Coupling - Remove
拆卸步骤
开始:
- 拆下发电机。 请参见拆解和装配, "发电机 - 拆卸"。
Show/hide table
图 1 | g00615745 |
- 同时,加热驱动联轴器的两端。 加热接头三至五分钟。 请勿过分加热联轴器。
注: 该驱动联轴器为重型过盈配合安装件。 请勿使用其他任何方法拆卸驱动联轴器。
- 拆下驱动联轴器。
Show/hide table
操作已经加热的零件时要坚持戴防护手套。 |
Show/hide table
图 2 | g00615513 |
Caterpillar Information System:
C9 Engine For Caterpillar Built Machines Piston Cooling Jets - Remove and Install
3126B Engines for Caterpillar Built Machines Injection Actuation Pressure Control Valve - Remove and Install
G3304 and G3306 Engines Cylinder Head
G3612 and G3616 Engines Crankshaft Main Bearings - Remove
3114, 3116 and 3126 MUI Engine Governors Governor (Type VII) - Disassemble
C-9 Industrial Engine Engine Design
G3612 and G3616 Engines Camshaft - Install
3126B Engines for Caterpillar Built Machines Inlet and Exhaust Valve Seat Inserts - Remove and Install
On-Highway Engines Electronic PTO Installation and Application Guide PTO Parameters - Program
G3612 and G3616 Engines Camshaft - Remove
SR4B Generators Coupling - Install
G3612 and G3616 Engines Cylinder Liner - Install
G3304 and G3306 Engines Cylinder Head
C9 Engines for Caterpillar Built Machines Cylinder Liner - Remove
G3612 and G3616 Engines Crankshaft Main Bearings - Install
SR4B Generators Bearing - Remove and Install
G3612 and G3616 Engines Crankshaft - Remove
Electronic Modular Control Panel II (EMCP II) For MUI Engines CID 566 FMI 7 Unexpected Shutdown Improper Mechanical Response - Test
SR4B Generators Rotor - Remove and Install
Electronic Modular Control Panel II (EMCP II) For MUI Engines CID 331 FMI 2 Switch (Engine Control) Incorrect Signal - Test
3114, 3116 and 3126 MUI Engine Governors Governor (Type VII) - Assemble
3126B and 3126E On-highway Engines Unit Injector Hydraulic Pump - Remove
Electronic Modular Control Panel II (EMCP II) For MUI Engines CID 336 FMI 2 Switch (Engine Control) Incorrect Signal - Test
C9 Engine For Caterpillar Built Machines Engine Oil Pump - Disassemble