Installation Procedure
Show/hide table
Table 1
Required Tools     |
Tool     |
Part Number     |
Part Description     |
Qty     |
A     |
6V-0014     |
Hydraulic Cylinder     |
1     |
9U-6698 |
Puller Stud     |
1     |
5M-6667 |
Nut     |
1     |
6V-2073 |
Bushing     |
1     |
4C-9491 |
Sleeve     |
1     |
6V-0027 |
Plate     |
1     |
3S-6224 |
Electric Hydraulic Pump     |
1     |
B     |
128-4775     |
Lifting Bracket Gp     |
1     |
206-3481 |
Adapter Plate     |
1     |
C     |
6V-6080     |
Torque Multiplier     |
1     |
D     |
1U-9203     |
Lever Puller     |
2     |
E     |
9U-7960     |
Void Meter     |
1     |
Note: Check all of the O-ring seals and the components for wear or damage. Replace the components, if necessary. Lubricate O-ring seals lightly with the lubricant that is being sealed.
Show/hide table
|
|
|
Illustration 1 | g00617415 |
- Lower the temperature of sleeve bearing (47) (not shown) to -40 °C (-40 °F). Thoroughly clean the bore of the arm. Install Tooling (A) . Install sleeve bearing (47) (not shown). Install the sleeve bearing until the sleeve bearing is 10 ± 0.5 mm (0.4 ± 0.02 inch) below the surface of the arm.
Show/hide table
|
|
|
Illustration 2 | g00544366 |
- Apply 7M-7456 Compound to the bore of the lever and bearing assembly prior to installation of the seals. Use a mallet in order to install two seals (46) in the lever and bearing assembly.
- Repeat Step 1 and Step 2 for the remaining sleeve bearing and seals.
Show/hide table
|
|
|
Illustration 3 | g00533695 |
- Position arm and bearing assembly (14) for installation. The weight of the arm and bearing assembly with the lever and bearing assembly is 22,100 kg (48,700 lb).
Show/hide table
|
|
|
Illustration 4 | g00617419 |
Show/hide table
|
|
|
Illustration 5 | g00544371 |
- If necessary, install shims (37) in order to fill the gaps between the arm and bearing assembly and the non-engine end frame.
- Use Tooling (B) to install pin (36) . Center the pin axially. The weight of the pin is 140 kg (310 lb).
Show/hide table
|
|
|
Illustration 6 | g00545266 |
Show/hide table
|
|
|
Illustration 7 | g00544363 |
Show/hide table
|
NOTICE |
After 50 hours of operation, tighten the collet bolts to 1800 ± 200 N·m (1330 ± 150 lb ft). Failure to tighten the collet bolts may result in damage to the machine. |
|
- Thoroughly clean the inside and outside of collets (34) and (35) (not shown). Apply 5P-3931 Anti-Seize Compound to the inside and outside of collets (34) and (35) (not shown) prior to assembly. Center collets (34) and (35) (not shown) in the bores of the lever and bearing assembly.
- Apply 5P-3931 Anti-Seize Compound to the threads of bolt (33) . Install bolt (33) , the washers, and the nut into collets (34) and (35) (not shown). Perform the following steps in order to properly install the collets:
- Use Tooling (C) in order to tighten the bolt to a torque of 1800 ± 200 N·m (1330 ± 150 lb ft).
- Sufficiently strike the collets with a hammer in order to cause the torque to drop to less than 950 N·m (700 lb ft).
- Use Tooling (C) in order to tighten the bolt to a torque of 1800 ± 200 N·m (1330 ± 150 lb ft).
- Sufficiently strike the collet with a hammer in order to cause the torque to drop to less than 1600 N·m (1180 lb ft).
- Use Tooling (C) in order to tighten the bolt to a torque of 1800 ± 200 N·m (1330 ± 150 lb ft).
Show/hide table
|
|
|
Illustration 8 | g00533691 |
- Install guard assembly (44) , as shown.
- Install bolt (45) , the washers, and the nut.
- Repeat Step 5 through Step 8 for the remaining pin.
Show/hide table
|
|
|
Illustration 9 | g00533690 |
Show/hide table
|
|
|
Illustration 10 | g00533688 |
- Install three bolts (42) , the washers, the mounts, and the spacers in order to install sensor assembly (43) .
Show/hide table
|
|
|
Illustration 11 | g00533619 |
- Install three bolts (39) and the washers in order to install plate (40) .
- Connect rod (38) to the position sensor. Connect wiring harness (41) at the electrical connection.
Show/hide table
|
|
|
Illustration 12 | g00533476 |
- Connect three hose assemblies (32) to manifold block (31) .
- Repeat Step 15 for the opposite side.
Show/hide table
|
|
|
Illustration 13 | g00533471 |
- Install two bolts (30) and the washers in order to connect manifold (29) to the non-engine end frame.
Show/hide table
|
|
|
Illustration 14 | g00533466 |
- Install bolt (28) and the washer in order to connect relief valve (27) to manifold (26) .
Show/hide table
|
|
|
Illustration 15 | g00533397 |
- Install guard assembly (25) with four bolts (24) and the washers.
Show/hide table
|
|
|
Illustration 16 | g00533163 |
- Position a suitable lifting sling around lift cylinder (18) . Fasten the other end of the suitable lifting sling to a hoist. Position the lift cylinder for installation.
Show/hide table
|
|
|
Illustration 17 | g00617445 |
- Use Tooling (B) to install pin (23) . Center the pin axially. The weight of the pin is 66 kg (145 lb).
