Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | 395-1591 | Lifting Eye Assembly | 3 |
The Power Train Electric Drive System and the Accessory Power System will contain hazardous voltage levels during machine operation and for a period of time after machine shutdown. Do not remove any covers that will expose energized electrical components while the engine is operating. Do not remove any covers that will expose the energized electrical components while the components remain energized following an engine shutdown. Do not perform any type of electrical maintenance on the orange hazardous voltage conductors, the power train components or the accessory power system components while the engine is operating. Do not perform any type of electrical maintenance on the orange hazardous voltage conductors, the power train components or the accessory power system components while the components remain energized following an engine shutdown. Always perform the safe shutdown and de-energizing procedure before performing electrical service on the Power Train Electric Drive System or the Accessory Power System. Failure to follow these instructions could result in personal injury or death. |
- Refer to Operation and Maintenance Manual, "Prepare the Machine for Maintenance".
- Refer to Operation and Maintenance Manual, "Electrical Shutdown and Voltage Discharge".
Show/hide table
Illustration 1 g03785834 - Disconnect harness assembly (1).
Show/hide table
Illustration 2 g03785835 - Disconnect harness assembly (2).
Show/hide table
Illustration 3 g03785841 - Open electrical box (3).
Show/hide table
Illustration 4 g03785842 - Disconnect all connection of harness assembly (4). Loosen locknut (5). Pull harness assembly (4) from the electrical box.
Show/hide table
Illustration 5 g03785844 - Disconnect clip (6).
Show/hide table
Illustration 6 g03785998 - Disconnect harness assembly (7).
Show/hide table
Illustration 7 g03786001 - Disconnect clips (8) and clips (9). Position harness assembly (4) and harness assembly (7) out of the way.
Show/hide table
Illustration 8 g03786012 Show/hide tableIllustration 9 g03786058 - Remove bolts (10). Pull gauge assembly (11) from the side of the hood enough to disconnect hose assemblies (12) and remove gauge assembly (11).
Show/hide table
Illustration 10 g03786065 - Attach Tooling (A) and a suitable lifting device onto hood assembly (13). The weight of hood assembly (13) is approximately
951 kg (2097 lb) .Show/hide tableIllustration 11 g03786156 - Loosen clamp assembly (14) and position hose assemblies (15) out of the way.
Show/hide table
Illustration 12 g03786460 Show/hide tableIllustration 13 g03786479 - Remove bolt (17), hard washers (18), shock mount (19), and nut (20). Record the locations and quantities of washer (18) for installation purposes. Repeat this step for the opposite side.
Show/hide table
Illustration 14 g06398186 - Remove bolt (21), hard washers (22), shock mount (23), and nut (24). Record the locations and quantities of washer (22) for installation purposes. Repeat this step for the opposite side.
Show/hide table
Illustration 15 g03786478 - Use Tooling (A) and the suitable lifting device to remove hood assembly (13). The weight of hood assembly (13) is approximately
951 kg (2097 lb) .
- Use Tooling (A) and the suitable lifting device to install hood assembly (13). The weight of hood assembly (13) is approximately
951 kg (2097 lb) .Show/hide tableIllustration 17 g06398186 - Install bolt (21), hard washers (22), shock mount (23), and nut (24). Repeat this step for the opposite side.
- Add or remove hard washers (22) to achieve a minimum clearance of
12 mm (0.5 inch) between hood assembly (13) and the top tank of the radiator and align the top hood surface with the superstructure.Show/hide tableIllustration 18 g03786460 Show/hide tableIllustration 19 g03786479 Show/hide tableIllustration 20 g06398310 - Install bolt (17), hard washers (18), shock mount (19), and nut (20). Repeat this step for the opposite side.
- Add or remove hard washers (18) to achieve a minimum clearance of
12 mm (0.5 inch) between hood assembly (13) and the superstructure.Show/hide tableIllustration 21 g03786156 - Position hose assemblies (15) and tighten clamp assembly (14).
Show/hide table
Illustration 22 g03786065 - Remove Tooling (A) and the suitable lifting device from hood assembly (13).
Show/hide table
Illustration 23 g03786012 Show/hide tableIllustration 24 g03786058 - Install gauge assembly (11) and hose assemblies (12). Install bolts (10).
Show/hide table
Illustration 25 g03786001 - Position harness assembly (4) and harness assembly (7). Connect clips (8) and clips (9).
Show/hide table
Illustration 26 g03785998 - Connect harness assembly (7).
Show/hide table
Illustration 27 g03785844 - Cnnect clip (6).
Show/hide table
Illustration 28 g03785842 - Insert assembly (4) into the electrical box. Connect all connection of harness assembly (4). Tighten locknut (5).
Show/hide table
Illustration 29 g03785841 - Close electrical box (3).
Show/hide table
Illustration 30 g03785835 - Connect harness assembly (2).
Show/hide table
Illustration 31 g03785834 - Connect harness assembly (1).
Illustration 16 | g03786478 |