TA19 Transmission Caterpillar


Transmission - Assemble

Usage:

TA19-M4WD XAE

Assembly Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     138-7575     Link Brackets     4    
B     154-6182     Forcing Screws     2    
C     1P-0520     Driver Gp     1    
D     3E-3879     Eyebolt M16 x 2     1    
4C-8358 Eyebolt M10 x 1.5     1    
4C-8359 Eyebolt M12 x 1.75     1    
E     154-6181     Forcing Screw     1    
F     203-5581     Plate     1    
G     FT-2769     Table     1    
H     1P-2322     Combination Puller     1    
8B-7560 Step Plate     1    
J     5P-4758     Retaining Ring Pliers As     1    
K     207-8153     Shaft Retainer     1    
L     8T-5096     Dial Indicator Gp     1    
M     1U-8846     Gasket Sealant     -    
N     380-3894     Driver Pump Drive     1    

Note: Cleanliness is an important factor. Before assembly, thoroughly clean all parts in cleaning fluid. Allow the parts to air dry. Do not use wiping cloths or rags to dry parts. Lint may be deposited on the parts which may cause trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement. Dirt and other contaminants can damage the precision component. Perform assembly procedures on a clean work surface. Keep components covered and protected at all times.

Note: Check the O-ring seals, the gaskets, and the seals for wear or for damage. Replace the components, if necessary.

Note: Lubricate all seal rings and O-ring seals prior to assembly.


NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat products.

Dispose of all fluids according to local regulations and mandates.





    Illustration 1g01270596

  1. Lower the temperature of bearing cups (144). Install bearing cups (144) .



    Illustration 2g02517517

    Cutaway view of case assembly (31) .

  1. Lower the temperature of bearing cup (36) and install bearing cup (36) into case assembly (31) .



    Illustration 3g01329472

  1. Refer to Steps 26 through 29 in order to assemble clutch assembly (143) .

  1. Use two people in order to install clutch assembly (143). The weight of clutch assembly (143) is approximately 25 kg (55 lb). Install bolts (142) .



    Illustration 4g01270555

    Input Shaft

  1. Install bearings (141) and thrust washer (139) onto shaft assembly (128). Install gear (140), thrust washer (139), and spacer (138). Raise the temperature of bearing cone (137). Install bearing cone (137). Install the seal rings after installation of bearing cone (137) .

    Note: The procedure for the assembly of the clutch packs will be identical.




    Illustration 5g01270098

  1. Install thrust washer (134) and bearings (136) onto shaft assembly (128). Install gear (135), thrust washer (134), and spacer (133) .



    Illustration 6g01270092

  1. Install gear (132), gear (131), spacer (130), and spacer (129) onto shaft assembly (128) .

  1. Raise the temperature of bearing cone (127) and install bearing cone (127) onto shaft assembly (128) .



    Illustration 7g01270078

    Output Shaft

  1. Install spacer (126) and bearing (125) onto shaft assembly (99). Install gear (124), thrust washer (123), tube (122), sun gear (121), and thrust washer (120) onto shaft assembly (99) .



    Illustration 8g01269978

  1. Install a new cap plug onto shaft (106)

    Note: Procedure for assembly of planet carriers is identical.

  1. Position bearings (103), gear (104), thrust disc (102), and shaft (106) onto carrier (101). Install shaft (106). Install pin (105) .



    Illustration 9g01270067

  1. Install planetary carrier (119) and spacer (118) onto shaft assembly (99). Raise the temperature of bearing cone (117). Install bearing cone (117) onto shaft assembly (99) .



    Illustration 10g01280580

  1. Install rotor (116) and bolts (115) onto shaft assembly (99) .



    Illustration 11g01269983

  1. Install bearing (112) onto shaft assembly (99). Install gear (111), thrust washer (110), spacer (109), sun gear (108), and thrust washer (107) onto shaft assembly (99) .



    Illustration 12g01269976

  1. Install planetary carrier (101) and spacer (100) onto shaft assembly (99). Raise the temperature of bearing cone (98). Install bearing cone (98) onto shaft assembly (99) .



    Illustration 13g01269969

    Intermediate Shaft

  1. Install bearing (97) onto shaft assembly (80). Install gear (96), thrust washer (95), spacer (94), and gear (93) onto shaft assembly (80) .



    Illustration 14g01269968

  1. Install gear (92), spacer (91), and spacer (90) onto shaft assembly (80). Raise the temperature of bearing cone (89). Install bearing cone (89) onto shaft assembly (80) .



    Illustration 15g01280589

  1. Raise the temperature of bearing cone (88). Install bearing cone (88) onto shaft assembly (80) .



    Illustration 16g01270211

  1. Install thrust washer (83) onto shaft assembly (80). Install bearing (85) onto shaft assembly (80). Install gear (84), thrust washer (83), spacer (82), and spacer (81) onto shaft assembly (80). Raise the temperature of bearing cone (79). Install bearing cone (79) onto shaft assembly (80) .