Show/hide table
|
|
|
Illustration 18 | g00545299 |
Show/hide table
|
NOTICE |
After 50 hours of operation, tighten the collet bolts to 1800 ± 200 N·m (1330 ± 150 lb ft). Failure to tighten the collet bolts may result in damage to the machine. |
|
- Thoroughly clean the inside and outside of collets (21) and (22) (not shown). Apply 5P-3931 Anti-Seize Compound to the inside and outside of collets (21) and (22) (not shown) prior to assembly. Center collets (21) and (22) (not shown) in the bores.
- Apply 5P-3931 Anti-Seize Compound to the threads of bolt (20) . Install bolt (20) , the washers, and the nut into collets (21) and (22) (not shown). Perform the following steps in order to properly install the collets:
- Use Tooling (C) (not shown) in order to tighten the bolt to a torque of 1800 ± 200 N·m (1330 ± 150 lb ft).
- Sufficiently strike the collets with a hammer in order to cause the torque to drop to less than 950 N·m (700 lb ft).
- Use Tooling (C) (not shown) in order to tighten the bolt to a torque of 1800 ± 200 N·m (1330 ± 150 lb ft).
- Sufficiently strike the collet with a hammer in order to cause the torque to drop to less than 1600 N·m (1180 lb ft).
- Use Tooling (C) (not shown) in order to tighten the bolt to a torque of 1800 ± 200 N·m (1330 ± 150 lb ft).
- Connect hose assembly (19) .
- Repeat Step 20 through Step 24 for the remaining lift cylinder.
Show/hide table
|
|
|
Illustration 19 | g00533159 |
Show/hide table
|
|
|
Illustration 20 | g00533161 |
- Position a suitable lifting strap around flood lighting (15) .
- Install eight bolts (17) and the washers.
- Connect wiring harness (16) at the electrical connection.
- Repeat Step 26 through Step 28 for the remaining flood light.
Show/hide table
|
|
|
Illustration 21 | g00533158 |
- Lower arm and bearing assembly (14) from the support.
Show/hide table
|
|
|
Illustration 22 | g00617454 |
- Attach Tooling (D) on lever and bearing assemblies (7) .
Show/hide table
|
|
|
Illustration 23 | g00541048 |
- Place a suitable sling around tilt cylinder (8) . Fasten the suitable sling to a hoist. Position the tilt cylinder for installation of the pin.
Show/hide table
|
|
|
Illustration 24 | g00617462 |
- Use Tooling (B) to install pin (13) . Center the pin axially. The weight of the pin is 55 kg (120 lb).
Show/hide table
|
|
|
Illustration 25 | g00544967 |
Show/hide table
|
|
|
Illustration 26 | g00545225 |
Show/hide table
|
NOTICE |
After 50 hours of operation, tighten the collet bolts to 1800 ± 200 N·m (1330 ± 150 lb ft). Failure to tighten the collet bolts may result in damage to the machine. |
|
- Thoroughly clean the inside and outside of collets (10) and (12) (not shown). Apply 5P-3931 Anti-Seize Compound to the inside and outside of collets (10) and (12) (not shown) prior to assembly. Center collets (10) and (12) (not shown) in the bores.
- Apply 5P-3931 Anti-Seize Compound to the threads of bolt (9) . Install bolt (9) , the washers, and the nut into collets (10) and (12) (not shown). Perform the following steps in order to properly install the collets:
- Use Tooling (C) in order to tighten the bolt to a torque of 1800 ± 200 N·m (1330 ± 150 lb ft).
- Sufficiently strike the collets with a hammer in order to cause the torque to drop to less than 950 N·m (700 lb ft).
- Use Tooling (C) in order to tighten the bolt to a torque of 1800 ± 200 N·m (1330 ± 150 lb ft).
- Sufficiently strike the collet with a hammer in order to cause the torque to drop to less than 1600 N·m (1180 lb ft).
- Use Tooling (C) in order to tighten the bolt to a torque of 1800 ± 200 N·m (1330 ± 150 lb ft).
Show/hide table
|
|
|
Illustration 27 | g00581923 |
- Connect hose assembly (11) .
- Repeat Step 31 through Step 36 for the remaining tilt cylinder.
Show/hide table
|
|
|
Illustration 28 | g00545298 |
- Position link and bearing assembly (3) for installation. The weight of the link and bearing assembly is 559 kg (1230 lb).
- Place a suitable lifting sling around pin assembly (4) . Attach the other end of the suitable lifting sling to a hoist. Install pin assembly (4) . The weight of the pin assembly is 74 kg (162 lb).
Show/hide table
|
|
|
Illustration 29 | g00540978 |
- Install O-ring seal (6) on pin assembly (4) .
Show/hide table
|
|
|
Illustration 30 | g00532364 |
- Install bolt (5) , the washer, and the spacer.
Show/hide table
|
|
|
Illustration 31 | g00545268 |
- Install plate (2) . Install three bolts (1) and the washers.
Show/hide table
|
|
|
Illustration 32 | g00545275 |
Show/hide table
|
|
|
Illustration 33 | g00545282 |
- Remove O-ring plug (48) and the O-ring seal from link and bearing assembly (3) .
- Add 250 cc (15.3 in3) of 2P-9863 Lubricant to the pin assembly. Use Tooling (E) in order to check the air void after adding the lubricant. Use the 30 cc (1.8 in3) calibration tube that is included with the tooling in order to calibrate Tooling (E) . The air void must be between 25 kPa (3.5 psi) and the measurement that was obtained with the 30 cc (1.8 in3) calibration tube. Add or subtract lubricant in order to achieve the correct pressure reading from Tooling (E) .
- After the air void is correct and the correct amount of 2P-9863 Lubricant has been added, install O-ring plug (48) and the O-ring seal.
- Repeat Step 38 through Step 45 for the remaining pin assembly.
End By: