Relief Valve (Main) - Test and Adjust
Test
- Position the machine on level ground and stop the engine.
- Release the pressure in the hydraulic system. Refer to Testing And Adjusting, "Hydraulic System Pressure - Release".
- Attach a 60000 kPa (8700 psi) pressure gauge to pressure tap (3) .
Show/hide table
Illustration 1 | g00363032 |
Pump compartment (1) Pressure tap (power shift pressure) (2) Pressure tap (upper pump delivery pressure) (3) Pressure tap (lower pump delivery pressure) |
- Start the engine.
- Place the machine controls at the following settings: Power Mode and engine speed dial "10".
- Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).
- Open the bucket until the bucket cylinder rod is at the full retraction.
- Check the main relief valve pressure setting at pressure tap (3) .
Adjust
Show/hide table
Illustration 2 | g00341013 |
Top of main control valve (4) Adjustment screw (5) Locknut (6) Main relief valve |
- Return the control lever to the NEUTRAL position. Adjust the main relief valve pressure to 34300 ± 490 kPa (4950 ± 72 psi).
- To adjust the main relief valve pressure, loosen locknut (5) and turn adjustment screw (4) until the pressure gauge reading at pressure tap (3) is 34300 ± 490 kPa (4950 ± 72 psi).
- Tighten locknut (5) to a torque of 50 ± 10 N·m (37 ± 7 lb ft).
Note: Turning adjustment screw (4) clockwise increases the pressure. Turning adjustment screw (4) counterclockwise decreases the pressure.
Note: Always make final pressure adjustments on pressure rise.
Caterpillar Information System:
315B Excavator Machine Systems Swing Drive - Disassemble
315B and 315B L Excavator Supplement For 3046 Engine Hydraulic System Pressure - Release
317B L and 317B LN Excavators Excavator Systems Swing Drive - Remove and Install
330B Excavator Hydraulic System Relief Valve (Pilot) - Test and Adjust
315B and 315B L Excavator Supplement For 3046 Engine Hydraulic Oil Cooler - Remove
315B Excavator Machine Systems Boom - Remove
301.5, 301.6 and 301.8 Mini Hydraulic Excavators Travel Alarm - Test - If Equipped
315B Excavator Machine Systems Boom Cylinder - Install
5130B Excavator Hydraulic System Visual Inspection
317B L and 317B LN Excavators Excavator Systems Boom Cylinder - Assemble
330B Excavator Hydraulic System Pressure Specifications
5130B Excavator Hydraulic System General Information
Installation of the Two-Way Pilot Valve (Control Pattern Change) {5059, 5496} Installation of the Two-Way Pilot Valve (Control Pattern Change) {5059, 5496}
M318 and M320 Excavators Machine System Specifications Travel Motor
M315 Excavator Machine System Stick - 1.7 m (5.58 ft)
M322C Wheeled Excavator Machine System Swing Gear and Bearing
315B Excavator Machine Systems Boom - Install
330B Excavator Hydraulic System Pump Control (Negative Flow) - Adjust
M318 and M320 Excavators Machine System Specifications Control Valve (Boom Lowering)
315B Excavator Machine Systems Counterweight - Remove and Install
315B Excavator Machine Systems Fuel Tank - Remove
315B Excavator Machine Systems Swing Drive - Assemble
315B and 315B L Excavator Supplement For 3046 Engine Hydraulic Oil Cooler - Install
320B, 320B L and 320B N Excavators Work Tool Flow Control - If Equipped