    Illustration 17g01270206

  1. Install seal (78) onto piston (77). Install seals (76) onto shaft assembly (55) and piston (77). Install piston (77) onto shaft assembly (55) .



    Illustration 18g02516957



    Illustration 19g01269767

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Use Tooling (K) in order to install spring (75). Install seal assembly (74) and spacer (73) onto shaft assembly (55). Use Tooling (J) in order to install retaining ring (71) .



    Illustration 20g01269758

  1. Install the friction discs and plates (70) onto shaft (55). Install clutch plate (69). Use Tooling (J) in order to install retaining ring (68). Install thrust washer (67) and bearings (66) .



    Illustration 21g01269751

    Reverse Shaft

  1. Install gear (65) and thrust washer (64). Install spacer (63). Raise the temperature of bearing cone (62). Install bearing cone (62) .



    Illustration 22g01269685

  1. Install spacer (59), gear (58), spacer (57), and spacer (56) onto shaft assembly (55). Raise the temperature of bearing cone (54). Install bearing cone (54) onto shaft assembly (55) .



    Illustration 23g02516016

  1. Attach Tooling (F) and a suitable lifting device to shaft assemblies (52). The weight of shaft assemblies (52) is approximately 370 kg (820 lb). Install shaft assemblies (52) .



    Illustration 24g02442529



    Illustration 25g02442528

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Install seals (46) and (48) onto piston (47) .

  1. Install dowels (44) onto housing (45). Install springs (43). Install plates (42) and discs (41) .



    Illustration 26g02442527

  1. Install ring gear (40) and reaction plate (39). Install bolts (38) .



    Illustration 27g02442526

  1. Install O-ring seals (37) onto clutch assembly (35) .



    Illustration 28g02442156

    Note: Ensure that bolts marked (X) are in position prior to the installation of clutch assembly (35) .

  1. Use two people in order to install clutch assembly (35). The weight of clutch assembly (35) is approximately 25 kg (55 lb). Install bolts (34) .



    Illustration 29g02441421



    Illustration 30g02440726

    Note: Ensure that the gasket surfaces on the case assembly and the mating surface is clean and free of oil and grease.

  1. Apply Tooling (M) to the gasket surface of case assembly (31) .

  1. Position O-ring seals (33) .

  1. Attach Tooling (A) and a suitable lifting device to case assembly (31). The weight of case assembly (31) is approximately 365 kg (800 lb). Install case assembly (31). Install bolts (30) and (32) .



    Illustration 31g02461342

  1. Lower the temperature of bearing cup (27a). Install bearing cup (27a) into bearing cage (27) .



    Illustration 32g02519804



    Illustration 33g02518716

  1. Install bearing cage (27) and install bolts (26) .

    Note: Rotate the shaft during the end play adjustment in order to seat the bearings properly.

  1. Use Tooling (N) at pump drive Location (N) in order to rotate the shaft. This action will properly seat the bearings prior to checking the end play.

  1. Attach Tooling (D) and a suitable lifting device to the shaft assembly. Install Tooling (D). Apply a slight lifting tension on the shaft assembly. Use Tooling (M) in order to check the end play of the shaft assembly. The end play should be .050 to 0.100 mm (0.002 to 0.004 inch). Add or remove shims (25) as required.

  1. Repeat Step 35 through Step 37 for the other bearing cages.



    Illustration 34g02475078



    Illustration 35g02471757

  1. Position retaining ring (153) onto shaft assembly (24) and install gear (152) .

  1. Raise the temperature of bearing (151) and install the bearing onto shaft assembly (24) .

  1. Install spacer (150) onto the shaft assembly.

  1. Raise the temperature of bearing (154) and install the bearing onto shaft the other end of shaft assembly (24) .



    Illustration 36g02440477

  1. Attach Tooling (D) and a suitable lifting device to shaft assembly (24). The weight of shaft assembly (24) is approximately 75 kg (165 lb). Install shaft assembly (24) .



    Illustration 37g02440536

  1. Position gear (23) into place. Position retainer (22) and install bolt (21) .



    Illustration 38g02461316

  1. Lubricate the O-ring seals with the lubricant that is being sealed and install the O-ring seals onto tube assembly (28). Install the tube assembly and install bolt (29) .



    Illustration 39g02687397

  1. Lower the temperature of bearing cup (18) and install the bearing cup into the bearing cage.

  1. Install O-ring seal (20) .



    Illustration 40g02686661

  1. Attach Tooling (A) and a suitable lifting device to Locations (X). The weight of cover assembly (12) is approximately 59 kg (130 lb). Position the cover assembly and install bolts (13) .



    Illustration 41g02475239

  1. Position bearing cage (16) and install bolts (15) .



    Illustration 42g02518336

    Typical Example




    Illustration 43g02518716

    Note: Rotate the shaft during the end play adjustment in order to seat the bearings properly.

  1. Use Tooling (N) at pump drive Location (N) in order to rotate the shaft. This action will properly seat the bearings prior to checking the end play.

