Removal Procedure
Show/hide table
Table 1
Required Tools     |
Tool     |
Part Number     |
Part Description     |
Qty     |
A     |
3S-6224     |
Electric Hydraulic Pump     |
1     |
1U-5197 |
Hydraulic Cylinder     |
1     |
6D-7726 |
Hose As     |
2     |
1P-2376 |
Quick Connect Coupler     |
2     |
1P-2377 |
Dust Plug     |
2     |
9U-6753 |
Retaining Plate     |
1     |
9R-3979 |
Rod     |
4     |
8T-4133 |
Nut     |
4     |
8T-4121 |
Hard Washer     |
4     |
9U-6751 |
Sleeve     |
1     |
9U-7998 |
Puller Stud     |
1     |
9U-6809 |
Nut     |
1     |
8T-1158 |
Bolt     |
3     |
9u-6757 |
Adapter Plate     |
1     |
B     |
3S-6224     |
Electric Hydraulic Pump Gp     |
1     |
6V-3175 |
Double Acting Cylinder     |
1     |
6D-7726 |
Hose As     |
2     |
1P-2377 |
Dust Plug     |
2     |
1P-2376 |
Quick Connect Coupler     |
2     |
9U-6753 |
Retaining Plate     |
1     |
9R-3971 |
Rod     |
4     |
8T-4133 |
Nut     |
4     |
8T-4121 |
Hard Washer     |
4     |
9U-6751 |
Sleeve     |
1     |
9U-5346 |
Nut     |
1     |
137-8460 |
Puller Stud (1)     |
1     |
9X-8258 |
Washer     |
1     |
8c-8722 |
Nut     |
1     |
9U-6757 |
Adapter Plate     |
1     |
8T-1158 |
Bolt     |
3     |
Show/hide table
( 1 ) | Cut from 1980 mm to 1025 mm |
Start By:
- Connect the steering frame lock. Refer to Disassembly and Assembly, "Steering Frame Lock - Separate and Connect".
Show/hide table
|
NOTICE |
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Caterpillar Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Caterpillar products. Dispose of all fluids according to local regulations and mandates. |
|
Show/hide table
|
|
|
Illustration 1 | g01295054 |
Note: Alignment of the pin joints is an important factor. The pins that are used in the pin joints are a slip fit. It is important to relieve the pin joint pressure from the pin joints that are being serviced. It is important to park the machine on a surface that is flat and level. Use the implement hydraulics, hoists, or suitable lifting devices in order to relieve the pin joint pressure. Use Illustration 1 as a guide for the pins and the pin joints that are referenced in this procedure.
- Lower the bucket so that the bottom of the bucket is flat on the ground.
Show/hide table
|
|
|
Illustration 2 | g00717179 |
- Install a suitable jack stand or suitable cribbing under boom (1) , as shown.
Show/hide table
|
|
|
Illustration 3 | g00703348 |
- Attach a suitable hoist and a suitable lifting sling to bucket link (2) , as shown. The weight of bucket link (2) is 263 kg (580 lb).
Show/hide table
|
|
|
Illustration 4 | g00703352 |
- Remove bolts (3) , the washers, and plate (4) from C-pin (5) .
Show/hide table
|
|
|
Illustration 5 | g00703353 |
- Attach a suitable hoist and a suitable lifting sling to Tooling (A) . The weight of Tooling (A) is 80 kg (175 lb).
- Install Tooling (A) on the end of C-pin (5) , as shown.
- Use Tooling (A) in order to remove C-pin (5) . The weight of C-pin is 29 kg (64 lb).
Show/hide table
|
|
|
Illustration 6 | g00703354 |
- Use the hoist in order to lower bucket link (2) onto boom (1) .
- Repeat Steps 3 through 8 for the remaining C-pin.
Show/hide table
|
|
|
Illustration 7 | g00703356 |
- Remove bolts (7) , the washers, and plate (8) from B-pin (6) .
Show/hide table
|
|
|
Illustration 8 | g00703357 |
Show/hide table
|
|
|
Illustration 9 | g00703358 |
- Remove bolt (9) , nut (10) , the washers, and plate (11) from B-pin (6) .
Show/hide table
|
|
|
Illustration 10 | g00861006 |
- Attach a suitable hoist and a suitable lifting sling to Tooling (B) . The weight of Tooling (B) is 80 kg (175 lb).
- Install Tooling (B) on the end of B-pin (6) , as shown.
- Use Tooling (B) in order to remove B-pin (5) . The weight of B-pin is 29 kg (64 lb).
- Repeat Steps 10 through 14 for the remaining B-pin.
Show/hide table
|
|
|
Illustration 11 | g00703362 |
- Attach a suitable hoist and lifting chains to the bucket.
- Use the hoist in order to remove the bucket. The weight of the bucket is 4080 kg (9000 lb).
Note: If the machine is operational, the bucket may be removed by backing up the machine.
Show/hide table
|
|
|
Illustration 12 | g00703363 |
- Remove collars (12) from the B-pin bores of the bucket.
Note: The outside diameter of the collar is a slip fit in the B-pin bores.