) . The dial indicator will display the distance between End Plate (W) and Retaining Ring (X) . This is the running clearance of the clutch pack. For the proper running clearance, refer to the Testing and Adjusting, "Transmission Clutch Running Clearance - Check" for the machine that is being serviced.



    Illustration 122g00961455

  1. Install retainer (10) and thrust disc (9) .



    Illustration 123g00961444

  1. Use Tooling (G) to install retaining ring (6) .

  1. Connect hub assembly (7) and gear (5) . If necessary, lower the temperature of bearing (8) and install sleeve bearing (8) .

    Note: Bearing (8) inside diameter must be 65.046 ± 0.039 mm (2.5609 ± 0.0015 inch).




    Illustration 124g00961435

  1. Install gear and hub assembly (5) .



    Illustration 125g00961189

  1. Use Tooling (D) to install retaining ring (3) and install thrust disc (4) .



    Illustration 126g01272038



    Illustration 127g00984312

  1. Use Tooling (A) and a suitable lifting device to remove shaft assembly (1) from Tooling (C) and into the transmission case. The weight of shaft (1) is approximately 50 kg (110 lb).

    Note: Hold input shaft (2) away from shaft assembly (1) for clearance.




    Illustration 128g00748030

  1. Use shims to obtain a thickness of 0.05 mm to 0.15 mm (0.002 inch to 0.006 inch). Use Tooling (E) to check the end play on the output shaft and the input shaft.



    Illustration 129g00748037

  1. Use shims to obtain a thickness of 0.05 mm to 0.15 mm (0.002 inch to 0.006 inch). Use Tooling (E) to check the end play on the input shaft.



    Illustration 130g00984245

  1. Install parking brake group (137) . Install bolts (136) . Tighten bolts (136) to a torque of 300 ± 40 N·m (221 ± 30 lb ft).



    Illustration 131g01272211

  1. Apply Tooling (N) to the threads of bolt (134) .

  1. Install yoke (134A) , the retainer, and bolt (134) . Tighten bolt (134) to a torque of 120 ± 20 N·m (89 ± 15 lb ft).

  1. Install brake drum (135) and bolts (135A) . Tighten bolts (135A) to a torque of 120 ± 20 N·m (89 ± 15 lb ft).

End By: Connect the transmission and the torque converter. Refer to Disassembly and Assembly, "Transmission and Torque Converter - Connect".

Caterpillar Information System:

525C, 535C and 545C Wheel Skidders Power Train Transmission - Disassemble
D6N Track-Type Tractor Hydraulic System Lift Cylinder (Ripper)
D6N Track-Type Tractor Hydraulic System Angle Cylinder (Bulldozer)
854K Wheel Dozer Transmission Oil Level - Check
854K Wheel Dozer Transmission Oil Filter - Replace
D10T Track-Type Tractor Machine Systems Fast Fill Fuel Adapter
D7G Series 2 and D7G Series II Track-Type Tractors Safety Messages
D7G Series 2 and D7G Series II Track-Type Tractors Operator Controls
D6G Series 2 Track-Type Tractor Operator Controls
3508 EUI Engine for Off-Highway Truck/Tractors Muffler
525C, 535C and 545C Wheel Skidders Machine Systems Solenoid Valve and Manifold (Parking Brake Control) - Assemble
525C, 535C and 545C Wheel Skidders Machine Systems Solenoid Valve and Manifold (Parking Brake Control) - Disassemble
D6N Track-Type Tractor Hydraulic System Piston Motor (Steering)
854K Wheel Dozer Transmission Oil Sample - Obtain
854K Wheel Dozer Cooling System Coolant Level - Check
C11 and C13 Engines for Caterpillar Built Machines Inlet Manifold - Install
C11 and C13 Engines for Caterpillar Built Machines Inlet Manifold - Remove
525C, 535C and 545C Wheel Skidders Machine Systems Grapple Boom (Dual Function) - Remove
525C, 535C and 545C Wheel Skidders Machine Systems Grapple Boom (Dual Function) - Install
525C, 535C and 545C Wheel Skidders Machine Systems Grapple Arch (Dual Function) - Remove
525C, 535C and 545C Wheel Skidders Machine Systems Grapple Arch (Dual Function) - Install
854K Wheel Dozer Cooling System Coolant Extender (ELC) - Add
3508 EUI Engine for Off-Highway Truck/Tractors Engine Oil Filter Base
D6N Track-Type Tractor Hydraulic System Piston Pump (Implement)
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.