  1. Attach Tooling (D) and a suitable lifting device to the shaft assembly. Apply a slight lifting tension to the shaft assembly. Use Tooling (L) in order to check the end play of the shaft assembly. The end play should be between 0.050 mm (0.0020 inch) and 0.100 mm (0.0039 inch). Add or remove shims as required.



    Illustration 44g02687398

  1. Reinstall the bearing cage using Tooling (C) to install lip seal and the O-ring seals.



    Illustration 45g02518416

  1. Install yoke (7), O-ring seal (4) (not shown), retainer (6), and bolt (5) .

  1. Install tube assembly (14) .

  1. If needed use Tooling (A) and a suitable lifting device in order to reposition the transmission. The weight of the transmission is approximately 1315 kg (2900 lb).



    Illustration 46g02387596

  1. Position yoke (11), O-ring seal (8) (not shown), retainer (10), and install bolt (9) .



    Illustration 47g01270685

  1. Lubricate lip seal (148) with the lubricant that is being sealed. Install lip seal (148) into seal ring housing (146) .



    Illustration 48g01270632

  1. Lubricate O-ring seals (147) with the lubricant that is being sealed. Install O-ring seals (147) into seal ring housing (146) .



    Illustration 49g01279115

  1. Install seal ring housing (146) and bolts (145) .



    Illustration 50g02519020

  1. Lubricate ring seals (53) with the lubricant that is being sealed. Install ring seals (53) onto seal carrier (61). Position seal carrier (61) and install bolts (60) .

  1. Lubricate ring seals (53) with the lubricant that is being sealed. Install ring seals (53) onto seal carrier (87). Position seal carrier (87) and install bolts (86) .

  1. Lubricate ring seals (53) with the lubricant that is being sealed. Install ring seals (53) onto seal carrier (114). Position seal carrier (114) and install bolts (115) .

  1. Install the covers and O-ring seals.



    Illustration 51g02440856

  1. Position Yoke (51), O-ring seal (not shown), retainer (49), and install bolt (50) .



    Illustration 52g02359576

  1. Lubricate the input speed sensor O-ring seal with the lubricant that is being sealed prior to installation. Position harness assembly (3) and connect the harness assembly.

  1. Install bolts (1) and (2) .

Caterpillar Information System:

UPS 1000Z, UPS 1200Z, UPS500G and UPS600G Uninterruptible Power Supplys System Description
UPS 1000Z, UPS 1200Z, UPS500G and UPS600G Uninterruptible Power Supplys Model View Illustrations
UPS 1000Z, UPS 1200Z, UPS500G and UPS600G Uninterruptible Power Supplys Oil Level - Check
UPS 1000Z, UPS 1200Z, UPS500G and UPS600G Uninterruptible Power Supplys Sight Gauge - Clean
UPS 1000Z, UPS 1200Z, UPS500G and UPS600G Uninterruptible Power Supplys Flywheel - Clean
UPS 1000Z, UPS 1200Z, UPS500G and UPS600G Uninterruptible Power Supplys Air Filter Element - Clean/Replace
UPS 1000Z, UPS 1200Z, UPS500G and UPS600G Uninterruptible Power Supplys Battery - Replace
UPSB505 Uninterruptible Power Supply Static Switch Connection
312F and 313F Excavators Sound Information and Vibration Information
G3304B and G3306B Engines Carburetor - Assemble
UPSB505 Uninterruptible Power Supply Parallel UPS Connection
G3304B and G3306B Engines Carburetor - Disassemble
2011/03/09 A New Grease Fitting Is Available for the Fan Drives on Certain C7 Industrial Engines {0645, 1359}
300.9D and 300.9D VPS Mini Hydraulic Excavator Undercarriage - Check
C15 Petroleum Engines Engine Oil Level Gauge - Calibrate
2011/03/11 Instructions to Obtain and Upload a Warranty Report File Are Now Available for C4.4 through C32 Tier 4 Interim Engines {0336, 7772}
2013/06/11 Use the Latest Available Production Version of Cat ET on All Machines with Tier 4 Interim C4.4 through C32 Engines {0785, 7600, 7610}
2011/03/11 Use the Latest Available Production Version of Cat ET for Tier 4 Interim C4.4 though C32 Engines {0785, 1900, 7610}
UPS 1000Z, UPS 1200Z, UPS500G and UPS600G Uninterruptible Power Supplys Related Options
C13 Industrial Engine Engine Oil Level - Check
Instructions to Obtain and Upload a Warranty Report File for C4.4 through C32 Tier 4 Interim Engines {0336, 7772} Instructions to Obtain and Upload a Warranty Report File for C4.4 through C32 Tier 4 Interim Engines {0336, 7772}
C15 Petroleum Engines Engine Oil and Filter - Change
UPS 1000Z, UPS 1200Z, UPS500G and UPS600G Uninterruptible Power Supplys System Startup
2011/03/22 A New Hose Clamp Is Now used on Certain Engines {1361, 1380, 7553}